Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Permit
r CITY OF TIGARD BUILDING PERMIT 2 COMMUNITY DEVELOPMENT Permit #: BUP2011 -00030 Tr 6 G AR D 13125 SW Hall Blvd., Tigard OR 97223 503.718.2439 Date Issued: 03/03/2011 Parcel: 1S1260000300 Jurisdiction: TIGARD Site address: 9640 SW WASHINGTON SQUARE RD G11 Project: Hanna Andersson Subdivision: WASHINGTON SQUARE MALL Lot: 0 Project Description: TI Contractor: DICKINSON CAMERON CONSTRUCTION CO INC Owner: PPR WASHINGTON SQUARE LLC 444 S BLOUNT ST STE 115A 2235 FARADAY AVE STE #0 RALEIGH, NC 27601 CARLSBAD, CA 92008 PHONE: 619 - 572 -7180 PHONE: FAX: FEES Specifics: Description Date Amount Type of Use: COM Permit Fee - Additions, Alterations, 03/03/2011 $1,558.95 Class of Work: ALT Demolition Dwelling Units: 0 Plan Review 02/04/2011 $1,013.32 Stories: 0 Height: 0 ft Plan Review - Fire Life Safety 02/04/2011 $623.58 Bedrooms: 0 Bathrooms: 0 12% State Surcharge - Building 03/03/2011 $187.07 Value: $175,000 Info Process /Archiving - Lg Sheet (over 03/03/2011 $36.00 11x17) Metro Const. Excise Tax - Residential 03/03/2011 $210.00 Use Floor Areas: DC Provision Review, COM TI - Ping 03/03/2011 $256.00 Total Area: 0 DC Provision Review, COM TI - LRP 03/03/2011 $38.00 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $3,922.92 Required: Required Items and Reports (Conditions) Fire Sprinkler: Yes Parapet: Fire Alarm: Protected Corridors: No Smoke Detectors: Manual Pull Stations: No Accessible Parking: 0 This permit :s -isso ect to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be dohein accordance wit approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days( ATTENTION: Oregon you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952- 001 -0010 through OAR 95 -001 -0 0 ou may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.3 .2344. i ,'/ Issue4By: � +' L � � , Perm ittee Signature: Call 503.639.4175 by 7:00 a.m. for the next available in ection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. r Buildin Permit A licatio -. CENED Commercial ; City FOR OFFICE USE ONLY 1114 III Cit of T i and B � S ? i 1 R g D eceived ateJB : /. ©�mpA Permit No.: Au aia / 'ese • 13125 SW Hall Blvd., Tigard, OR 97223 plan Review n ' Phone: 503.639.4171 Fax: 503.598.19 o f TIG Al DateB : .L 3 3 Other Penult: l ` � T I G A R. D Inspection Line: 503.639.4175 G DIN la Date Read _ / /L_ 1ws: Supplemental See Page 2 for Internt: www.tigard- or.gov gvILD1N N� fiedJMethod: S 7 / �� �yJ Supplemental Informatio '^q t a�' -... 4.g5_ 't� � i 'w �� a 3 .t+ yd.T Y `[ �, l 3 S - k G . o , �.. i , _ , {v,.�>.' . �',. 7 s t l � Y, ",,. id - 4 ,�.. '. d ..ti,. ..'A a^ t ." . ,: 1. ? ti 4 :::::, a k :.', i l .. 4 ,, n Flo, s ❑ New construction ❑ Demolition Permit fees* are based on the value of the work performed. Indicate the value (rounded to the nearest dollar) of all Addition/alteration /replacement ❑ Other: equipment, materials, labor, overhead, and the profit for the - W i7 s y .T , y i -; " ,;� work indicated on this application. ' ❑ I- and 2- family dwelling _ _ Valuation: $ ►� Commercial/industrial El Accessory building ❑ Multi-family Number of bedrooms: ❑ Master builder ❑ Other. Number of bathrooms: . c .,. '/ °-:;; 4ii i €i4 ` t c :- ) s z ., Total number of