Correspondence /04Ls StA/ 75TH
MEMORANDUM C 1,J-a 9'---0/
CITY OF TIGARD, OREGON
TO: Finance Department
FROM: Jim Duckett, Development Services
DATE: September 22, 1995
SUBJECT: Receipt 95- 270884
Landmark Development Corp
9990 SW Greenburg Rd Ste 101
Tigard OR 97223
Due to an oversight on our part, we charged Landmark Development
Corp for several fees which should not have been assessed. Please
issue a refund as soon as possible for the following:
SWUSA (Sewer Connection) $2200.00
SWINSP (Sewer Inspection) 35.00
TIF -R (Residential TIF) 1470.00
TIF -MT (Mass Transit TIF) 120.00
PKSDC (Parks Dev Charge) 500.00
WQUAL (Water Quality) 180.00
WQUANT (Water Quantity) 100.00
TOTAL FEES TO BE REFUNDED: $4605.00
Thanking you in advance,
(.,Lt)u,
cc: Landmark Development Corp ATTN: Merce Willar.
M: \... \MST95_03.57 \REFUND.DOC
DEMOLITION PERMITS
This is an over the counter permit. The applicant submits a plot plan showing all
buildings that will be removed. The applicant also needs to show erosion control
placement if the area being disturbed is greater than 500 sq. ft. If the property is
connected to sewer, they must cap the sewer line & have it inspected. If the property
is on septic, they must pump and fill the tank and have it inspected. In the remarks
section -- "All debris to be removed. Septic tank to be pumped, filled & inspected (or)
Sewer to be capped and inspected ".
Inspections: Final and *other (septic or sewer).
Per Lt. Bonnin's request, please fax a copy of the demolition permit to the Tualatin
Valley Fire & Rescue ATTN: Lt. Bonnin at 684 -5454. The TVF &R is looking for
buildings to use for training purposes. TVF &R will contact the applicant to discuss
further.
NOTE: IF THERE WILL BE A NEW BUILDING CONSTRUCTED AT THE SITE,
THEY ARE ENTITLED TO CREDITS FOR ONE OR MORE OF THE FOLLOWING: TIF,
SEWER, PARKS SDC, WATER QUALITY & WATER QUANTITY. CHECK WITH
ACCOUNTING TO SEE HOW MANY DWELLING UNITS (DUs) THAT PROPERTY IS
PAYING FOR SEWER & SURFACE WATER. HAVE THE APPLICANT PROVIDE YOU
WITH INFORMATION ABOUT THE BUILDING(S) TO BE DEMOLISHED (USE, SQUARE
FOOTAGE, ETC.). YOU WILL NEED THIS INFORMATION LATER WHEN PLANS ARE
SUBMITTED FOR THE NEW CONSTRUCTION.
SPECIAL SETBACK INFO: Structural supports and foundations cannot extend past
required setbacks, but the eaves may project into the required yard UP TO 3' IF they
do not reduce the yard space to less than 3'. EXAMPLE: If backyard setback is 15',
the support beam or foundation cannot be any closer to property line than 15', but
the eave can project 3' into the backyard space (which would then be reduced to
12'). If the sideyard setback is 5', the support beam cannot be any closer than 5' and
the eave can only extend 2' into the sideyard because the yard cannot be reduced to
less than 3' total. Chimneys and other additions such as bay windows may extend
past the setback as long as there is at least 3' left. Refer to a planner if in doubt.