Permit MASTER CITi OF TIGAIPAIRD
MASTER
# • MST96 -03S1
COMMUNITY DEVELOPMENT DEPARTMENT DATE ISSUED: 07/11/96
13125 SW Hall Blvd. Tigard, Oregon 97223.8199 (503) 639 -4171 PARCEL: 2S111 AA -GPO 5(3
SITE Ai, i t F 3.... 1437e SW tai I H AVE
SUBDIVISION • GREENSWARD PARK NO. 2 ZONING: R - -4.5
BLOCK • LOT • 058
Remarks: PATH I
REISSUE: STORIES : 1 FLOOR AREAS — BASEMENT...: 82 sf REQUIRED SETBACKS -- REQUIRED-- -
CLASS OF WORK. :NEW FIGHT • 32 FIRST • 1886 sf GARAGE • 624 sf LEFT : 5 SMOKE DETECTRS: Y
TYPE OF USE...:SF FLOOR LOAD • 48 SECOND...: 0 sf FRONT • 26 PARKING SPACES: 1
TYPE OF CONST.:5N DWELLING LNVITS: 1 FINBSPENT: 0 sf RIGHT • 10
OCCUPANCY GRP.:R3 BDRM: 4 BATH: 2 TOTAL - - - -: 1886 sf VALUE..$: 137921 REAR • 51
________________________________________________________ NUMBING - -- ------- ---- -- -- - - - - - --
SINKS : 1 WATER CLOSETS.: 2 WASHING MACH..: 1 LAUNDRY TRAYS.: 1 RAIN DRAIN ft: 0 TRAPS • 0
LAVATORIES • 3 DISHWASHERS...: 1 FLOOR DRAINS..: 0 SEWER LINE ft: 0 SF RAIN DRAINS: 1 CATCH BASINS..: 0
TUB /SHOWERS...: 3 GARBAGE DISP..: 1 WATER HEATERS.: 1 WATER LINE ft: 1v BCKFLW PREVNTR: 1 GREASE TRAPS..: 8
OTHER FIXTURES: 0
_
------------------------ - MECHANICAL -----_--____--_--_--
FUEL TYPES - - - - -- FURN ( 1081( ..: 1 BOIL /CMP ( 3HP: 0 VENT FANS • 3 CLOTHES DRYERS: 1
/GAS/ / / FURN ) =100K ..: 0 UNIT HEATERS..: 8 HOODS • 1 OTHER UNITS...: 1
MAX INP.: 0 BTU FLOOR FURNACES: 0 VENTS : 0 WOODSTOVES • 0 GAS OUTLETS...: 1
- -------------------- ELECTRICAL - --_ — --
-- RESIDENTIAL UNIT - -- — SERVICE /FEEDER— —TEMP SRVC /FEEDERS -- -- BRANCH CIRCUITS - -- --- MISCELLANEOUS -- - -ADD'L INSPECTIONS- -
1000 SF OR LESS: 1 0 - 200 amp..: 0 0 - 200 amp..: 0 W /SVC OR FDR..: 0 PUMP /IRRIGATION: 0 PER INSPECTION: 8
EA ADD'L 500SF.: 4 201 - 400 alp..: 0 201 - 408 alp..: 0 1st W/O SVC /FOR: 0 SIGN /OUT LIN LT: 0 PER HOUR • 0
LIMITED ENERGY.: 0 401 - 600 alp..: 0 401 - 600 amp..: 0 EA ADDL BR CIR: 0 SIGNAL /PANEL...: 0 IN PLANT • 0
MAMF HM /SVC /FDR: 0 601 - 1000 amp.: 8 681 +amps -1800 v: 0 MINOR LABEL -10: 0
180+ amp /volt.: B ----------------------- -- PLAN REVIEW SECTION --------- -
Reconnect only.: 0 )=4 RES UNITS..: SVC /FDR) =225 A.: ) 600 V NOMINAL: CLS AREA /SPC OCC:
- -- - - - - - -- ---------- - - - - -- ELECTRICAL - RESTRICTED ENERGY ----- - - - - -- — -- - - - -
A. SF RESIDENTIAL - - - -- - - -- B. COMMERCIAL - -- --------------------- - ---- -- --- - - - - --
AUDIO X STEREO.: VACUUM SYSTEM..: AUDIO & STEREO.: FIRE ALARM • INTERCOM /PAGING: OUTDOOR LNDSC LT:
BURGLAR ALARM..: 0TH: :: X BOILER HVAC • LANDSCAPE /IRRIG: PROTECTIVE SIGNL:
GARAGE OPENER..: CLOCK • INSTRUMENTATION: MEDICAL • OTHR: ..