floors: Job site address: L- ; SW Wb5141NCanN' SQUO e--C4b New dwelling area: square feet City/State/ZIP: - ri6p,,Q-0 1 04 g7 223 Garage/carport area: square feet Suite/bldg. /apt. no.: G 11 Project name: 44 f,44 p4 A. ANDERSSON Covered porch area: square feet Cross street/directions to job site: Deck area: square feet Other structure area: square feet e' a a1 , S - d Ott 32i 11 Subdivision: WtISr 11 C117:1 N )by( Lot no.: Permit fees* are based on the value of the work performed. Indicate the value (rounded to the nearest dollar) of all Tax map /parcel no.: equipment, materials, labor, overhead, and the profit for the ' a i t 3 ° -' k a a , 4? r t work indicated on this application. T" r. i % O our Valuation: $ dap Existing building area: 1144. square feet New building area: O square feet .4 1...`..zM e ��iip.;; 11 ` °.ti....,.. ii ) V;: z � � Number of stories: Name: 141s4.41,4 Q. Am gssin N Type of construction: 2 B Address: 1C fV N W FLt*ADV16 S` IZEEr Occupancy groups: M City/State/ZIP: p014,Tt_t4NO i OR- • 97209 Existing: M Phone: (503) 553 354j Fax: ( ) New: m Business name: 12 L Pt All contractors and su bcontr a cttors are required to be Contact name: DANK) I DTK licensed with the Oregon Construction Contractors Board under ORS 701 and may be required to be licensed in the Address: 5 too 1ZIV Ee.. R 1 3 u 1 T E 125 jurisdiction in which work is being performed. If the City/State/ZIP: Sc- Itd_EQ- P✓�-� IL. (001 applicant pp1 is exempt from licensing, the following reasons +f a Phone: (1341)41114S2. X 15Co I Fax:: (g41) (071- 1- 4200 E-mail: b 1-EE,. kE e R4LA. Coll Business name: - b, s Address: T `i `/ J. ; L&# / J 5-?_ � �. l plan . s i; eep liertut e,' saq 3 City/ State/ZIP: ¢ i+_ j t a?4,D r Structural pla review fee (or deposit): ' (p G u I w ) /// "' l r FLS plan review fee (if applicable): Phone!41)1 `"572--7` ?60 I Fax:( ) CCB lie.: I l toil Total fees due upon application: Amount received: Authorized signature: This permit application expires if a permit is not obtained j within 180 days after it has been accepted as complete. Print name: T)t (p 1 10 r.e_ Date: / 2/ 1 1 * Fee methodology set by Tri -County Building Industry Service Board. I: \Building\Permits\BIJP -EOM PermitApp.doc 10/01 /09 440 4613T(11 /02 /COMPWEB) RECEIVED FR 4 2r311 lig Building Division • CITY OF TIGARD Accessibility: Barrier Removal Improvement Plan BUILDING DIVISION TIGARD REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241. • (1) Every project for renovation, alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty -five per -cent (25 %). VALUATION: Total of all renovation, alteration or modification being done, excluding painting and wallpapering: [1] $ MULTIPLIER (25% barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ ELEMENTS: In choosing which accessible elements to provide under this section, priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking E_)( K(a 80l -D1 $ (b) An accessible entrance: — 15T It-V.1 O I L-0 11.1G $ • (c) An accessible route to the altered area: — E)(15T 1 H (a $ (d) At least one accessible restroom for each sex or a single unisex restroom: E)( 1STI14(a 50 ILDI L1(I $ (e) Accessible telephones: S Ti N Ca &) II.DI QE $ (f) Accessible drinking fountains: and, — V -)LIST 1M $ BC) I C.4)1 IJGI (g) When possible, additional accessible elements such as storage and alarms: — EX k 5T1 NC B BO ILD Ir , TOTAL (shall equal line [2] of Valuation Computation): $ 1: \Building \Permits \BUP -COM PermitApp.doc 06/25/08 t RECEIVED III _ Building Division FEB 4 2011 Development Code Provision Review CITY OF TIGARD TIGARD Commercial Projects - No Associated Land Use CI SKDING DIVISION Building Permit No: 1 bu P all - OD(� cO ❑ Expedited Review Plan Submittal Date: 02/9 / To the Applicant: ➢ If the proposed use is not permitted within the zone, please contact the Building Division to cancel the permit application. Building Permit Technicians (503) 718 -2439. > If a land use is required and for all other questions, please contact the staff person listed above the Planning Review section. Staff: please check items along left only if approved. Plan n Review ( contact � — at 503 -7181 �`_ or [ @tigard- or.gov) e Zonin g / 14 Pt 6 Permitted Use Yes ❑ No ❑ Er—Land Use Required: Yes ❑ No Er (explain below) Notes: 40 - -/.PN. l Aei -e-- A pproved ❑ Not Approved Dat // Permit Coordinator Review (contact Albert Shields at 503 - 718 -2426 or albert @tigard - or.gov) Notes: N i A-- Routed back to Building Division Date: ' I: \CURPLN -J Commercial Application Checklist RECEIVED B 42011 City of Tigard 13125 SW Hall Blvd., Tigard, OR 97223 CITY OF TIGARD Phone: 503.639.4171, Fax: 503.598.1960 BUILDING DIVISION T u n x t) Internet address: www.tigard - or.gov PROJECT INFORMATION Project name: NN Am sol'`{ Date: 2. Ft , 20 Address: 1'585 SW wbattiA4n4 SOu1tQE 50I1E6ii City:116PM State: p(Z_ I ZIP: `i'7 2.Z Scope of work: T 1 p„.►T '� I lI) 00-v Reference no.: Map and tax -lot no.: Contact person name: DAN I p Kt DT -€- Company: 2.6 L p, Phone: ®41- f7 � ' -145.2„ X 15 C0 Fax: 8 4- - � o 7I " ,4 2, Cellular phone: E- mail: DTE c2., gGLA. Cwt"( NOTES AND INSTRUCTIONS • The purpose of this checklist is to help define a complete submittal package for the scope of work. Plan review will not take place until a complete package is submitted. • This checklist can be used for all commercial construction projects, including new construction, additions, alterations and tenant improvements. • For complex projects, applicants should use the "location" space to note the item's location and page number from the plans or the specification book. • It is not necessary to duplicate submittal information, even if it is asked for in multiple sections. • In the checklist, "Required" means that the applicant must provide this information for plan review. • In the checklist, "P" means — • if checked by the applicant — the information is provided for the plan review. • if checked by the plans reviewer — this information is required for the plan review. • In the checklist, "NA" means that the information does not apply. • Choose only those sections of the checklist that apply to your scope of work. Section 1.0, "General Project Data," must be included with each •ro submitted. PRE - SUBMITTAL PROCESS An applicant may request a pre - submittal meeting with representatives of the jurisdiction in which the project will be built. The meeting may take place during the conceptual, schematic, or in- progress phase, or when