Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Permit
. '~1=~ � IN IPPFP-' _ � ^ ^� ITY QFTIGARD PERMIT PERMIT #.......: MST95-0357 ^", COMMUNITY DEVELOPMENT DEPARTMENT DATE ISSUED: 09/22/95 1u1oomw Hall nwu. Tigard, Oregon 97223°81e9 (503) 639,4171 `` '' PARCEL: 2S102BA-00200 SITE ADDRESS...: 12045 SW 95TH AVE .../4,5.5.2-=— SUBDIVISION....: NO.TIGARDVILLE ADDITION AMEND. ZONING: R-25 ' BLOCK..........: LOT ^61 ------ — ----- BUILDING REISSUE: DWELLING UNITS:1 BASEMENT.... .... :0 sf CLASS OF WORK.:NEW BEDRMS:3 BATHS:3 GARAGE :497 sf TYPE OF USE...:SF FLOOR AREAS REQUIRED SETBACKS TYPE OF CONST. :5N FIRST ^814 sf LEFT.. :5 ft RIGHT. :5 ft OCCUPANCY GRP. :R3 SECOND... :863 sf FRONT. :20 ft REAR.. :19 ft STORIES.. ..... :2 FINBSMENT:0 sf REQUIRED HEIGHT. . . . . . . . :25 ft TOTAL :1677 sf SMOKE DETECTORS. :Y FLOOR LOAD ^40 psf VALUE $^ 116521 PARKING SPACES..:1 : Remarks: PATH I PLUMBING — SINKS -1 FLOOR DRAINS ^0 BACKFLOW PREVNTRS..:1 LAVATORIES ^4 WATER HEATERS -1 TRAPS ^0 TUB/SHOWERS.... :2 LAUNDRY TRA;S...:0 CATCH BASINS ^0 WATER CLOSETS..:3 SEWER LINE (ft).:0 GREASE TRAPS ^0 DISHWASHERS ^1 WATER LINE (ft) -100 OTHER FIXTURES ^0 GARBAGE DISP...:1 RAIN DRAIN (ft).:0 WASHING MACH... :1 SF RAIN DRAINS.. :1 MECHANICAL --- . FEES FUEL TYPES UNIT HTRS.. :0 type amount by date recpt /GAS/ / / VENTS :0 TIF $ 1590.00 JSD 09/22/95 95-270884 MAX INPUT:0 BTU VENT FANS :4 SWM $ 180.00 JSD 09/22/95 95-270884 FURN < 100K ..:1 HOODS ^1 SWM $ 100.00 JSD 09/22/95 95-270884 FURN >=100K ..:0 WOODSTOVES.:0 BPRT $ 475.50 JSD 09/22/95 95-270884 FLOOR FURN ^0 CLO DRYERS.: 1 BPLC $ 309.08 JD 08/03/95 95268905 BOIL/CMP < 3HP:0 OTHER UNITS:1 B5PC $ 23.78 JSD 09/22/95 95-270884 GAS OUTLETS:1 PARK $ 500.00 JSD 09/22/95 95-270884 Owner: MPRT $ 43.50 JSD 09/22/95 95-270884 LANDMARK DEVELOPMENT CORP. MPLC $ 10.88 JSD 09/22/95 95-270884 9990 SW GREENBURG RD M5PC $ 2.18 JSD 09/22/95 95-270884 SUITE 101 ' 3BTH $ 225.00 JSD 09/22/95 95-270884 PORTLAND OR 97223 P5PC $ 11.25 JSD 09/22/95 95-270884 Phone #: 620-4427 EROS $ 64.00 JSD 09/22/95 95-270884 Contractor: -----ERPC $ 20.80 JSD 09/22/95 95-270884 PACRIM ENGINEERING & DESIGN ERPC $ 20.80 JSD 09/22/95 95-270884 9990 SW GREENBURG RD. SUITE 101 PORTLAND OR 97223 Phone #: 620-4427 Reg #..: 081868 — — $ 3576.77 TOTAL This permit is issued subject to the regulations contained in the REQUIRED INSPECTIONS Tigard Municipal Code, State of Ore. Specialty Codes and all other Footing Insp Plumb Top Out applicable laws. All work will be done in accordance with approved Foundation Insp Framing Insp plans. This permit will expire if work not started-withi 180 Post/Beam Struct Fireplace Insp days of issuance, or if work is suspe sor th' 180 Post/Beam Mechan Gas Line Insp ° � Crawl Drain Insulation Insp Permittee S'= /a Lire: If ' r y e• Plm/undslab Insp Gyp Board Insp PLM/Underfloor Rain drain Insp Issued By. dom. �- ��/~ Mechanical Insp Water Line Insp Call for inspection — 639-4175 CITY OF T CONNECTION PERMIT MI "f # ° SWR95 -0408 ° COMMUNITY DEVELOPMENT DEPARTMENT DATE ISSUED: 09/22/95 13125 SW Hall Blvd. Tigard, Oregon 97223.8199 (503) 639 -4171 E Cr,S 4, PARCEL: 2S102BA- 00200 SITE ADDRESS° ..: 12045 SW 95TH AVE 1�� SUBDIVISION ° NO. TIGARDVILLE ADDITION AMEND. ZONING: R -25 BLOCK • LOT. . ° ° ° °'.... ° °° :61 TENANT NAME USA NO • FIXTURE UNITS...: CLASS OF WORK... :NEW DWELLING UNITS.. :1 TYPE OF USE °SF NO. OF BUILDINGS:1 INSTALL TYPE °...:BUSWR IMPERV SURFACE..: :sf Remarks: PATH I Owner: FEES LANDMARK DEVELOPMENT CORP. type amount by date recpt 9990 SW GREENBURG RD PRMT $ 2200.00 JSD 09/22 95- 270884 SUITE 101 INSP $ 35.00 JSD 09/22/95 95- 270884 PORTLAND OR 97223 Phone #: 620 -4427 Contract or CONTRACTOR NOT ON FILE • Phone #: $ 2235.00 TOTAL Reg #.. REQUIRED INSPECTIONS ----- This Applicant agrees to comply with all the rules and regulations Sewer Inspection of the Unified Sewage Agency. The permit expires 180 days from the date issued. The total amount paid will be forfeited if the permit expires. The Agency does not guarantee the accuracy of the side sewer laterals. If the sewer is not located at the measurement given, the installer shall prospect 3 feet in all directions from the distance given. If not so located, the installer shall purchase a °Tap and Side Sewer° Permit and the A cy will ins all a ateral. Permittee Signa re: Issued By. awl c` Call for inspection - 639 -4175 15 - 2-,e60,? s9 (xa) . Jr Sr 1 A • - - Residential Building Permit Application City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 r (503) 639 -4171 i- Jobsite Address: 12045 SW 95t11 Avenue Office Use Onlv Subdivision: Wahl n Park Lot # 1 Valuation: �1 ,.. w Contact Date / / Initials Result New Construction Only: (Square Footage) Planck/Rec # -'; Permit # 177 S tq •C 'i 7 House: 1,671 sq . f t Garage: sq. ft . Reissue of Map & TL # - R5. t peirA -00acm Corner Lot? 10110 N Flag Lot? Y CIO Zone ( =c"'q -` Plat # Owner: Landmark Development Corp. Address: 99 90 SW Greenburg Rd . , Ste 101 Approvals Required Portland OR 97223 Planning Setbacks, L " Solar Engineering Phone: ( 503 ) 620.4427 Other Items Required I Contractor: PacRim Engineering & Design L." Trruss Address: 9990 SW Greenburg Rd. Ste 101 Tuss Details etails Portland OR 97223 Other Notes Phone: (503 ) 620.4427 '6 ,ai . # * `'' , Contractor's License # 081868 ,� (attach copy of current Oregon license) : -(' > v r Contact Name: Merc -e r. Willard Contact Phone: ( 503 ) 620.4427 Subcontractors: xs ( Architect/Engineer: Mark Schmidt , r )p gner Plumbing: to be determined !! Address: P .0 . Box 302 Mechanical: to be determined `c. Kew ErTVerrf-s Wilsonville OR 97070 (attach copy of current OR Contractor's License) Phone: ( 503 ) 678. 1681 JOB D Aii CRIPTION: Construction of 2 story, single family dwelling r I it / /' ri.: (503 ) 620.4427 Applicant Signature iiil!f/Pr Applicant Phone number ( 7 0 --- 39 Received by: . Date Received: n:uogin\astsvesapp N Permit # Account Description Amount Amt. Pd. Bal. Die 451 Bldg. Permit (BUILD) 1171.-5 v C-/ `7 : ,s „, i Plumb. Permit (PLUMB) P 5 a-LS , / ” \ Mech. Permit (MECH) c43 • R2 c/ 3, 5 State Tax (TAX) ) L4 3 V Pi 14 I7 4 �/ Bldg: o 7? / -- Plumb: //. 2 S Mech: 0 / D / Plan Check (PLANCK) 3/f< 9 --OC Air Bldg: ,-?0P, c' Y Plumb: Mech: m e i ✓ 5wd2G.i -O (/U d Sewer Connection (SWUSA) ✓ .� /. 