HVAC • DATA /TELE COMM.: NURSE CALLS • TOTAL MM SYSTEMS: 0
Owner: -- - - ----- --- - Contractor: ------------- --- - -- TOTAL FEES:$ 4443.11
ROSEWOOD HOMES INC ROSEWOOD HOMES INC
7140 SW 209TH 7140 SW 209TH
BEAVERTON OR 97007 BEAVERTON OR 97007
Phone MM: 642 -4049 Phone M): 642 -4049
Reg *..: 69173
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of Ore. Specialty Codes and all other
applicable laws. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180
days of issuance, or if work is suspended for more than 180 days.
-------------------- ------------------------ REQUIRED INSPECTIONS ----------------- - -- ---- --
Footing Insp PLM /Underfloor Framing Insp Gas Fireplace Water Service In Building Final
Foundation Insp Mechanical Insp Shear Wall Insp Insulation Insp Appr /Sdwlk Insp Erosion Control
Post /Beam Struct Plumb Top Out Low Voltage Gyp Board Insp Electrical Final
Post /Bea■ Mechan Electrical Servi F -epl --e Insp Rain drain Insp Mechanical Final
Crawl Drain E A r ,' ee Si By: P �tX 4\4M d
-
Call for inspection - 639 -4175
CITY OF TIGARD
13125 S.W. HALL BLVD.
TIGARD, OR 97223
IMPORTANT PERMIT NOTICE
ROBERTS ELECTRIC INC
5759 SW 48TH
PORTLAND OR 97213
Electrical Signature Form
Permit # MST96 -0351
Date Issued.: 07/11/96
Parcel • 2S111AA -GP058
Site Address: 14377 SW 88TH AVE
Subdivision.: GREENSWARD PARK NO. 2
Block Lot: 058
Zoning • R - 4.5
Remarks:
PATH I
Your company has been indicated as the electrical contractor for the permit indicated above. In
order for the electrical permit to be valid, the signature of the supervising electrician
is required.
Please have the appropriate individual from your company sign below and return this Electrical
Signature Form prior to the start of work. No electrical inspections will be authorized until
this completed form is received.
AN INK SIGNATURE IS REQUIRED ON THIS FORM
OWNER: ELECTRICAL CONTRACTOR:
ROSEWOOD HOMES INC ROBERTS ELECTRIC INC
7140 SW 209TH 5759 SW 48TH
BEAVERTON OR 97007 PORTLAND OR 97213
Phone #: 642 - 4049 Phone #:
Reg #..: 9388
X / 61€//(#1-14‘..-
Signature of Supervising Electrician
Please return this completed form to the address above.
ATTN: Building Dept.
If you have any questions, please call 639 -4171, ext. #310
CITY OF TIGARD
13125 S.W. HALL BLVD.
TIGARD, OR 97223
IMPORTANT PERMIT NOTICE
J & R PLUMBING
18886 SW SHAW ST
ALOHA OR 97007
Plumbing Signature Form
Permit # • MST96 - 0351
Date Issued.: 07/11/96
Parcel 2S111AA -GP058
Site Address: 14377 SW 88TH AVE
Subdivision.: GREENSWARD PARK NO. 2
Block Lot: 058
Zoning • R - 4.5
Remarks:
PATH I
Your company has been indicated as the plumbing contractor for the permit indicated above. In order
for the plumbing permit to be valid, please have the appropriate individual from your company sign
below and return this Plumbing Signature Form prior to the start of work. No plumbing inspections
will be authorized until this completed form is received.
