Report R
t�I6�Zoi o -- a6��
NEUDORFER ENGINEERS INC.
TEST, ADJUST & BALANCE
BALANCE REPORT
Ultimate Electronics
Tigard, Oregon
2010 -670
Project Completion Date: 10/15/10
Revision Date: Revision Number:
or tl •%t�e t sp. s i Reef
4'
de PLEZIO .'i' co ,„ — ......
WIWA1A C NEUDCRFER MIKE VAUNTER, RE, I
CERTIFICATION CERT1FiCAiTION
245 3414
Exp. 3131 Ji 1 Exp. 3131111
cn
Cir
CP' MAC
S`i
5516 1' Ave S 1500 NE Sandy Boulevard, Suite #1
Seattle, WA 98108 Portland, OR 97232
Phone (206) 621 -1810 Phone (503) 235 -8924
Fax (206) 343 -9820 Fax (503) 235 -8925
NEUDORFER ENGINEERS, INC.
Consulting Engineers
5516 1 Avenue South
Seattle, Washington 98108
(206) 621 -1810 Fax (206) 343 -9820
PROJECT Ultimate Electronics
LOCATION Tigard, Oregon
AIR BALANCING SUMMARY
This project has been balanced per plans and specifications using the National
Environmental Balancing Bureau (NEBB) standards and procedures.
The fans have been checked for fan data, operating amperage, volta e, rotation, RPM,
P 9 9
I belt tension, alignment, and operating static pressure. All outlets have been proportioned
to ± 10% of the percentage of total airflow of the system unless otherwise noted.
RTU -1 There are no volume dampers for the four plenum diffusers to move air to outlet
#5 which supplies the vestibule.
RTUs -2,3,4 Are typical Units supplying the main Warehouse and meeting design
requirements.
RTU -5 Is running at Full Load Amps and producing 89% of design. Not all branches have
volume dampers, however it does match the drawings. The system was proportioned as
well as possible.
RTU -6,7,8 Are all meeting design specifications.
EF -1 -5 Are all Direct Drive fans with rheostat speed control. Fan speeds are set as close
as possible to design.