7 2vl) '' Sewer Inspection (SWINSP) ✓ 5 3 3 / Parks Dev Charge (PKSDC) V 5 & 0 5e) f/ Residential TIF (TIF -R) V /' 1 v /c/71) Mass Transit TIF (TIF -MT) ✓ / J. •'' Commercial TIF (TIF -C) Industrial TIF (TIF -1) Institutional TIF (TIF -1S) Office TIF (TIF -0) (� V Water Quality (WQUAL) / Water Quantity (WQUANT) / `o V " Fire Life Safety (FLS) Erosion Cntrl Permit (ERPRMT) 6 `-f bye. c Erosion Planck/USA (ERPLAN) ,6••. P ' ?, J1) v Erosion Planck/COT (EROSN) ?v� 6 0,-pr V TOTALS: S8" //. "7`7 773 . SS4 /. 77 / fra2 6/16/00 Activities for Case #: MST95 -00357 2:09:26 PM Assigned Hold Updated Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes MSTA005 Application received • 8/3/95 JD PASS BLT 9/21/95 MSTA008 Permit Created 9/21/95 RT PASS BLT 9/21/95 MSTA010 Check for prcl. restrict. 8/10/95 JD PASS BLT 9/21/95 MSTA012 Plans routed to Plans Examiner 8/10/95 JD PASS BLT 9/21/95 MSTA026 Plans approved by Plans Exmr 9/21/95 RT PASS BLT 9/21/95 APPROVED AFTER MIKE A OK TO RELEASE 092195 MSTA030 Reviewed plans routed to DSTS 9/21/95 RT PASS BLT 9/21/95 MSTA705 Footing Insp 10/23/95 KS A/N KBS 10/23/95 #-1- monolithic FTG /FDN MSTA706 Foundation Insp 10/23/95 KS A/N KBS 10/23/95 #-1- monolithic / ftg/ fdn #-2- initial erosion control approved #-3- place reinforcing four • inches below top hold downs #-4- install anchor bolts ( size and spacing as shown #-5- maintain three inches clearance under reinforcing steel #-6- corners of structure was surveyed for re: set backs from property lines MSTA710 Post/Beam Structural 11/1/95 KS APP KBS 11/2/95 • MSTA711 Post/Beam Mechanical 10/30/95 MS PASS MRS 10/30/95 MSTA713 Crawl Drain 10/30/95 MS PASS MRS 10/30/95 MSTA717 PLM /Underfloor 10/30/95 MS PASS MRS 10/30/95 MSTA720 Mechanical Insp 1/16/96 KS DIS KBS 1/16/96 # -1- adjust B vent to maintain clearance to combustibles #-2- support gas piping at furnace/ plenum #-3- need exhaust fan • at utility rm also at upper tub bath vent to ext above roof sheathing/ secure #-4- heat • duct incontact with B vent at attic t -5- provide protective collar at B vent at attic and secure #-6- provide installation manual for ventless gas fireplace #-7- kitchen hood not vented at this time ? if applicable MSTA722 Plumb Top Out 12/20/95 MS FAIL MRS 12/22/95 no test MSTA725 Framing Insp 1/5/96 KS DIS KBS 1/5/96 #-1- electrical not installed plumbing top out not app MSTA735 Gas Line Insp 1/25/96 KS DIS KBS 1/26/96 #-1- shut off valve at fireplace needs to be accessible # -2- support gas piping under fl • Page 1 of 3 6/16/00 Activities for Case #: MST95 -00357 2:09:26 PM Assigned Hold Updated Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes MSTA740 Insulation lnsp 11/3/95 KS DIS KBS 11/3/95 #-1- under fl insulation, support furnace plenum at crawl space as indicated at post beam inspection #-2- supply ducts disconnected at crawl space extend insulation at flex ducts to plenum and secure MSTA745 Gyp Board Insp 2/15/96 KS PART KBS 2/16/96 #-1- ok to mud /tape interior gypsum only #-2- gypsum needs to tight fitting around supply ducts #-3- provide complete separation between garage / dwelling MSTA755 Rain drain Insp 10/30/95 MWS PASS MRS 10/30/95 MSTA760 Water Line lnsp 12/29/95 GS DIS GES 12/29/95 GATE LOCKED MSTA795 Mechanical Final 7/19/96 KS FAIL BT2 7/23/96 NO ONE HOME MSTA797 Plumb Final 7/19/96 MS NR MRS 7/23/96 no address MSTA799 Building Final 8/14/96 GS DIS GES 8/14/96 erosion control MSTA080 (F) Ready to issue 9/21/95 JSD PASS JD 9/21/95 MSTA092 (F) Issue