AN INK SIGNATURE IS REQUIRED ON THIS FORM
OWNER: PLUMBING CONTRACTOR:
ROSEWOOD HOMES INC J & R PLUMBING
7140 SW 209TH 28886 SW SHAW T—
254E0 5 w ,a,
BEAVERTON OR 97007 ALOHA OR 97007
Phone #: 642 - 4049 Phone #:
Reg #..: 72680
X b(AA ,
Signature of Authorized Plumber
Please return this completed form to the address above.
ATTN: Building Dept.
If you have any questions, please call 639 -4171, ext. #310
-� 1
Z
1
Residential Building Permit Application
City of Tigard
13125 SW Hall Blvd.
Tigard, OR 97223
(503) 639 -4171
Jobsite Address: ??? s � /�
8 v&. 6
Ala u)advid /La sek
Subdivision: Lot # _ . T Office Use Only
Valuation: ��791z/ Contact Date / /7)/ Initials -Ca
7 Result V ma I/ R • f
New Construction Only: (Square Footage)
Planck/Rec#
House: /966 Garage: Permit # /V504 -e3S f
Reissue of
Corner Lot? Y S Flag Lot? Y Map &
Zone��
Owner: R r ew c ari /-7/m, -d9oS, /0-2 c_ Plat* { )
Address: 7/4/0 cS 12) 46)9' Approvals Required
cam✓ 7�ia ,� 9 2 V7 Planning Setbacks OV Solar
Engineering }t * it Oa 7 . B aJ
Phone: (SOc3) 65 - ji�D
Other P
Contractor: . Items Required
Address: Subcontractors
Truss Details
Other
Phone: ( ) Notes /C f(JL Aryl fittmlimeo-
Contractor's License # 69/7_ 1 O
G
1 (attach copy of current Oregon license)
Contact Name: z3 6 l ?czpp
Contact Phone: (S`o3) g4/1 > 9 6I
Subcontractors: ( C e 1 0
Architect/Engineer: - „ �j�f
,/3aS �4 ?yip--
Plumbing: �� • Address: �s.1:Ar,: _ -�___ _ -�! 7
/ 742/7 - . A/Z 99..
Mechanical: i - r wi
(attach co • of current • Contractor' License) p
Electrical: / o��v �� L��� Ti�ir _ Phone: (S03 o? 2
1 c - //67
JOB DESCRIPTION: dlif'7 li (503) G 9 ,9- rl 96 4
Applicant Signature Appli a t Phone number
Received by: — Date Received: fO`.2.-G — 16
H” JogindstsVesapp
Permit # Account Description Amount Amt. Pd. Bal. Due
ms t I -o 351 Bldg. Permit (BUILD) 6.2 8" vv 324' • •
Plumb. Permit (PLUMB) / 9S'. /qj r
Me , h. Permit (MECH) 40 41) yo,, - v
s Tax (TAX)
tate _ _ _
Bldg: oZ6.rf' S0.6e , puo
Plumb: I II /
Mech: .7. 03
4 1 ctts, cc,1 /Z.
Plan Check (PLANCK) 3 X13. Zo 26) �' 93 AR
Bldg: 3V 3. ?v
Plumb:
Mech: /0•13 3 / 0.1
115 -033V Sewer Connection (SWUSA) I??* O „21
Sewer Inspection (SWINSP) 3 3
Parks Dev Charge (PKSDC) / Oct / of 2
Residential TIF (TIF -R) ti ; 0 ) V 7 0
Mass Transit TIF (TIF -MT) / 2-0 ) 2, d
Commercial TIF (TIF -C)
Industrial TIF (TIF -I)
Institutional TIF (TIF -IS)
Office TIF (TIF -0)
Water Quality (WQUAL) / 1 tr-a
Water Quantity (WQUANT) /011 / 0 0
Fire Life Safety (FLS)
Erosion Cntrl Permit (ERPRMT) G (/ (, el
Erosion Planck/USA (ERPLAN) 2irkV ?they
Erosion Pianck1COT (EROSN) 0 P- fi
TOTALS:
4.01611. �...� d Y.Ztf• /'
J
•
Solar Balance Point Standard Worksheet
Address
Box A calculations: North -South dimension for the lot. Box A:
This dimension is determined by finding the midpoint of the North lot line and drawing
an intersecting line perpendicular to that point.