the applicant has completed plans. INDEX OF CHECKLIST SECTIONS 1.0 General project data Page 2 7.0 Mechanical data (Types I and H 2.0 Civil data Page 2 kitchen -hood permits) Page 6 3.0 Architectural data Page 3 8.0 Plumbing data Page 7 4.0 Structural data Page 4 9.0 Electrical data Page 8 5.0 Mechanical data (new construction, tenant 10.0 Fire - suppression data Page 9 improvement, gas - piping permits) Page 5 11.0 Fire - detection and fire -alarm data Page 9 6.0 Mechanical data (additional or replacement 12.0 Re -roof installation data Page 10 rooftop- equipment installation permits) Page 6 13.0 Jurisdictional requirements Page 10 This checklist is for building department jurisdictions in Clackamas, Multnomah, and Washington counties. 440 -2734 (8 /01/WEB /COM) I:\BuildingForms \COM- Checklist.doc 02/02/11 SECTION 1.0 — GENERAL PROJECT DATA Construction documents Location (sheet number or spec section) 1 ® Required No. of sets of plans: New: 1 TI: 2 1.2 ® Required Cover sheet title block 1.3 ® Required Cover sheet vicinity map 1.4 ® Required Cover sheet plan index G -ao 1.5 J P ❑ NA Code summary 6-0.0 1.6 ❑ P NA Deferred submittal summary 1.7 *, P 1 NA Professional stamp and signature 4&Z. 544E.A CS �- 1.8 ❑ P ❑ NA Fire and life -safety plan 8Y Lt-• 2 F-� c 1.9 ❑ P A NA Landscape plan 1.10 ❑ P jg NA Landscape specifications Supporting documents Notes 1.20 ❑ P iJ NA Land -use or planning actions 1.21 ❑ P Is NA Required fire -flow calculations 1.22 ❑ P NA Fire - hydrant flow -test report 1.23 ❑ P NA Fire department or fire district building survey report 1.24 ❑ P 71 NA Material safety data sheets (MSDS) SECTION 2.0 — CIVIL DATA Construction documents Location (sheet number or spec section) 2.1 ® Required Site plan I %ATER-402 aV I LDOJ s 2.2 ® Required Site utility plan 2.3 ® Required Grading plan 2.4 ® Required Erosion - control plan 2.5 ❑ P iK NA Utility-vault location and details Supporting documents Notes 2.20 ❑ P 74 NA Geotechnical/soil engineer report 2.21 ❑ P NA Storm -water calculations 2.22 ❑ P xi NA Site retaining -wall structural calculations 2.23 ❑ P g NA "Assurance of Compliance" with environmental rules 440 - 2734 (8 /01/WEB /COM) Tri- County Commercial Application Checklist 2 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties I:\Bui Iding\Forms \COM -Check list.doc SECTION 3.0 — ARCHITECTURAL DATA Construction documents Location (sheet number or spec section) • 3.1 ® Required Floor plan(s) Ada 3.2 ® Required Transverse and longitudinal cross sections L 3.3 ® Required OSSC Chapter 11 accessibility requirements r1.1 3.4 P ❑ NA Interior elevations 3.5 P ❑ NA Exterior elevations Pk 3.6 IN P ❑ NA Roof plans 3.7 ❑ P p, NA Exterior wall sections and details 3.8 P ❑ NA Reflected ceiling plan(s) -2 3.9 P ❑ NA Fire -rated construction details /v1.1 3.10 El P . tg NA Energy code compliant construction details and specifications , 3.11 P ❑ NA Door schedule Add 3.12 ❑ P ❑ NA Glazing schedule P..3.1 3.13 ❑ P ❑ NA Furniture plan E• I. Supporting documents Notes 3.20 P ❑ NA Energy code compliance forms /calculationsTIZ1rtEZ 3.21 ❑ P NA Material safety data sheets (MSDS) 3.22 ❑ P NA Hazardous materials inventory statement (HIvIIS) 3.23 ❑ P ® NA Hazardous materials management plan (HMMIP) 3.24 ❑ P