combination permit 9/22/95 JSD PASS JD 9/22/95 Pending issuance of plumbing permit due to CCB's computers being down and unable to confirm expiration date of CCB license. jsd MSTA097 Issue plumbing signature form 9/25/95 JSD PASS JD 9/25/95 MSTA712 Underfloor insulation 11/6/95 11/6/95 RB PASS RB 11/6/95 MSTA722 Plumb Top Out 12/26/95 12/22/95 MS FAIL MRS 12/26/95 no test waste MSTA722 Plumb Top Out 12/29/95 12/29/95 GS DIS GES 12/29/95 GATE LOCKED MSTA770 Misc. Inspection 1/11/96 1/11/96 KS DIS BT2 7/24/96 #-1- shear wall: provide triple studs at f.t.a 5 straps as indicated !!!install osb board both sides of shear panel at this location #-2- additional nailing at all ext panels ( per schedule) MSTA771 «REINSPECTION» 1/12/96 1/12/96 KS DIS BT2 7/24/96 #-1- corrections not completed MSTA725 Framing Insp 1/18/96 1/18/96 KS DIS BT2 7/24/96 #-1- electrical cover or plumbing top out not approved Page 2 of 3 6/16/00 Activities for Case #: MST95 -00357 2:09:26 PM Assigned Hold Updated Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes MSTA726 Framing <REINSP> 1/22/96 1/22/96 KS DIS BT2 7/24/96 #-1- install eave baffles #-2- need attic access/ with curb #-3- add eave vent at rear bay ventilation not adequate #-4- strap header rear bay to trimmers #-5 -block floor joist at bearing walls #-6- extend exhaust ducts to roof jack / secure above roof sheathing #-7- couldn't open crawl access door to verify load bearing points MSTA720 Mechanical Insp 1/22/96 KS APP KBS 2/16/96 MSTA726 Framing <REINSP> 1/24/96 1/24/96 KS NN BT2 7/24/96 #-1- insulators will install eave bafflles / water resistant MSTA770 Misc. Inspection 1/24/96 1/24/96 1/24/96 KS APP BT2 7/24/96 #-1- SHEAR WALL MSTA735 Gas Line Insp 1/26/96 1/26/96 KS DIS BT2 7/24/96 #-1- prior corrections not made at this time MSTA795 Mechanical Final 1/26/96 1/26/96 KS APP BT2 7/24/96 MSTA735 Gas Line Insp 1/30/96 1/30/96 KS APP BT2 7/24/96 #-1- 16 PSI for 20 minutes MSTA740 Insulation Insp 1/30/96 1/30/96 1/30/96 KS APP BT2 7/24/96 MSTA765 Appr /Sdwlk lnsp 2/23/96 1/29/96 PI PEND C *H 2/23/96 1. Request: do not pour if _ below 34 degrees. 2. Be prepared to protect finish. MSTA765 Appr /Sdwlk lnsp 2/23/96 1/23/96 PI FAIL C *H 2/23/96 1. Approach not formed correctly. 2. See attached • standard. MSTA745 Gyp Board Insp 2/23/96 2/23/96 KS APP BT2 7/24/96 MSTA•90 Electrical Final 8/14/96 8/14/96 .MJR PASS MJR 8/14/96 MSTA797 Plumb Final 8/15/96 086 MS MRS '8/15/96 MSTA799 Building Final 8/20/96 GS APP GES 8/20/96 MSTA970 Case Finaled 8/20/96 GS APP GES 8(20/96 MSTA960 (F) Issue Cert. of Occupancy 8/20/96 JF 9/20/96 Page 3 of 3 I ',K Solar Balance Point Standard Box A. North -South dimension for the lot Box B. Shade point height from your structure: measured perpendicular to the midpoint of the Change in elevation from front property line to north lot line the finished floor elevation added to the height of the building from finished floor elevation to ejr(3 the affected peak /eave. If the roof line runs feet N /S, subtract 3 feet from the figure. Subtract one foot for each foot of difference in elevation from the front property line to the rear property line. � . / C � /-) feet Box C. Distance to the shade reduction line Distance from North property line to foundation