Permit CITY TIGARD MECHANICAL PERMIT
A-44I DEVELOPMENT SERVICES PERMIT #: MEC2002 -00352
� 13125 SW Hall Blvd., Tigard, O 97223 (503) 639 -4171 DATE ISSUED: 8/15/02
PARCEL: 2S111 CA -14200
SITE ADDRESS: 15025 SW 98TH AVE
SUBDIVISION: ALDERBROOK FARM ZONING: R -3.5
BLOCK: LOT: 008 JURISDICTION: TIG
CLASS OF WORK: ALT FLOOR FURN: EVAP COOLERS:
TYPE OF USE: SF UNIT HEATERS: VENT FANS:
OCCUPANCY GRP: R3 VENTS W/O APPL: VENT SYSTEMS:
STORIES: BOILERS /COMPRESSORS HOODS:
FUEL TYPES 0 - 3 HP: DOMES. INCIN:
LPG 3 - 15 HP: COMML. INCIN:
MAX INPUT: BTU 15 - 30 HP: REPAIR UNITS:
FIRE DAMPERS ?: 30 - 50 HP: WOODSTOVES:
GAS PRESSURE: 50 + HP: CLO DRYERS:
FURN < 100K BTU: AIR HANDLING UNITS OTHER UNITS:
FURN > =100K BTU: <= 10000 cfm: GAS OUTLETS: 1
> 10000 cfm:
Remarks: Install approx. 20 If gas line and 1 gas outlet.
Owner: FEES
ONNIS, DORIS A/ROBERTO Type By Date Amount Receipt
15025 SW 98TH AVE PRMT CTR 8/15/02 $72.50 2720020000
TIGARD, OR 97223 5PCT CTR 8/15/02 $5.80 2720020000
Total $78.30
Phone:
Contractor:
LAY'S CONSTRUCTION
7400 SE MILWAUKIE BLVD.
PORTLAND, OR 97202 REQUIRED INSPECTIONS
Gas Line Insp
Phone: 503 - 233 -4989 Mechanical Insp
Reg #: Final Inspection
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of Ore.
Specialty Codes and all other applicable laws. All work will be done in accordance with approved
plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended
for more than 180 days. ATTENTION: Oregon law requires you to follow rules adopted in the Oregon
Utility Notification Center. Those rules are set forth in OAR 952 - 001 -0010 through OAR
952 - 001 -0080. You may obtain copies of these rules or direct questio s to OU by calling
(Rf \94R -Q 1 • !."`
Issue By: lir "� Permittee Signature: /4,0
Call (503) 639 -4175 by 7:00 P.M. for inspections nek / ed the next business day
Mechanical Permit Application FOR OFFICE USE ONLY
Received , / Mechanical
Date/B : 8, 10 0 Permit No. U _ _..d,. - /I 5
City of Tigard T Planning Approval
est Form Date /S Building
Permit
13125 SW Hall Blvd. Plan Review Other
Tigard, Oregon 97223 Date /B : Permit No.:
Phone: 503- 639 -4171 Fax: 503 -598 -1960 Post- Review Land Use
�Mru+ AA Date /B : Case No.:
Internet: www.ci.tigard.or.us �JJ n i Contact Juris.: ® See Page 2 for
24 -hour Inspection Request: 503- 639 -4175 Name/Method: Su lemental Information.
TYPE OF WORK COMMERCIAL FEE* SCHEDULE - USE CHECKLIST
❑ New construction ❑ Demolition Mechanical permit fees* are based on the total value of the work
❑ Addition/alteration/replacement ❑ Other: performed. Indicate the value (rounded to the nearest dollar) of all
CATEGORY OF CONSTRUCTION mechanical materials, equipment, labor, overhead and profit.