NA Written fire and life -safety evacuation plan for area of rescue assistance 3.25 ❑ P ® NA Active and passive smoke - control information 440 - 2734 (8/01 /WEB /COM) Tri-County Commercial Application Checklist 3 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties i s \Bui1ding \Forms \COM- Checklist.doc SECTION 4.0 — STRUCTURAL DATA Construction documents – NO ST(ZU Location (sheet number or spec section) 4.1 ® Required Structural cover sheet 4.2 ❑ P ❑ NA Foundation plan 4.3 ❑ P ❑ NA Under -slab mechanical plan 4.4 ❑ P ❑ NA Under -slab electrical plan 4.5 ❑ P ❑ NA Under -slab plumbing plan 4.6 ❑ P ❑ NA Floor framing plan 4.7 ❑ P ❑ NA Roof framing plan 4.8 ❑ P ❑ NA Structural elevations 4.9 ❑ P ❑ NA Structural details and cross sections 4.10 ❑ P ❑ NA Standpipe information 4.11 ❑ P ❑ NA Special inspector /structural observation matrix Supporting documents Notes 4.20 ❑ P ❑ NA Geotechnicaisoil engineer report 4.21 ❑ P ❑ NA Site - specific seismic hazard report 4.22 ❑ P ❑ NA Design narrative 4.23 ❑ P ❑ NA Structural calculations 440 -2734 (8/01 /WEB /COM) Tri- County Commercial Application Checklist 4 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties I:\Bu i l d i n g\Forms \CO M -Chec k l i st. do c SECTION 5.0 - MECHANICAL DATA (New construction, tenant improvement, gas piping permits) Construction documents Location (sheet number or spec section) 5.1 ® Required Floor plan • M -I.1 5.2 ® Required Equipment schedule M-1.1 5.3 ❑ P IN NA Site plan 5.4 ❑ P ' NA Under -slab mechanical plan 5.5 ❑ P A NA Roof plan 5.6 ❑ P Eg NA Fuel gas piping plan 5.7 ' I P ❑ NA HVAC equipment and duct plan(s) K -I. I 5.8 ❑ P NA Roof access details 5.9 ❑ P NA Duct smoke detector plans 5.10 ❑ P NA Fire /smoke damper locations 5.11 ❑ P yip NA Smoke control plan 5.12 ❑ P IN NA Outside air (OSA) table 5.13 ❑ P NA Refrigeration equipment and piping plan 5.14 ❑ P tg NA Kitchen equipment plan 5.15 ❑ P $ NA Type I and/or Type II kitchen hood plan (see Section 7.0 - Mechanical Data) 5.16 ❑ P NA Fume /vapor hood plan 5.17 ❑ P NA Process piping /product and/or exhaust- conveying duct plan 5.18 ❑ P K] NA Fire -rated construction details 5.19 ❑ P NA Equipment hanger /fastener details Supporting documents Notes 5.20 ® Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds NdV* 46 &1 4° 5.21 ❑ P IA NA Equipment manufacturers' catalog "cut sheets" or specifications 5.22 ❑ P ' NA Outside air (OSA) calculations 5.23 ❑ P I, NA Smoke - control calculations 5.24 ❑ P xi NA Combustion air calculations 5.25 ❑ P ($ NA Fuel gas piping sizing calculations 5.26 ❑ P 71 NA Make -up air calculations 5.27 ❑ P 1 NA Energy code compliance forms 5.28 ❑ P [yr NA Boiler information 440 - 2734 (8 /01/WEB /COM) Tri- County Commercial Application Checklist 5 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties i:\Bui lding \Forms \COM- Checklist.doc SECTION 6.0 — MECHANICAL DATA (Additional or replacement rooftop installation permits) Construction documents Location (sheet number or spec section) 6.1 ® Required Roof plan Nonkt146 N 6.2 0 P i4 NA Roof framing plan 6.3 ❑ P 71 NA Fuel gas piping plan 6.4 ❑ P g NA Roof access details Supporting documents Notes 6.20 ® Required Structural calculations for vertical loads and lateral Nc7t1�1N0 Net