added to the distance from the foundation to the 1 fe, ted roof peak /eave. Feet The following helps explain the graph below: The horizontal axis (rows) represents box "C" figures. The vertical axis (columns) represents box "A" figures. It is most useful to draw a vertical line to represent the appropriate figure found in box "A" and a horizontal line to represent the appropriate figure found in box "C ". The intersection of the vertical and horizontal lines determines the value found in box "D ". The value in box "D" should be compared to the value in box "B "; if the value in box "B" is less than or equal to the value found in box "D ", the building is in compliance with the solar balanc , ode. Distance to shade 100+ 95 90 85 80 75 70 65 60 55 50 45 40 reduction line from northern lot line in feet 70 40 40 40 41 42 43 44 65 38 38 38 39 40 41 42 43 60 36 36 36 37 38 39 40 41 42 55 34 34 34 35 36 37 38 39 40 41 50 32 32 32 33 34 35 36 37 38 39 40 41 42 45 30 30 30 31 32 33 34 35 36 37 38 39 40 40 28 28 28 29 30 31 32 33 34 35 36 37 38 35 26 26 26 27 28 29 30 31 32 33 34 35 36 30 24 24 24 25 26 27 28 29 30 31 32 33 34 25 22 22 22 23 24 25 26 27 28 29 30 31 32 20 20 20 20 21 22 _23 24 25 26, 27 28 29 30 15 18 18 18 19 20 21 22 23 24 25 26 27 28 10 16 16 16 17 18 19 20 21 22 23 24 25 26 5 14 14 14 15 16 17 18 19 20 21 22 23 24 Box "D" Maximum allowed shade point height feet C . K Iq J -- S-2. fi ay, 4 --- .j6' c ce 7 Solar Balance Worksheet' � f • Address I l/ d L ` U 9 Box A calculations: North -South dimension for the lot. Box A: This dimension is determined by finding the midpoint of the North lot line and drawing an intersecting line perpendicular to that point. Measure the distance from the midpoint of the North lot line to the South lot line along the described line. ft Box B calculations: Shade point height from your structure. Box B: 1. Determine whether measurements will be based on the peak or eave of your structure. The orientation of the ridge is also important. Which describes your lot? 1 a: If the roof line runs North - South, measurements will be based on the peak of the (Circle one) roof. � la lb l�/ 1 b: If the roof line runs East -West and the roof pitch is less than 5/12, measurements will be based on the eave. 1 c: If the roof line runs East -West and the roof pitch is 5/12 or steeper, measurements will be based on the peak. ,r/ ft 2. Measure change in elevation from front property line to finished floor elevation. Of + O/ ft 3. Measure distance from finished floor elevation to the affected peak /eave. - ft 4. If the roof line runs North - South, deduct three feet. If the roof line runs East -West, deduct nothing. 5. Subtract one foot for each foot of difference in elevation from the front property - ft line to the rear property line, if the lot slopes up from the front to the rear. If the lot has no slope or slopes up from the rear to the front, deduct nothing. 