Loading...
Report R t�I6�Zoi o -- a6�� NEUDORFER ENGINEERS INC. TEST, ADJUST & BALANCE BALANCE REPORT Ultimate Electronics Tigard, Oregon 2010 -670 Project Completion Date: 10/15/10 Revision Date: Revision Number: or tl •%t�e t sp. s i Reef 4' de PLEZIO .'i' co ,„ — ...... WIWA1A C NEUDCRFER MIKE VAUNTER, RE, I CERTIFICATION CERT1FiCAiTION 245 3414 Exp. 3131 Ji 1 Exp. 3131111 cn Cir CP' MAC S`i 5516 1' Ave S 1500 NE Sandy Boulevard, Suite #1 Seattle, WA 98108 Portland, OR 97232 Phone (206) 621 -1810 Phone (503) 235 -8924 Fax (206) 343 -9820 Fax (503) 235 -8925 NEUDORFER ENGINEERS, INC. Consulting Engineers 5516 1 Avenue South Seattle, Washington 98108 (206) 621 -1810 Fax (206) 343 -9820 PROJECT Ultimate Electronics LOCATION Tigard, Oregon AIR BALANCING SUMMARY This project has been balanced per plans and specifications using the National Environmental Balancing Bureau (NEBB) standards and procedures. The fans have been checked for fan data, operating amperage, volta e, rotation, RPM, P 9 9 I belt tension, alignment, and operating static pressure. All outlets have been proportioned to ± 10% of the percentage of total airflow of the system unless otherwise noted. RTU -1 There are no volume dampers for the four plenum diffusers to move air to outlet #5 which supplies the vestibule. RTUs -2,3,4 Are typical Units supplying the main Warehouse and meeting design requirements. RTU -5 Is running at Full Load Amps and producing 89% of design. Not all branches have volume dampers, however it does match the drawings. The system was proportioned as well as possible. RTU -6,7,8 Are all meeting design specifications. EF -1 -5 Are all Direct Drive fans with rheostat speed control. Fan speeds are set as close as possible to design. I