loads for equipment weighing over 400 pounds 6.21 ❑ P NA Equipment manufacturers' catalog "cut sheets" or specifications 6.22 ❑ P xi NA Fuel gas piping sizing calculations 6.23 ❑ P ►.' NA Energy code compliance forms SECTION 7.0 — MECHANICAL DATA (Type I and Type II kitchen hood permits) Construction documents Location (sheet number or spec section) 7.1 ® Required Site plan 7.2 ® Required Floor plan(s) 7.3 ® Required Kitchen equipment plan 7.4 ® Required Kitchen equipment and hood elevations 7.5 ❑ P ❑ NA Roof plan 7.6 ❑ P ❑ NA Cross sections through hoods, ducts and shafts 7.7 ❑ P ❑ NA Fire -rated construction details 7.8 ❑ P ❑ NA Fire suppression details Supporting documents Notes 7.20 ® Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds 7.21 ® Required Make -up air calculations 7.22 ❑ P ❑ NA Equipment manufacturers' catalog "cut sheets" or specifications 7.23 ❑ P ❑ NA Hood/grease extractor listing documentation 7.24 ❑ P ❑ NA Hood/grease duct sizing calculations 7.25 ❑ P ❑ NA Fire suppression information 440 - 2734 (8/01/WEB /COM) Tri-County Commercial Application Checklist 6 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties I: \Bui Iding\Forms \COM -Check I ist.doc SECTION 8.0 — PLUMBING DATA Construction documents Location (sheet number or spec section) 8.1 ® Required Floor plan(s) 14C5IVA NEW 8.2 ® Required Piping and material schedule 8.3 ® Required Equipment layout plan 8.4 ® Required Fixture schedule 8.5 ❑ P NA Site utility plan • 8.6 ❑ P NA Building cross section 8.7 ❑ P NA Rise diagram 8.8 ❑ P NA Roof plan 8.9 ❑ P NA Back flow prevention location 8.10 ❑ P )4 NA Irrigation plan 8.11 ❑ P N. NA Fire -rated construction details 8.12 ❑ P NA Under -slab plumbing plan Supporting documents Notes 8.20 ®. Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds 8.21 ❑ P ❑ NA Equipment manufacturers' catalog "cut sheets" or specifications 8.22 ❑ P ❑ NA Utility maintenance agreements 8.23 ❑ P ❑ NA Water supply calculations 8.24 ❑ P ❑ NA Sanitary system calculations 8.25 ❑ P ❑ NA Irrigation demand calculations 8.26 ❑ P ❑ NA Roof drain and storm water calculations 440 -2734 (8/OI/WEB /COM) Tri-County Commercial Application Checklist 7 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties is \Bu i Iding\Forms \COM -Check l ist. doc • SECTION 9.0 — ELECTRICAL DATA Construction documents Location (sheet number or spec section) 9.1 Z Required No. of sets of plans: 2 9.2 ® Required Floor plan(s) E-1.0 • r- 9.3 Z Required Electrical load calculations I 9.4 ® Required One line diagram E• 1 • c 9.5 ® Required Feeder riser diagram 9.6 ® Required Available fault current information E•I. 9.7 ® Required Panel schedule(s) E• I . I 9.8 ❑ P rgl NA Site electrical plan 9.9 ❑ P NA Fire -rated construction details 9.10 [ P ❑ NA Lighting plan E. I. 0 9.11 P ❑ NA Emergency power system and emergency lighting plan g-I. 9.12 w P ❑ NA Under -slab electrical plan gL. Supporting documents Notes 9.20 ® Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds NONE 9.21 iy1 P ❑ NA Energy code compliance forms and calculations for lighting P CA 9.22 ❑ P ❑ NA Emergency power system specifications 9.23 ❑ P ❑ NA Feeder riser information 9.24 ❑ P ❑ NA Lighting equipment manufacturers' catalog "cut sheets" or specifications 71 440 -2734 (8 /01/WEB /COM) Tri- County Commercial Application Checklist 8 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties 1: \BuildingWorms \COM -Check li st. doc • SECTION 10.0 - FIRE SUPPRESSION DATA Location (sheet number or spec section) Construction documents $�{ L�]htDLD R.