6. Total figure for box B: ft Box C. Distance to the shade reduction line. Box C: / 1. Measure the distance from the North property line to the foundation. `,�✓ ft 2. Measure the distance from the foundation to the affected peak or eave. + ` ft 3. Total figure for box C: _ ft H: \tog :n \): and \soiarck PERMIT NO. 1 G S — 03.57 EROSION CONTROL INSPECTION REPORT DATE 8// 5 % INSPECTOR g )C-I4 I- 4' O OWNER/P RMITEE P�-c R ►� E9Ar 5 0E SUBDIVISION n � hc. <<V PA2K LOT U nified Sewerage Agency of Washington County SITE ADDRESS 1 2 015 .5 w I S +h PrV 1- L A.PPROVED FINAL INSPECTION THIS SITE MEETS THE POST - CONSTRUCTION EROSION CONTROL STANDARDS SET FORTH IN U.S.A. RESOLUTION AND ORDER. NOTE: IF POST - CONSTRUCTION EROSION CONTROL MEASURES ARE STILL BEING EMPLOYED ON THIS SITE TO MEET CRITERIA FOR AN APPROVED FINAL INSPECTION, THE MEASURE(S) MUST REMAIN IN PLACE UNTIL LANDSCAPING IS COMPLETE OR PERMANENT GROUND COVER IS ESTABLISHED. A COPY OF THE FINAL EROSION CONTROL INSPECTION REPORT MUST BE FORWARDED TO THE NEW OWNER, AT WHICH TIME NEW OWNER ASSUMES THE RESPONSIBILITY FOR MAINTENANCE, REPAIR AND REMOVAL. OTHER THANK YOU FOR YOUR COOPERATION! DATE Si I S A TIME la PM INSPECTOR PHONE ei c [ 7.z, • CITY OF TIGARD BUILDING1NSPECTION NOTICE Inspection Line: 639 -4175 Business Phone: 639 -4171 Footing Rain Drain Cover /Service FINAL: Foundation Water Line Ceiling - Plumb. Post/Beam Mech. Shear /Sheath Framing -Mech. PIbg.Und /Flr /Slab Plbg. Top Out Insulation - Elect. Post/Beam Struct. Mech. Rough -in Gyp. Bd. - Idg. San. Sewer Gas Line Appr /Sdwlk Reins. Other: Date: A.I. P.M. Entry: Address: / `l j" 2s" Tenant: Ste: MST: 35 35` BUP: Con /Own: MEC: PLM: ELC: THE FOLLOWING CORRECTIONS ARE REQUIRED: ELR: Ins p j r: Date: 8 2 ,22- 7 ,- C !/ APPROVED DISAPPROVED /CALL FOR REINSP. CF CO CITY OF TIGARD BUILDING INSPECTION NOTICE Inspection Line: 639 -4175 Business Phone: 639 -4171 Footing Rain Drain Cover /Service FINAL: Foundation Water Line Ceiling114a Post/Beam Mech. Shear /Sheath Framing -Mech. PIbg.Und /Flr /Slab Plbg. Top Out Insulation Post/Beam Struct. Mech. Rough -in Gyp. Bd. San. Sewer Gas Line Appr /Sdwlk Reins. Other: Date: g// ( 1 (p A.M. P.M. Entry: J E w Address: / a - V 75 Tenant: Ste: MST: ? 5 CaS ` BUP: C)/Own: )—(..) — L ( Lt a-1 MEC: PLM: ELC: —0S v THE FOLLOWING CORRECTIONS ARE REQUIRED: ELR: — .i. I. �� ac da ('�e // J � � s (-frt./ P t r- , � rd ie-cl 4 4 Inspector r i%4_ . - .� Date : / J —. A PPROVED _. P •' aVED /CALL FOR REINSP. CO CITY OF TIGARD BUILDING INSPECTION NOTICE Inspection Line: 639 -4175 Business Phone: 639 -4171 Footing Rain Drain Cover /Service FINAL: Foundation Water Line Ceiling - - lumb. Post/Beam Mech. Shear /Sheath Framing -Mech. PIbg.Und /Flr /Slab Plbg. Top Out Insulation - Elect. Post/Beam Struct. Mech. Rough -in Gyp. Bd. -Bldg. San. Sewer Gas Line Appr /Sdwlk Reins. Other: Date: ? ‘ A.M. P.M. Entry: SE 14/ Address: 1-7 Y<S — 5 Tenant: Ste: MST: 26 o - S/� 2 BUP: Con /Own: e Z " 7 M EC: PLM: ELC: THE FOLLOWING CORRECTIONS ARE REQUIRED: ELR: Inspector: / L� / Date 7 7 S AP-PROVED DISAPPROVED/CALL FOR REINSP. CF CO CITY OF TIGARD BUILDING INSPECTION NOTICE Inspection Line: 639 -4175 Business Phone: 639-4171 Footing Rain Drain Cover /Service FINAL: Foundation Water Line Ceiling - Plumb. Post/Beam Mech. Shear /Sheath Framing -Mech. PIbg.Und /Flr /Slab Plbg. Top Out Insulation ®Q! 31' ✓ Post/Beam Struct. Mech. Rough -in Gyp. Bd. -Bldg. San. Sewer Gas Line Appr /Sdwlk Reins. Other: Date: L i A.M. 1r;'! P.M. Entry: Address: I 'D T .s i Tenant: Ste: MST: 9 5 6 7357 BUP: Con /Own: � MEC: Co 2 L lqa -- ] THE FOLLOWING CORRECTIONS ARE REQUIRED: ELR: / t . /' .. ' 'G / , ' r / 4e5 1/4 ■ - - �.