2004-121227 Washington County,Oregon 2004.121227
RETUR'' QECORDED DOCUMENT TO: 101' 104 11:01:04 AM
Re s Department D+ Cnt=1 stn=21 RECORD81
City of Tigard $30.00$6.00$11.00•Total=$47.00
13125 SW Hall Blvd
/// Tigard, OR 97223
I
� Assessment
e
I,JeryHanson,DirecorrofAesOm nt`2d700ation
and Ex-Otflclo County Clerk for Washington County, 7
Oregon,do hereby certify that the withinInstrument of
writing was recelved and recorded In the book of
records of said county. sAr
Jerry R.Hanson,Director seessment and Taxation, _
Ex-Offlclo County Clerk
CITY OF TIGARD
13125 SW Hall Blvd.
Tigard, OR 97223
COVER PAGE FOR RECORDING
Name of Transaction: Finalizing of Reimbursement District No. 26 — SW
121St South of Rose Vista Drive
Name of Person(s), Address, and Map and Tax Lot Identification:
Owner " Tax Lot Site Address
Summers, Joseph & Beverle 2S 103CCO2300 13870 SW 121 St Avenue,
Palen, Robert & Denise 2S103CCO2400 13910 SW 121St Avenue
Simon, Maria & Ioan 2S I03CCO2500 13950 SW 121St Avenue;
To be recorded in Deed Records per.Tigard Municipal Code 13.09.
Cover Page for Recording - 1 of 1
Name of Transaction: Finalizing of Reimbursement District No. 26— 121St Avenue South
of Rose Vista Drive
Name of Person(s), Tax Lot Identification and Address.
iii
2004 121227 CITY OF TIGARD, OREGON
RESOLUTION NO. 04-SPS
A RESOLUTION FINALIZING SANITARY SEWER REIMBURSEMENT DISTRICT NO. 26 (121sT
AVENUE SOUTH OF ROSE VISTA DRIVE)
WHEREAS, on June 25, 2002, the City Council approved Resolution No. 02-43 to form Sanitary Sewer
Reimbursement District No. 26 to construct sewers in SW 121" Avenue in accordance with TMC Chapter
13.09; and
WHEREAS, Resolution No. 02-43 included the City Engineer's Report, which contained an estimated
construction cost and total project cost; and
WHEREAS, construction of the sewer improvements have been completed, final costs have been
determined, and the City Engineer's Report has been revised to include the final costs as required by TMC
13.09.105(1); and
WHEREAS, these property owners have been notified of an informational hearing in accordance with TMC
13.09.060 and an informational hearing was conducted in accordance with TMC 13.09.105; and
WHEREAS, the City Council has determined that the proposed revisions to the City Engineer's Report are
appropriate.
NOW,THEREFORE,BE IT RESOLVED by the Tigard City Council that:
SECTION 1 The revised City Engineer's report titled "Sanitary Sewer Reimbursement District No.
26", attached hereto as Exhibit A,is hereby approved.
SECTION 2 Resolution No. 02-43 is hereby amended to add the revised City Engineer's Report.
SECTION 3 The City Recorder shall cause a copy of this resolution to be filed in the office of the
County Recorder and shall mail a copy of this resolution to all affected property owners
at their last known address.
SECTION 4 This resolution is effective upon passage.
PASSED: This �� day of�LJ 8� 2004.
Mayo - City of Tigard
ATTEST:
Certified to be a True-Copy of R�y�� ►d`�-�'�
Original on File
J ie McGarvin, Deputy City Recorder
D67uty R
ecorder- City of Tigard
Date:,
RESOLUTION NO. 04-(0 P
Page 1
. .. • . j IIIIIII�IIIIIIIIIIII VIII III
2004-121227
Exhibit A
City Engineer's Report
Sanitary Sewer Reimbursement District No. 26
(SW 121 st Av. South of Rose Vista)
Background
This project was constructed through a reimbursement district approved by City
Council on June 25, 2002, through Resolution No. 02-43 and funded under the
City of Tigard Neighborhood Sewer Extension Program (NSEP). Under the
program, the City of Tigard has installed public sewers to each lot within the
project area. At the time the property owner connects to the sewer, the owner
must pay a connection fee of $2,535.00 and reimburse the City for a fair share of
the cost of the public sewer. There is no requirement to connect to the sewer or
pay any fee until connection is made. In addition, property owners are
responsible for disconnecting their existing septic system according to
Washington County rules and for any other modifications necessary to connect
to the public sewer.
Project Area - Zone of Benefit
An existing sanitary sewer line in SW Gaarde Street was extended north to serve
three lots on the east side of SW 121st Avenue as shown on Exhibit Map B.