First, determine which property line is the North lot line. The North lot line is the line
with the smallest angle from a line drawn east -west and intersecting the northern most
point of the lot.
45 —
LOT LOT UNE
N North -South
Dimension for Lot:
Measure the distance from the midpoint of the North lot line to the South lot line along
the described line.
6 feet
NOR H -SOUTH DIMENSION
Box B calculations: Shade point height for your residence. Box B:
1. Determine whether measurements will be based on the peak or eave of your Which describes
structure. The orientation of the ridge is also important. your residence?
04 Facc
1 a: If the roof line runs North - South, measurements will f (circle one)
be based on the peak of the roof. 0000
nuam
NORM A 1B 1C
1 b: If the roof line runs East -West and the roof pitch is
less than 5/12, measurements will be based on the
eave.
SHADE POINT EASE
1 c: If the roof line runs East -West and the roof pitch is
5/1 2 or steeper, measurements will be based on the o�2 Ao
peak.
SHADE F1'INT RIDGE
Box B. continued Box B:
2. Measure change in elevation from front property line to finished floor elevation. If
the lot slopes up from the front lot line to the foundation, the figure is positive. If
the lot slopes down from the front lot line to the foundation, the figure is negative. S. ft
3. Measure distance from finished floor elevation to the affected peak/eave. + JD?. ft
4. If the roof line runs North- South, deduct three feet. If the roof line runs East -West, - S. U ft
deduct nothing.
5. Subtract one foot for each foot of difference in elevation from the front property
line to the rear property line, if the lot slopes up from the front to the rear. If the
lot has no slope or slopes up from the rear to the front, deduct nothing. - /3. 0 ft
6. Total figure for box B: aD ft
Box C. Distance to the shade reduction line. Box C:
1. Measure the distance from the North property line to the foundation near the ,(. J ft
affected peak/eave.
2. Measure the distance from the foundation to the affected peak or eave. + ft
3. Total figure for box C: '9.2,5 ft
It is most useful to draw a vertical line to represent the appropriate figure found in box "A" and a horizontal line to represent the
appropriate figure found in box "C ". The intersection of the vertical and horizontal lines determines the value found in box "D ". The value
in box "D" should be compared to the value in box "B "; if the value in box "B" is less than or equal to the value found in box "D ", then
the building is in compliance with the solar balance code. If you have any questions, please contact us at 639 -4171, x304 or at the
Community Development Counter.
MAXIMUM PERMITTED SHADE POINT HEIGHT (In Feet)
Distance to North -south lot dimension (in feet)
shade 100+ 95 90 85 80 75 70 65 60 55 50 45 40
reduction line
from northern
Jot line fin feet)
70 40 40 40 41 42 43 44'
65 38 38 38 39 40 41 42 <3
60 36 36 36 37 38 39 40 41 42
55 34 34 34 35 36 37 38 39 40 41
50 32 32 32 33 34 35 36 37 33 39 40
45 30 30 30 31 32 33 34 35 36 37 38 39
40 28 28 21
8 29 30 31T 32 38 34 35 36 37 38
35 26 26 26 27 28 29 30 31 32 33 34 35 36
30 24 24 24 25 26 27 28 2p 30 31 32 33 34
25 22 22 22 23 24 25 26 27 28 29 30 31 32
20 20 20 20 21 22 23 24 25 26 27 28 29 30
15 18 18 18 19 20 21 22 23 24 25 26 27 28
10 16 16 16 17 18 19 20 21 22 23 24 25 26
5 14 14 14 13 16 17 18 1) 20 21 22 23 24
Box D. Maximum allowed shade point height: 3 feet
CITY OF TIGARD BUILDING INSPECTION NOTICE
Inspection Line: 639 -4175 Business Phone: 639 -4171
Footing Rain Drain Cover /Service FINAL:
Foundation Water Line Ceiling - Plumb.
(1 ) Shear /Sheath Framing
PIbg.Und /Flr /Slab Plbg. Top Out Insulation - Elect.
