Permit NI iv. - CITY OF TIGARD BUILDING PERMIT PERMIT #: BUP2006 -00524 COMMUNITY DEVELOPMENT DATE ISSUED: 10/17/2007 TIGARD 13125 SW HaII Blvd., Tigard, OR 97223 503.639.4171 PARCEL: 2S113B0 - 00600 SITE ADDRESS: 16580 SW 85TH AVE ZONING: I -P SUBDIVISION: SEWER TREATMENT PLANT LOT: JURISDICTION: TIG PROJECT: CLEAN WATER SERVICES Project Description: Aeration Basin modification. REISSUE: FLOOR AREAS EXTERIOR WALL CONSTRUCTION CLASS OF WORK: ALT FIRST: sf N: S: E: W: TYPE OF USE: COM SECOND: sf PROJECT OPENINGS? TYPE OF CONST: 2FR : sf N: S: E: W: OCCUPANCY GRP: F2 TOTAL AREA: 0 sf ROOF CONST: FIRE RET? OCCUPANCY LOAD: BASEMENT: sf AREA SEP. RATED: STOR: HT: ft GARAGE: sf OCCU SEP. RATED: BSMT ?: MEZZ ?: REQD SETBACKS REQUIRED FLOOR LOAD: psf LEFT: ft RGHT: ft FIR SPKL: SMOK DET: DWELLING UNITS: FRNT: ft REAR: ft FIR ALRM : HNDICP ACC: BEDRMS: BATHS: IMP SURFACE: PRO CORR: PARKING: VALUE: $ 1,200,000.00 Owner: Contractor: CLEAN WATER SERVICES INTELLIGENT COMMUNITY SERVICES INC 2550 SW HILLSBORO HWY 9400 SW BVTN -HILLS HWY STE 205 HILLSBORO, OR 97123 -9379 BEAVERTON, OR 97005 Phone: 503 - 681 -3600 Contact #: PRI 503 - 972 -7800 Reg #: LIC 161620 FEES Description Date Amount REQUIRED ITEMS AND REPORTS [BUPPLN] Pln Rv 10/31/200E $3,108.92 Reinforced concrete [FLS] FLS Pin Rv 10/31/200E $1,673.88 Bolts in concrete FLS FLS Pin Rv 1 1/27/200E $239.13 Structural welding di ns [FLS] Structural welding g [BUILD] Permit Fee 11/27/200E $4,782.80 Special inspection (see plat (additional fees not listed here) Total $11,627.35 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more than 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those . -s are set forth in OAR 952 - 001 -0010 through OAR 952 - 001 -0100. You may obtain a copy of these rules or direct questions to OUNC by ca g 50 3.246.6699 oi`1. ; it! 332.2344. I . sued By: • 4��r, , , / Permittee Sgnature: . 1 � �___, Call 503.639.4175 by 7:00 a.m. for an inspectio at business day. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. v ) 5 ° ',Ct IN Building Permit Application RECEIVE FOR OFFICE USE ONLY City of Tigard Dae / o� » vb 4' PermitN..: a f'a�� -oe Nt• I - " 13125 SW Hall Blvd., Tigard, OR 97223 OCT 31 2006 D at e /B view Phone: 503.639.4171 Fax: 503.598.1960 DateBy: !II A1/ /467/ Other permit: TIGARD Inspection Line: 503.639.4175 CITY OF TIGARD Date Ready/By: Juri • ® See Attached Checklist for Internet: www.tigard or.gov �3Uff UtNG nivIstn Notified/Method: Supplemental Information TYPE OF WORK REQUIRED DATA: 1- AND 2- FAMILY DWELLING ---- ❑ New construction ❑ Demolition Permit fees* are based on the value of the work performed. C Indicate the value (rounded to the nearest dollar) of all ® Addition/alteration/replacement El Other: equipment, materials, labor, overhead, and the profit for the Q CATEGORY OF CONSTRUCTION work indicated on this application. ID 1- and 2- family dwelling ® Commercial/industrial Valuation: $ ID Accessory building ❑ Multi - family Number of bedrooms: r. ❑ Master builder ❑ Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: 16580 S.W. 85 Street New dwelling area: square feet City/State /ZIP: Tigard, OR 97224 Garage /carport area: square feet Suite/bldg. /apt. no.: Project name: Durham Wastewater Facilit Covered porch area: square feet _lt) Cross street/directions to job site: Deck area: square feet Other structure area: square feet REQUIRED DATA: COMMERCIAL -USE CHECKLIST-- Subdivision: Lot no.: Permit fees* are based on the value of the work performed. t Tax map /parcel no.: Indicate the value (rounded to the nearest dollar) of all equipment, materials, labor, overhead, and the profit for the DESCRIPTION OF WORK work indicated on this application. Aeration Basin #1 Plug Flow Modificaitons Valuation: $$1,200,000.00 Existing building area: n/a square feet New building area: n/a square feet ® PROPERTY OWNER ❑ TENANT Number of stories: Name: Clean Water Services Type of construction: concrete Address: 16580 S.W. 85 Street Occupancy groups: City/State /ZIP: Tigard, OR 97224 Existing: n/a Phone: (503)547 -8150 Fax: (503)547 -8151 New: n/a 0 APPLICANT JONTACT PERSON NOTICE Business name: Clean Water Services All contractors and subcontractors are required to be Contact name: Perry Sunderland licensed with the Oregon Construction Contractors Board Q ` u nder ORS 701 and may be required to be licensed in the Address: 16580 S.W. 85 Street „ a jurisdiction in which work is being performed. If the City/State /ZIP: Tigard, OR 97224 /`� applicant is exempt from licensing, the following reasons apply: Phone: (504) 547 -8038 6tl Fax: : (503) 547 -8001 E -mail: sunderlandp @cleanwaterservices.org CONTRACTOR o ii / Business name: / -Q(4L 14 r t2 °HHsi ( r y i,G f 5 /At. BUILDING PERMIT FEES* Address: 9i�An � _ 141447)4.4t , y t 9 J (Please refer to fee schedule) City/State/ZIP: /trN a2 ! 