Cost
The final cost for the sanitary sewer construction is $36,776.51. Engineering and
inspection fees amount to $4,964.83 (13.5%) as defined in TMC 13.09.040(1).
The final total project cost is $41,741.34. This is the amount that should be
reimbursed to the sanitary sewer fund as properties connect .to. the sewer and
pay their fair share of the total amount. However, the actual amount that each
property owner pays is subject to the City's incentive program for early
connections.
In addition to sharing the cost of the public sewer line, each property owner will
be required to pay an additional $2,535 connection and inspection fee when
connection to the public line is made. All owners will be responsible for all
plumbing costs required for work done on private property.
Final Engineer's Report
Sanitary Sewer Reimbursement District No. 26 Page 1 of 3
. . . li I I I II I{I II II I I II 1 I II I II III
2004-121227
Reimbursement Rate
The resolution forming this district, Resolution No. 02-43, provides that the total
cost of the project will be divided equally among the three properties included in
the reimbursement district.
Resolution 01-46 limits this fee to $6,000 to the extent that it does not exceed
$15,000 per owner for connections completed within three years of final approval
of the City Engineer's Report. Resolution 03-55 further provides that payment of
the portion of the fee in excess of $15,000 may be deferred until the lot is
partitioned or otherwise developed.
Each property owner's estimated fair share of the public sewer line is
$13,913.78. Each owner's fair share would be limited to $6,000 to the
extent that it does not exceed $15,000, for connections completed within
three years of City Council approval of the final City Engineer's Report
following construction in accordance with Resolution 01-46 (attached). In
addition to paying for the first $6,000, owners will remain responsible for
paying all actual costs that exceed $15,000. However, payment of the
portion of the fee in excess of $15,000 may be deferred until the lot is
partitioned or otherwise developed in accordance with Resolution 03-55
(attached).
Annual Fee Adiustment
TMC 13.09.115 states that an annual percentage rate shall be applied to each
property owner's fair share of the sewer line costs on the anniversary date of the
reimbursement agreement. The Finance Director has set the annual interest
rate at 6.05% as stated in City of Tigard Resolution No. 98-22.
Recommendation
It is recommended that the reimbursement district formed under Resolution No.
02-43 be finalized in the amount of $41,741.34 with an annual fee increase as
indicated above and that the reimbursement district continue for fifteen years
from the date of the formation of the district as provided in the Tigard Municipal
Code (TMC) 13.09.110(5). Fifteen years after the formation of the
reimbursement district, properties connecting to the sewer would no longer be
required to pay the reimbursement fee.
Submitted September 14, 2004
Au tin P. Duenas, P.E.
Ci ngineer
is\eng\2003-2004 ty cip\121st ave ss dist no 26\1inalkepon fmal.doc
Final Engineer's Report
Sanitary Sewer Reimbursement District No. 26 Page 2 of 3
�• �i���lllIIIIIIIIIIII I��I�II� 21 ST AVE AT GAARDE ST
2pp4_121227 -Reimbursement District No. 26
Final Cost to Property Owners
August 13,2004
FINAL COST
OWNER SITE ADDRESS TAX LOT ID AREA(S.F.) TO PAID BY PAID BY CITY
PROPERTY OWNER
OWNER
1 SUMMERS JOSEPH RAMSEY&BEVERLE 13870 SW 121 ST AVE 2S103CCO2300 14452.62808 $13,913.78 $6,000.00 $7,913.78
2 PALEN ROBERT L&DENISE 13910 SW 121ST AVE 2S103CCO2400 14773.89238 $13,913.78 $6,000.00 $7,913.78
3 SIMON MARIA&IOAN 13950 SW 121 STAVE 2S103CCO2500 14809.64262 $13,913.78 $6,000.00 $7,913.78
Totals 44036.16 $41,741.34 $18,000.00 $23,741.34
Final Engineer's Report
Sanitary Sewer Reimbursement District No.26 Page 3 of 3
121ST AVE SOUTH OF ROSE VISTA ®RIVE
SANITARY SEWER IMPROVEMENTS
REIMBURSEMENT DISTRICT *26
ROSE VISTA DR
N
SUMMERS JOSEPH
& BEVERLE
13B70 121ST AVE
2S103CCO2300
� ao
h N
ARIEL DR Q
Q a��NLi
(n >
a~ >a Fo
coi W =
N z v �—
v oono0 00
:2-0)--d r--
V1 :2 N �---
GAARDE ST
GAARDE ST
w
a
AMES LN N
F
I
N
N
N
J
EXHIBIT B