PsT/Beam Struc Mech. Rough -in Gyp. Bd. Bld
San. Sewer Gas Line Appr /Sdwlk
Other: 1 /
Date: 3 7 ! / Al A.M. p P.M. Entry:,��II,,
Address: ( : - 7 7 8 E
Tenant: Ste: MST: c 63S—/
BUP:
Con /Own: MEC:
PLM:
ELC:
THE FOLLOWING CORRECTIONS ARE REQUIRED: ELR:
6 AP,€ A/ / /�/// S /f
Inspector: Date: 3/2/97
APPROVED DISAPPROVED /CALL FOR REINSP. CF CO
CITY OF TIGARD BUILDING INSPECTION NOTICE
Inspection Line: 639 -4175 Business Phone: 639 -4 i
Footing Rain Drain Cover /Service / ' FINA .
Foundation Water Line Ceiling i - umb.
Post/Beam Mech. Shear /Sheath Framing -Mech.
PIbg.Und /FIr /Slab Plbg. Top Out ulatio - Elect.
Post/Beam Struct. Mech. Rough -in Gyp. Bd. -Bldg.
San. Sewer Gas Line Appr /Sdwlk Reins.
Other:
:: f T �j i�C ( A.MEnt ry ss: ` ( (j 7 7
Tenant: Ste: MST: 76, r Ict
/ l ^ `9',_ pG /_ Q M U
Con /Own: U/ Z O � 'P D l MEC :
PLM:
ELC:
THE FOLLOWING CORRECTIONS ARE REQUIRED: ELR:
2�4[/e° C fo '"/ 5 Cam_
/4c SvlcTc ‘ �-
9 7
Inspector: Date: / 7 6 T
5 VED _ DISAPPROVED /CALL FOR REINSP. CF CO
CITY OF TIGARD BUILDING INSPECTION NOTICE
Inspection Line: 639 -4175 Business Phone: 639 -4171
Footing Rain Drain Cover /Service FINAL:
Foundation Water Line Ceiling - Plumb.
Post/Beam Mech. Shear /Sheath Framing -Mech.
PIbg.Und /FIr /Slab Plbg. Top Out Insulation lec
Post/Beam Struct. Mech. Rough -in Gyp. Bd. -Bldg.
San. Sewer Gas Line Appr /Sdwlk Reins.
Other:
Date: ' It 3 1 q A.M. P.M. [ � Entry: R t4 =
Address: / 4 1 37 7 F /1 -(/\ /__
Tenant: Ste: MST: f 6 Cis/
BUP:
Con /Own: rn.e.44— M EC:
PLM:
ELC:
THE FOLLOWING CORRECTIONS ARE REQUIRED: ELR:
- --7 ° CF C'[ CQ. 1 c eri e'.
Inspector: 27'(' L{ /_.P - ( le L ., c r Date: �� 7
X APPROVED DISAPPROVED /CALL FOR REINSP. C CO
CITY OF TIGARD BUILDING INSPECTION NOTICE
Inspection Line: 639 -4175 Business Phone: 639 -4171
Footing Rain Drain Cover /Service FINAL:
Foundation Water Line Ceiling - Plumb.
Post/Beam Mech. Shear /Sheath Framing -Mech.
PIbg.Und /FIr /Slab Plbg. Top Out Insulation - Elect.
Post/Beam Struct. Mech. Rough -in CGyp. BO -Bldg.
San. Sewer Gas Line Appr /Sdwlk Reins.
Other:
Date: ig -. , -1 A.M. P.M. ntry:
q Address: _ / 3 C 7 Su) ( Feat-
Tenant: � �
/ �[ G Ste: MST
Con /Own: BUP:
(G ! ` -� ` 6(c MEC:
PLM:
ELC:
THE FOLLOWING CORRECTIONS ARE REQUIRED: ELR:
Inspector: Date: "� ��
PROVED DISAPPROVED/CALL FOR REINSP. CF CO
CITY OF TIGARD BUILDING INSPECTION NOTICE
Inspection Line: 639 -4175 Business Phone: 639 -4171
i
Footing Rain Drain Cover /Service FINAL.
Foundation Water Line Ceiling - Plumb.
Post/Beam Mech. Shear /Sheath Framing -Mech.