► - 4..., ( / / Inspector: „ „/A// Date: "/ 2; APPROVED DISAPPROVED /CALL FOR REINSP. CF CO / CITY OF TIGARD BUILDING INSPECTION NOTICE Inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 639 -4171 Inspection: Footing Susp. Ceiling Sprink. Rough -in Appr /Sdwlk Foundation Plbg. Underslab Mech. Rough -in Fireplace Post /Beam Struct. Plbg. Top Out Elec. Rough -in FINAL: Post /Beam Mech. San. Sewer Gas Line -Bldg. Plbg. Underfloor Rain Drain Framing - Plumb. Alarm Water Line Insulation -Mech. Underflr. Insul. Shear all Gyp. Bd� -E- lect. Date Requested: 2 -i 2 T i 5 Time AM PM Address: I :)--U (45— -S--- — Builder: Permit #: 73 U 3 7 THE FOLLOWING CORRECTIONS ARE REQUIRED: . rjt_______.) '.9i/. . - .��,�.J 407 L- , AC v «,c_c.4J L �ulyc, wi -rzi .g 6 iui s 51-4 , c- e, Inspector: /1 ---****2 - Date: L49/940, APPROVED DISAPPROVED Z-AlaRROVETISUBJECT TO ABOVE _Call For Reinsp. CITY OF TIGARD BUILDING INSPECTION NOTICE Inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 639 -4171 Inspection: Footing Susp. Ceiling Sprink. Rough -in Appr /Sdwlk Foundation Plbg. Underslab Mech. Rou -in Fireplace Post /Beam Struct. Plbg. Top Out Elec. Rough -in FINAL: Post /Beam Mech. San. Sewer as Line -Bldg. Plbg. Underfloor Rain Drain Framing - Plumb. Alarm Water Line Insulation -Mech. Underflr. Insul. Shear Wall Gyp. Bd. - Elect. Date Requested: /1/43/q1 Time: AM PM Address 1 ' () S — T� Amt- Cl4?- 8y Builde • 53gr - o V (,8 Permit # ys' --Q3.S 2 THE FOLLOWING CORRECTIONS ARE REQUIRED: 45 S4 'i OFF VAC Vc' .mfr G/1c� >✓�ec�s cez5SS, (. 6 —'i? 6 - 1 4cisr A16v� Ur .7i el SEC",r4 - li„ 1 (.4 - A7lx^r Tier" - C - .vvr 4 cc� VA-e-7 d. 6 /24-xiec: PPo Inspector: i Date: Z �,� %- APPROVED s ' UISAF'NROVED APPROVED SUBJECT TO ABOVE ‘- Gall - I-or Reinsp. CITY OF TIGARD BUILDING INSPECTION NOTICE Inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 639 -4171 Inspection: Footing Susp. Ceiling Sprink. Rough -in Appr /Sdwlk Foundation Plbg. Underslab Mech. Rough -in Fireplace Post /Beam Struct. Plbg. Top Out .Elec. Rough -in FINAL: Post /Beam Mech. San. Sewer Gas Line — -Bldg. Plbg. Underfloor Rain Drain r min -Plumb. Alarm Water Line Insulation -Mech. Underflr. Insul. Shear Wall Gyp. Bd. - Elect. Date Requested: I ,--- LA-' 1 Time: AM PM Address: / o_O 7, ci- `_ Builder: Permit #: ( 75 - 03,7 THE FOLLOWING CORRECTIONS ARE REQUIRED: .4 \Gv )9 - . c� G- a v Inspector: _ Date: // APPROVED DISAPPROVED APPROVED SUBJECT TO ABOVE _Call For Reinsp. CITY OF TIGARD BUILDING INSPECTION NOTICE Inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 639 -4171 Inspection: Footing Susp. Ceiling Sprink. Rough -in Appr /Sdwlk Foundation Plbg. Underslab Mech. Rough -in Fireplace Post /Beam Struct. Plbg. Top Out lec. Rou. h -i ' FINAL: Post /Beam Mech. San. Sewer Gas Line 6 Plbg. Underfloor Rain Drain Framing - Plumb. Alarm Water Line Insulation -Mech. Underflr. Insul. Shear Wall Gyp. Bd. - Elect. lZ Date Requested: 1 'Z\ Cp Time: AM PM Address: / a—O 45" 7,s - r yk--LIB_ Builder; t y1 I1 L,d.P G., ��3 � Permit" #: 9'J 635 THE FOLLOWING CORRECTIONS ARE REQUIRED: (Lc 7 Y / e 6 <FEi i 7Y? q -f C /et .� Ple;74- - f-e r / r . 