1 & 2- Family dwelling ❑ Commercial/Industrial Value: $ See Page 2 for Fee Schedule
❑ Accessory Building ❑ Multi- Family RESIDENTIAL EQUIPMENT /SYSTEMS FEE* SCHEDULE
Description I Qty I Fee(ea.) I Total
❑ Master Builder ❑ Other: Heating/Cooling
JOB SITE INFORMATION and LOC� IO I Furnace - add -on air conditioning 14.00
Job site address: ,e6:3 5�9 , Z' ' Gas heat pump 14.00
Suite #: Bldg. /Apt. #: Duct work 14.00
Project Name: /. Hydronic hot water system 14.00
1 Residential boiler
Cross street/Directions to job site: (for radiator or hydronic system) 14.00
Unit heaters (fuel, not electric)
_6 jd (in wall, in -duct, suspended, etc.) 14.00
Flue /vent (for any of above) 10.00
�i Repair units 12.15
Subdivision: r A Lot #: Other Fuel Appliances
Tax map /parcel #: Water heater 10.00
:
DESCRIPTION OF WORK .. , ,. , _ '•, '' Gas fireplace _ 10.00
F • „ _2_,,:- N lki, a A AAA Flue vent (water heater /gas fireplace) 10.00
I Log lighter (gas) 10.00
Wood/Pellet stove 10.00
Wood fireplace /insert 10.00
Chimney /liner /flue /vent 10.00
❑ PROPE TY OWNER ❑ TENANT Other: 10.00
Name: ,� Environmental Exhaust Ventilation
� �� << Range hoo kitchen equipment 10.00
Address: 45—(3126—SE” ����r� Clothes dryer exhaust 10.00
City /State /Zip: O `L- Single duct exhaust
Phone: 9- Fax: (bathrooms, toilet compartments,
❑ APPLICAliT ❑ CONTACT PERSON utility rooms) 6.80
Name: Attic /crawl space fans 10.00
Other: 10.00
Address: Fuel Piping
City /State /Zip: ($5.40 for first 4, $1.00 each additional) **
Furnace, etc. **
Phone: Fax: Gas heat pump **
E -mail: Wall /suspended/unit heater **
CONTRACTOR ** heater
Business Name: 4 5 C,,�� . iZ_Gfrcv, Fireplace **
/ f � O ,/ Range
Address: ` BBQ **
City /State /Zip: z� G� r �� Clothes dryer (gas) **
Phone:23 , F ax: ? —7t79 Other: **
CCB Lic. #: ' % /c f 7' -0 ( Total:
f Total:
Mechanical Permit Fees*
Subtotal: $
Authorized / Permit Fee $72.50 $
Signature: 1 _ Date: Plan Review Fee (25% of Permit Fee) $
State Surcharge (8% of Permit Fee) $
TOTAL PERMIT FEE $
(Please print name) Notice: This permit application expires if a permit is not obtained within
180 days after it has been accepted as complete.
*Fee methodology set by Tri- County Building Industry Service Board.
Mechanical Permit Application - City of Tigard
Page 2 - Supplemental Information
Commercial Fee Schedule:
Total Valuation: Permit Fee:
$1.00 to $5,000.00 Minimum fee $72.50
$5,001.00 to $10,000.00 $72.50 for the first $5,000.00 and $1.52
for each additional $100.00 or fraction
thereof, to and including $10,000.00.
$10,001.00 to $25,000.00 $148.50 for the first $10,000.00 and
$1.54 for each additional $100.00 or
fraction thereof, to and including
$25,000.00.
$25,001.00 to $50,000.00 $379.50 for the first $25,000.00 and
$1.45 for each additional $100.00 or
fraction thereof, to and including
$50,000.00.
$50,001.00 and up $742.00 for the first $50,000.00 and
$1.20 for each additional $100.00 or
fraction thereof.
Assumed Valuations Per Appliance:
Value Total
Description: Qty (Ea) Amount
Furnace to 100,000 BTU, including 955
ducts & vents
Furnace> 100,000 BTU including ducts 1,170
& vents
Floor furnace including vent 955
Suspended heater, wall heater or floor 955
mounted heater
Vent not included in appliance permit 445
Repair units 805
< 3 hp; absorb. unit, 955
to 100k BTU
3 -15 hp; absorb. unit, 1,700
101k to 500k BTU
15 -30 hp; absorb. unit, 501k to 1 mil. 2,310
BTU
30 -50 hp; absorb. unit, 3,400
1 -1.75 mil. BTU
>50 hp; absorb. unit, 5,725
>1.75 mil. BTU
Air handling unit to 10,000 cfm 656
Air handling unit >10,000 cfm 1,170
Non - portable evaporate cooler 656
Vent fan connected to a single duct 446
Vent system not included in appliance 656
permit
Hood served by mechanical exhaust 656
Domestic incinerator 1,170
Commercial or industrial incinerator 4,590
Other unit, including wood stoves, 656
inserts, etc.