PIbg.Und /FIr /Slab Plbg. Top Out Insulation - Elect.
Post/Beam Struct. Mech. Rough -in Gyp. Bd. -Bldg.
San. Sewer Gas Line Appr /Sdwlk Reins.
Other:
Date: / - 0 7.6o -9 , PM Ent 7 Entry:
Address: / 4 7 7 ( SG<J a �ck
Tenant: Ste: MST: f6 -
BUP:
Con /Own: �G 7 _73,2_ � �� - MEC:
PLM:
ELC:
THE FOLLOWING CORRECTIONS ARE REQUIRED: ELR:
s� /...: On" "I v _ '
. / . _
ipt
iI
Inspector: ,1 Date:
ROVED DISAPPROVED /CALL FOR REINSP. CF CO
CITY OF TIGARD BUILDING INSPECTION NOTICE
Inspection Line: 639 -4175 Business Phone: 639 -4171
Footing ,, Rain Drain Cover /Service FINAL:
oundation �t) A Line Ceiling - Plumb.
Post/Beam Mech. Shear /Sheath Framing -Mech.
PIbg.Und /FIr /Slab Plbg. Top Out Insulation - Elect.
Post/Beam Struct. Mech. Rough -in Gyp. Bd. -Bldg.
San. Sewer Gas Line Appr /Sdwlk Reins.
Other: �/ J
Date: 7 - 3/ / ' ` .M. P.M. ntry:/
Address: / 77 ZS `
Tenant: Ste: MST:6 -6 3 5 (
BUP:
Con /Own: �� 3 �" MEG:
C PLM:
ELC:
THE FOLLOWING CORRECTIONS ARE REQUIRED: ELR:
4iSYlX-c-- /1eLeC44... SizZ"
74 C<.-ef
•
■11
"� 7 Inspe • : Date:
_APPROVED DISAPPROVED /CALL FOR REINSP. CF CO
CITY OF TIGARD BUILDING INSPECTION NOTICE
( IL
Inspection Line: 639 -4175 Business Phone: 639 -4171
Footing (ain - Dr - r -Dr-r Cover /Service FINAL:
Foundation ater Ceiling -Plumb.
Post/Beam Mech. Shear /Sheath Framing -Mech.
• bg.Und /Flr /Sla• Plbg. Top Out Insulation - Elect.
Post/Beam Struct. Mech. Rough -in Gyp. Bd. -Bldg.
Gas Line Appr /Sdwlk Reins.
Other:
Date: 8 I Z( (� tP A.M. P.M. p Entry:
L �y O
Address: / 3 7 b T
Tenant: Ste: MST: 9 0357
BUP:
Con /Own: MEC:
PLM:
ELC:
THE FOLLOWING CORRECTIONS ARE REQUIRED: ELR:
Inspector: Date : (5?/*/ "
APPROVED DISAPPROVED /CALL FOR REINSP. CF CO
CITY OF TIGARD BUILDING INSPECTION NOTICE
Inspection Line: 639 -4175 Business Phone: 639 -4171
Footing Rain Drain Cover /Service FINA_:
Foundation Water Line Ceiling -Plu
Post/Beam Mech. et Sheath Framing -Mech.
Plbg.Und /Flr /Slab ... Top Out Insulation - Elect.
Post/Beam Struct. Mech. Rough -in Gyp. Bd. -Bldg.
San. Sewer Gas Line ,s Appr /Sdwlk Reins.
Other: S 6 o �� "' k
Date: // — V ----- - ' A.M. P.M. ER&9c.,
Address: / V 3 7 7 cS u EE~ C — G+
Tenant: t - � l Ste: MST: 4. 0 3 S/
BUP:
Con /Own:
IJ `f -0 / c.. MEC:
PL MC: :
� EL
THE FOLLOWING CORRECTIONS ARE REQUIRED: ELR:
Inspector: i Dater ////
(PROVED _ DISAPPROVED /CALL FOR REINSP. CF CO
CITY OF TIGARD BUILDING INSPECTION NOTICE
Inspection Line: 639 -4175 Business Phone: 639 -4171
Footing Rain Drain Cover /Service FINA
Foundation Water Line Ceiling - Plumb.