4 Pitt s ��9 �� , ��+ u y � �T� p-5 Ace 7 1/ c.dp/5 . /r i,e, /)/ ,� s s Jam_ ..17--e. (--7 4 ," I < cv 7 5--e f ,7 -:' "k Cd v rf- c /Ie, e 5-4-(4 1' er4a v-e Inspector: � 7 /! l�t.� e. / Date: `/ 27'`// S `„ _APPROVED _DISAPPROVED PPROVE D SUBJECT TO A UE f B ZCall For Reinsp. / �'lt ®h rti. � .-6 , _ CITY OF TIGARD BUILDING INSPECTION NOTICE ` 9t Inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 639 -4171 Inspection: �,• Footing Susp. Ceiling Sprink. Rough -in Appr /Sdwlk Foundation Plbg. Underslab C3MD. Rough -in Fireplace Post /Beam Struct. Plbg. Top Out Elec. Rough -in FINAL: Post /Beam Mech. San. Sewer Gas Line -Bldg. Plbg. Underfloor Rain Drain I' :� - Plumb. Alarm Water Line Insulation -Mech. Underflr. Insul. Shear Wall Gyp. Bd. - Elect. Date Requested: i / �iL / Time AM PM Address: / Builder: Permit #: 9 5 6, 3\ 7 THE FOLLOWING CORRECTIONS ARE REQUIRED: C A S/ry \,c5"--w-5 .0.?2 "1/ 4287 4/245 Q , r C/ `� - (4 - . 77! Te l- a t�i € /1/0GZG fr-Z fe-- L5 - • • , w/4' 2 fr' ' 6 2 77 ege t/L _f� GGry SS - v v T 7 /94, PO — S 1 7D J Ac4c 0 , / 5ifa et, Ali? C.c/l / "s c •7 o,v - s Inspector: � Date: 1 7 2 �/�C.0. APPROVED `6ISAPPROVED _APPROVED SUBJECT TO ABOVE Call For Reinsp. cIJ Yc :AZ- /, -y - 4 7 -7/4_5 - /A "�� //44 ©• 17, CITY OF TIGARD BUILDING INSPECTION NOTICE ).. Inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 639 -4171 Inspection: Footing Susp. Ceiling Sprink. Rough -in Appr /Sdwlk Foundation Plbg. Underslab Mech. Rough -in Fireplace Post /Beam Struct. Plbg. Top Out . Elec. Rough -in FINAL: Post /Beam Mech. San. Sewer Gas Line -Bldg. Plbg. Underfloor Rain Drain Framing - Plumb. Alarm Water Line Insulation -Mech. Underflr. Insul. h ar Gyp. Bd. - Elect. Date Requested: / /(2—(9 9 ( Time: AM _PM Address: /.2_0 q,s 7, Builder: Permit #: "7.5 03S THE FOLLOWING CORRECTIONS ARE REQUIRED: • � % � m 5 : cr7c9 ,1 /007 (> 1 ile--7 d_ Inspector: / Date: /X2.--/9-7 APPROVED !?PROVED APPROVED SUBJECT TO ABOVE _— eairFor Reinsp. CITY OF TIGARD BUILDING INSPECTION NOTICE Inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 639 4171 Inspection: y� Footing Susp. Ceiling Sprink. Rough -in Appr /Sdwlk Foundation Plbg. Underslab Mech. Rough -in Fireplace Post /Beam Struct. Plbg. Top Out Elec. Rough -in FINAL: Post /Beam Mech. San. Sewer Gas Line -Bldg. Plbg. Underfloor Rain Drain Framing - Plumb. Alarm Water Line Insulation -Mech. Underflr. Insul. ear WaiU Gyp. Bd. - Elect. Date Requested: l I if j Time: AM PM Address: (,-D---Q ( Builder: Permit #: S d 3S 7 THE FOLLOWING CORRECTIONS ARE REQUIRED: rr,� c '/a .S V 7 S/ -01-22 C _ C ii:L2L - '"7 1 ( Inspector: '\ Date: APPROVED AP- PROVED APPROVED SUBJECT TO ABOVE -- "Catt - For Reinsp. CITY OF TIGARD BUILDING INSPECTION NOTICE Inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 639 -4171 Inspection: Footing Susp. Ceiling Sprink. Rough -in Appr /Sdwlk Foundation Plbg. Underslab Mech. Rough -in Fireplace Post /Beam Struct. Plbg. Top Out Elec. Rough -in FINAL: -` Gas Line -Bldg. . Underfloor 4Mb, Framing - Plumb. • arm Water Line Insulation -Mech. Underflr. Insul. Shear Wall Gyp. Bd. - Elect. Date Requested: /6 /3� ( Time: AM Address: (4 ) - 10 Builder: Permit #: ' s C3�7 THE FOLLOWING CORRECTIONS ARE REQUIRED: / • Aar Aff Date: ( / 3 APPROVED _DISAPPRQVED PPROVED SUBJECT TO ABOVE Call For Reinsp.