Correspondence B V I° ,2.00 5 .- O60 g /o zf a O SW 90 A- vE
/mano M\
Randy Rutherford �•_I
Matrix Development Corp. CITY OF TIGARD
12755 SW 69 Ave., Ste. 100 CITY
Portland, OR 97223 O REGON
July 6, 2006
Dear Mr. Rutherford:
Enclosed with this letter are copies of the Payment Forms that state the
amount of Traffic Impact Fees that were deferred for Buildings 2 and 3 of
Ashbrook Condominiums.
Road Transit Total Due
Building #2: $4,233.00 $340.00 $4,573.00
Building #3: $5,229.00 $340.00 $5,569.00
Total $9,462.00 $680.00 $10,142.00
By policy, all System Development Charges must be paid at the time of
issuance of building permits, and any TIF's that were deferred must be
collected prior to occupancy. By error, Certificates of Occupancy were released
for both of these buildings prior to the collection of TIF payments.
As of July 1, 2006, Traffic Impact Fees have increased by 6 %. Therefore, in
order to avoid a recalculation of TIF, please submit payment in the amount of
$10,142.00 by July 14, 2006. Payments can be made in person, or by check /
cash. If submitting by check, please send payment to the address listed below
to my attention.
We apologize for any inconvenience this may have caused you and appreciate
your attention to this matter.
If you have any questions, please feel free to contact me at 503- 718 -2643.
Respectfully,
g a/V 4114. 14-et4.
Carissa Collins
Management Analyst
13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772
Ft _ .
.April 27, 2005. •
CITY OF,TIG D
OREGON
Randy Rutherford •
Matrix Development Corporation
12755 SW 69 Avenue, Suite 100
;.Portland, OR 97223
RE: NEW TOWNHOUSE BUILDING
Project Information
Building Permit: BUP2005 -00083 Occupancy Type. R3
• Tenant Name: Ashbrook Condominiums • Construction Type:' VN ' •
4 Z
Address: .
00 SW 90t Avenue • Occupant Load : ' 20
Area: 7,616 Sq Ft
, Stories: 3 •
The plan review was performed under the State of Oregon Residential Specialty Code
(ORSC) 2005 edition. The plans are 'approved as "Townhouses" by definition per section
R202.The submitted plans are approved subject to the following conditions: ,
SPECIAL INSPECTION: The City of Tigard, Building Division, is requiring Structural
Observations per section 1709 Oregon Structural Specialty Code (OSSC). The owner shall
employ'a registered design professional to perform structural observations as defined in
Section 1702, OSSC. The structural observations shall take place after the framing of
each floor level prior to the installation of floor joist or roof trusses above the structural
framing. Deficiencies shall be reported in writing to the owner and to the City of Tigard,
Building Division, attention Hap Watkins. FYI The structural observations do not waive the
framing inspection required by section R109.1.4 ORSC.
Dwelling unit wall separation is approved per section R317.2, Exception as a common 2-
hour fire - resistance rated wall. See GA FILE NO WP3820 sheet D1 •
Approved Plans: 1 set of approved plans, bearing the City of Tigard approval stamp, shall
be maintained on the jobsite. The plans shall be available to the Building Division inspectors
throughout all phases of construction. 106.4.2 OSSC
Certificate of Occupancy: No building or structure shall be used or occupied until the
Building Official has issued a certificate of occupancy 109.1 OSSC
Premises Identification: Approved numbers or addresses shall be provided for all new
buildings in such a position as to be plainly visible and legible from the street or road
fronting the property.
•13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772
1=G
When submitting revised drawings or additional information, please attach a copy of the
enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the City of
Tigard in tracking and .rocessing the documents.
Respec ,
aloek,
or Plans Examiner