Gas piping 1-4 outlets 360
Each additional outlet 63
TOTAL COMMERCIAL $
VALUATION:
CITY OF TIGARD 24 -Hour
BUILDING • Inspection Line: (503) 639 -4175
INSPECTION DIVISION Business Line: (503) 639 -4171 MST
,, • BUP 2 ,5 7
S
Received Date Requested 12-3 4 AM PM BUP
•
Location f S 0 ?S F 6v-v- Suite MEC r2 — ob. -�
Contact Person Ph ( ) ° S 0 5 PLM
Contractor Ph ( ) SWR
BUILDING Tenant/Owner ELC
Footing
Foundation ELC
Access:
Ftg Drain ELR
Crawl Drain
Slab Inspection Notes: SIT
Post & Beam
Shear Anchors
Ext Sheath/Shear
Int Sheath/Shear
r
u ation
Drywall Nailing
Firewall
Fire Sprinkler
Fire Alarm
Susp'd Ceiling
Roof
Other:
Fina
CO) ART FAIL
P ' ' BING
Post & Beam
/.,
Under Slab
Rough -In f,.
Water Service
Sanitary Sewer
Rain Drains
Catch Basin / Manhole
/ 777'
Storm Drain
Shower Pan
Other:
Final
P o FAIL
ECHANIC
P . =eam
S` - Dampers
t
SS PART FAIL
ELECTRICAL
Service
Rough -In
UG /Slab
Low Voltage
Fire Alarm
Final Reinspection fee of $ required before next inspection. Pay at City Hall, 13125 SW Hall Blvd.
PASS PART FAIL
SITE Please call for reinspection RE: El Unable to inspect — no access
Fire Supply Line
ADA
Approach/Sidewalk Date G /' 3G ? Inspector / Ext
Other:
Final DO NOT REMOVE this inspection record from the Job site.
PASS PART FAIL
CITY OF TIGARD 24 -Hour
BUILDING Inspection Line: (503) 639 -4175
INSPECTION DIVISION Business Line: (503) 639 -4171 -i MST
BUP
Received Date Requested - < 1 AM PM BUP — e 3 3
Location /5 a a 5 / a Suite MEC 0 r 60 3 S0 7 —
Contact Person Ph ( ) PLM
Contractor Ph ( )
233 SWR
Tena t/: (2 y . c� 2� Z —Op 3c59 Footing 13 �! — 5315 — ()
Foundation Access:
Ftg Drain ELR
Crawl Drain
Slab Inspection Notes: SIT
Post & Beam
Shear Anchors
Ext Sheath/Shear
Int Sheath/Shear
Framing
Insulation
Drywall Nailing
Firewall
Fire Sprinkler
Fire Alarm
Susp'd Ceiling
Roof -■11011111111.16Y. /
Other:
oral
PART FAIL
P U MBING
Post & Beam
Under Slab
Rough -In
Water Service
Sanitary Sewer
Rain Drains
Catch Basin / Manhole
Storm Drain
Shower Pan
Other:
Final
PAS$ PAETT FAIL
CISECHANICALD
Post & Beam
Rough -In
Gas Line
Si oke Dampers
FAIL
Service
Rough -In
UG/Slab
Low Voltage
Fir= larm
: 41e - 1 PART FAIL El Reinspection fee of $ required before next inspection. Pay at City Hall, 13125 SW Hall Blvd.
SI ❑ Please call for reinspection RE: 0 Unable to inspect — no access
F
Fire Supply Line ///
Approach/Sidewalk Date Inspector Ext
Other:
Final DO NOT REMOVE this inspection record from the Job site.
PASS PART FAIL