Post/Beam Mech. Shear /Sheath Framing -Mech.
PIbg.Und /FIr /SlabC Plbg. Top Out ` Insulation - Elect.
Post/Beam Struct. Mech. Rough -in Gyp. Bd. -Bldg.
San. Sewer Gas Line Appr /Sdwlk Reins.
Other:
Date: /#'' 7 T / — q4, ` M P.m. G Entry: "
Address: J 5 7 7 J O d �tiY
Tenant: Ste: MST: 9t O 3 5/
/ (/ 2 7 7 7 / BUP:
Con /Own: b ( 5o MEP:
� PLC:
ELC:
THE FOLLOWING CORRECTIONS ARE REQUIRED: ELR:
Inspec Date //" 7 p(
APPROVED DISAPPROVED /CALL FOR REINSP. CF CO
Ids L 516(5
CITY OF TIGARD BUILDING INSPECTION NOTICE
Inspection Line: 639 -4175 Business Phone: 639 -4171
Footing Rain Drain Cover /Service ACP
Foundation Water Line Ceiling -Plume
Post/Beam Mech. Shear /Sheath Framing 41111P
PIbg.Und /FIr /Slab Plbg. Top Out Insulation :I Jl
Post/Beam Struct. Mech. Rough -in Gyp. Bd.r�`fi1►
San. Sewer Gas Line Appr /Sdwlk , ein .
Other: � Q
Date: ) lJ f ? A.M. P.M. �� - Ent y: 1 14 t
Address: / 1 13 7 1 3 g PT i n �r
Tenant: Ste: MST: 4 o3s
BUP:
Con /Own: MEC:
PLM:
ELC:
THE FOLLOWING CORRECTIONS ARE REQUIRED: ELR:
/ iron.,'/ / ../20v /f?c.Z.7 D / / .7 %—
C 771 e Tiggr fee./Ai w/
*9 U/4 7 Cif/ ��/40 -c am
/i9i2 /.mac
AP/ 6' / - •
/xs.oS/ b i e iS�.
( up Jo .
i
Inspector: Date:
APPROVED DISAPPROVED /CALL FOR REINSP. CF CO
CITY OF TIGARD BUILDING INSPECTION NOTICE
\i Inspection Line: 639 -4175 Business Phone: 639 -4171
Footing Rain Drain Cover /Service AL:
Foundation Water Line Ceiling - Plumb.
Post/Beam Mech. Shear /Sheath Framing
PIbg.Und /FIr /Slab Plbg. Top Out Insulation - Elect.
Post/Beam Struct. Mech. Rough -in Gyp. Bd. Bldg..
San. Sewer Gas Line Appr /Sdwlk Reins.
Other: `
Date: �P ( ? 1 A.M. P.M. Entry:
Address: i i `
Tenant: Ste: MST: ( 7 ' ' d 33
BUP:
Con /Own: MEC:
PLM:
ELC:
THE FOLLOWING CORRECTIONS ARE REQUIRED: ELR:
/1.a ae/i //s
q,'' /STEP'S FA-7 -t iai1
.Z' / /oiH/ • Gva�o / " ar"Ko .9D1f'
SrE .4 7710..G r avice,e 16"
/S'I /7' / 6 - OM /.porC'2 /a/c 37e"
4 // Z e l/4, / "oBave
401P
Inspector: • .41 Date: 2 / C6197
_APPROVED 1.-P1fg APPROVED /CALL FOR REINSP. CF CO
CITY OF TIGARD BUILDING INSPECTION NOTIC -
' Inspection Line: 639 -4175 Business Phone: 639- Awl"
Footing Rain Drain Cover /Service INAL:
Foundation Water Line Ceiling - Plumb.
ost/Beam Me . Shear /Sheath Framing ech:
g.Und /Flr /Slab Plbg. Top Out Insulation - Elect.
ost/Beam Struct. Mech. Rough -in Gyp. Bd.