7OUt)" Structural plan review fee (or deposit): Phone: (6 ) f\7g . nee) y) Fax: ( ) FLS plan review fee (if applicable): / Total due upon application: CCB lic.: /6 /CO 9l1oft�q a 4782.8 �(�D Amount received: ,f Authorized signature: Ttl f d T his permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. • t name: Date: * Fee methodology set by Tri -County Building Industry Service Board. I:\Building\Permits\BUP- PermitApp.doc 03/21/06 4404613T(I1/02/COM/WEB) /65 giO MSC consulting structural engineers Charles Gary Peterson, P.E. Erik W.B. Peterson, P.E. Travis G. McFeron, P.E. Peterson Structural Engineers, Inc. 5319 sw westgate drive, suite 215 portland, oregon 97221 503/292 -1635 fax: 503/292 -9846 Lynne Chicoine West Yost & Associates 1800 Blankenship Rd., Suite 425 West Linn, Oregon 97068 64) )D1) (,'0o c ` I 3/12/07 Re: CWS Durham AB2 Modifications — Footing Structural Observation Dear Lynne : The following structural observation report has been generated based on our site visit made on 3/9/07 to review the forming and reinforcing for the new baffle wall footings. At the time of our visit the Contractor had completed construction of the forms and reinforcing for one of the four footings and was continuing work to fmish the other three. Based on our observations we found the subject items to be in substantial compliance with the contract documents with the exception of the following items: In the areas where the new footings are adjacent to the existing walkway piers, the adjacent reinforcing was resting against the existing concrete pier and did not obtain minimum required clearances. We asked the Contractor to cut/adjust reinforcing to obtain clearance. Per the request of the Owner, the Contractor had installed a small blockout in the base of. each footing to allow for wash -down. The Contractor appears to have made a reasonable field revision to allow for the blockouts. Bond breaker had not yet been applied to the smooth dowels anchored to the existing floor slab. We assume this will be completed prior to concrete installation but this should be verified. Please call if you have any questions. F l L E COPY Sincerely, �F,� FROF4.S � � L NG 27 F R OR EG 001°21111 r' O i 2c r 9 2°° :4 � Erik Peterson, P.E. 41 1 C. P EXPIRES 12/31/08 Submitted via Email — LChicoine @westyost.com cc via e-mail — HighhouseJ @CleanWaterServices.org � � v ELC M5E � S consulting structural engineers Charles Gary Peterson, P.E. Erik W.B. Peterson, P.E. Travis G. McFeron, P.E. Peterson Structural Engineers, Inc. 5319 sw westgate drive, suite 215 portland, oregon 97221 503/292 -1635 fax: 503/292 -9846 Lynne Chicoine West Yost & Associates 1800 Blankenship Rd., Suite 425 &VP � We st Linn, Oregon 97068 � D � (!/ --0 � t.( 3/21 /07 Re: CWS Durham AB 1 Modifications — Baffle Wall Structural Observation Dear Lynne: The following structural observation report has been generated based on our site visit made on 3/21/07 to review the forming and reinforcing for the new baffle walls. At the time of our visit the Contractor had completed construction of the reinforcing and one side of the form work for one of the four walls and was continuing work a second. It is our understanding that they intend to pour two of the walls on 3/22/07 and two of the walls at a later date. Based on our observations we found the subject items to be in substantial compliance with the contract documents. Please call if you have any questions. FILE Sincerel P EE' COPY y, \� , NG 1 Nt ", ;or a ilPW P I I - • - • - , I' ' Erik Peterson, P.E. I EXPIRES 1 2/31 X08 Submitted via Email — LChicoine @westyost.com cc via e -mail — HighhouseJ @CleanWaterServices.org /6 MZE consulting structural engineers Charles Gary Peterson, P.E. Erik W.B. Peterson, P.E. Travis G. McFeron, P.E. Peterson Structural Engineers, Inc. 5319 sw westgate drive, suite 215 portland, oregon 97221 503/292 -1635 fax: 503/292 -9846 Lynne Chicoine West Yost & Associates 1800 Blankenship Rd., Suite 425 // u l Oc West Linn, Oregon 97068 10/18/07 Re: CWS Durham AB 1 Modifications — Summary Structural Observation Report Dear Lynne: The following summary structural observation report has been generated based on our site visits made to review the forming and reinforcing for the new baffle walls. The criteria for these observations are outlined in the general structural notes in the contract drawings. Observation visits made were as follows: • 3/9/07 — Baffle Wall Footings Forming and Reinforcing • 3/21/07 — Baffle Walls Forming and Reinforcing Based on our observations we found construction of the subject items to be in substantial compliance with the contract documents. Please call if you have any questions. FILE COPY Sincerely, �� N F , .:„.. r OF2E- - E • i ,fir s ; Erik Peterson, P.E. � ql/ 'LI AM EXPIRES 12/31/08 Submitted via Email — LChicoine @westyost.com RECEIVED OCT 23 2001 "1 Y ur i iuARD BUILDING DIVISION