� 5 (ZEpV lQe� c� �TLac��` 10.1 ® Required Floor plan(s) 10.2 ® Required Sprinkler piping plan(s) 10.3 ❑ P ❑ NA Site plan 10.4 ❑ P ❑ NA Standpipe information 10.5 ❑ P ❑ NA Back flow prevention information 10.6 ❑ P ❑ NA Reflected ceiling plan(s) 10.7 ❑ P ❑ NA Transverse and longitudinal cross sections 10.8 ❑ P ❑ NA Fire -rated construction details 10.9 ❑ P ❑ NA Specialty fire suppression system plans and list of systems Supporting documents Notes 10.20 ® Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds 10.21 ® Required Equipment manufacturers' catalog "cut sheets" 10.22 ❑ P ❑ NA Hydraulic calculations 10.23 ❑ P ❑ NA Specialty fire suppression system information SECTION 11.0 - FIRE DETECTION AND ALARM DATA Construction documents ` bL a R, , - satio number or pec section) 11.1 ®Required Floor plan(s) 12-A� C7lZ� 11.2 ❑ P ❑ NA Site plan 11.3 ❑ P ❑ NA Reflected ceiling plan(s) 11.4 ❑ P ❑ NA Transverse and longitudinal cross sections 11.5 ❑ P ❑ NA Wiring schematic 11.6 ❑ P ❑ NA Elevator recall information 11.7 ❑ P ❑ NA Operational matrix 11.8 ❑ P ❑ NA Fire -rated construction details 11.9 ❑ P ❑ NA Standard electrical notes Supporting documents Notes 11.20 ® Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds 11.21 ® Required Equipment manufacturers' catalog "cut sheets" 11.22 ® Required Installer certification information 11.23 ❑ P ❑ NA Battery calculations 11.24 ❑ P ❑ NA Sample fire alarm log book 11.25 ❑ P ❑ NA Emergency power system specifications 11.26 ❑ P ❑ NA Monitoring station information 11.27 ❑ P ❑ NA Voltage drop calculations 440 - 2734 (8 /01/WEB /COM) Tri- County Commercial Application Checklist 9 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties i: \Bu ilding\Forms \COM- Checklist. doc SECTION 12.0 — RE -ROOF INSTALLATION DATA Construction documents NC 3 Tik N Location (sheet number or spec section) 12.1 ® Required Site plan or building location map 12.2 ® Required Occupancy classification 12.3 ® Required Type of construction 12.4 ® Required Minimum roof class required 12.5 Required Class of roofing to be installed 12.6 ® Required Roof plan 12.7 ❑ P ❑ NA Parapet and scupper cross section(s) Supporting documents Notes 12.20 ® Required Pre -re -roof inspection report 12.21 ® Required Roofing system listing information 12.22 ® Required Roofing manufacturer's catalog "cut sheets" 12.23 ❑ P ❑ NA Structural calculations 12.25 ❑ P ❑ NA Structural engineer's report SECTION 13.0 — JURISDICTIONAL – SPECIFIC REQUIREMENTS Construction documents Item Location (sheet number or spec section) 13.1 ❑ P ❑ NA ❑ Required 13.2 ❑ P ❑ NA ❑ Required 13.3 ❑ P ❑ NA ❑ Required 13.4 ❑ P ❑ NA ❑ Required 13.5 ❑ P ❑ NA ❑ Required 13.6 ❑ P ❑ NA ❑ Required 13.7 ❑ P ❑ NA ❑ Required 13.8 ❑ P ❑ NA ❑ Required 13.9 ❑ P ❑ NA ❑ Required 13.10 ❑ P ❑ NA ❑ Required 440 - 2734 (8 /01/WEB /COM) Tri -County Commercial Application Checklist 10 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties I:\Bui lding \Forms \COM- Checklist.doc