Gas Line Appr /Sdwlk eins
Other: AI_ii ! . : Al •!'1 -6— r
'7 i
Date: • i / A.M. P.M. Entry: ` j
Address:
Tenant: / Ste: MST: do c2 "S(
6
Con /Own: L( ¶-96 M EC:
PLM:
ELC:
THE FOLLOWING CORRECTIONS ARE REQUIRED: ELR:
(24. S � f/'-e 4 /e,,
ii
1..
Inspector: Date: 3 40f ' '17
LitcrrIRCED DISAPPROVED /CALL FOR REINSP. CF CO
Ott
i
1 /741e/a4e 1,-4.--f \ P
CITY OF TIGARD BUILDING INSPECTION NOTICE
Inspection Line: 639 -4175 Business P • • • -. - •-4171
Footing Rain Drain Cover /Servic- FINAL:
Foundation Water Line Ceiling - Plumb.
Post/Beam Mech. Shear /Sheath Framin -Mech.
PIbg.Und /FIr /Slab _•Ibg. Top Ou Insulation - Elect.
Post/Beam Struct. 4 ech. Rou • •• Gyp. Bd. -Bldg.
S._.—
San. Sewer tRo Appr /Sdwlk Reins.
Other: r ,,t p �dt Q....._, Date: / / Entry:
/ 4-
Address: / 7 7 n K
Tenant: // '� pp QQ Ste: MST:�4 0
BUP:
Con /Own:
C9 ` - " k (eu MEC:
PLM:
ELC:
THE FOLLOWING CORRECTIONS ARE REQUIRED: ELR:
, / 71 Ctk Liar. St v PW A_ -- A...". -•,?alc
//� 1/ (/ ,c,lg T r -S7j
0 4:cifter..erc j a - i-or 6 - 0 0 / Z - t4...erc -4 7
.7 A cefr, 7-6 -kr'e" 4t-<i Vv,,c et- c p v Cyr, ,
z'eA T 3•00 . e l ej • d l R
I `0/ " CCG , .. ItsGI., (/ 0344 - ,) /2/Ca ✓/mi
s�Ec 5 A ,r e7/ CA A 1 G er.�c,d l
_„..- of
Inspector: ' ,X -- Date// //f
APPROVED ISAPPROVED /CALL FOR REINSP. CF C&
CITY OF TIGARD BUILDING INSPECTION NOTICE
Inspection Line: 639 -4175 Business Phone: 639 -4171
Footing Rain Drain Cover /Service FINAL:
Foundation Water Line Ceiling - Plumb.
Post/Beam Mech. Shear /Sheath Framing -Mech.
PIbg.Und /Flr /Slab Plbg. Top Out Insulation - Elect.
Post/Beam Struct. Mech. ough -in Gyp. Bd. -Bldg.
San. Sewer 4 Appr /Sdwlk Reins.
Other: I � k '4
Date: // 1 1 G q ` / e A.M. P.M. Entry:
Address: l 4 1 1 3 7 7 YE? Z
Tenant: Ste: MST: "o.3S (
Q p BUP:
Con /Own:
/ [ — D 7 I MEC:
PLM:
ELC:
THE FOLLOWING CORRECTIONS ARE REQUIRED: ELR:
WiFf
,Inspec a ' Dat /'�07 ° ?f
APPROVED _ DISAPPROVED /CALL FOR REINSP. CF CO
CITY OF TIGARD BUILDING INSPECTION NOTICE
Inspection Line: 639 -4175 Business Phone: 639 -4171
Footing Rain Drain Cover /Service FINAL:
Foundation Water Line Ceiling - Plumb.
Post/Beam Mech. Shear /Sheath Framing -Mech.
PIbg.Und /Flr /Slab Plbg. Top Out Insulation - Elect.
Post/Beam Struct. Mech. Rough -in Gyp. Bd. -Bldg.
San. Sewer Gas Line �� Reins.
Other:
Date. — _ A.M. ��' PP.M. ntry:
A.
Address: 7 n Y 9 v� i
Tenant: Ste: MST: 74 0 357
BUP:
Con /Own: MEC:
PLM:
ELC:
THE FOLLOWING CORRECTIONS ARE REQUIRED: ELR:
VI Fe N moo, -
Q
Inspector: Date: 1Z -
PPROVED DISAPPROVED /CALL FOR REINSP. CF CO