Report 8/16/00 Activities for Case #: MST2000- 00177
•
2:57:48 PM �, .
,
Assigned Hold Updated r . r7
Activity Description Date 1 Date 2 , Date 3 To Done By Disp. Level, By ' Updated Notes
MSTA005 Application received 6/8/00 GEO RECD No Hold , DEB 6/18/00 It
MSTA008 Permit Created • 6/18/00 DEB DONE No Hold DEB . 6/18/00 Delay in creating due to
. understaff'ing.
MSTA010 Check for prcl. restrict. 6/18/00 DEB DONE No Hold DEB 6/18/00
MSTA012 Plans routed to Plans Examiner 6/18/00 DEB DONE . • No Hold DEB 6/18/00
MSTA026 Plans approved by Pln Examiner • . 6/20/00 BT2 DONE No Hold BT2 6/20/00
MSTA030 Reviewed plans routed to DSTS • 6/20/00 BT2 DONE No Hold BT2 6/20/00
MSTA700 Erosion 844 -8444 No Hold BT2 6/20/00 .
MSTA705 Footing Insp 6 /30 /00 KBS PASS No Hold KBS 6/30/00 #-1- initial erosion control app
- #-2- ufer rod tag •
MSTA706 Foundation Insp • 7/3/00 I-lAP PASS No Hold HAP 7/3/00
MSTA710 Post/Beam Structural 7/13/00 KBS PASS No Hold KBS 7/13/00 #-1- add post under beam
. adjacent to rim
MSTA711 Post/Beam Mechanical . . 7/13/00 KBS • PASS No Hold KBS 7/13/00 h
. MSTA712 Underfloor insulation No Hold BT2 6/20/00
MSTA713 Crawl Drain /Backwater valve • 7/7/00 • MRS . PASS No. Hold MRS 7/7/00 ' .
MSTA712 Underfloor insulation No Hold BT2 6/20/00 •
MSTA714 Footing /Foundation Drain No Hold BT2 6/20/00- - • .
MSTA720 Mechanical Insp No Hold BT2 6/20/00 "b" vent for water. heater
•
MSTA720 Mechanical Insp _ - No Hold BT2 6/20/00
MSTA722 Plumb Top Out 8/9/00 TLP PASS No Hold TLP 8/9/00 • MSTA•23 Electrical Service _ No Hold BT2 6/20/00
MSTA724 Electrical Rough In
No Hold BT2 6/20/00
MSTA725 Framing lnsp -
No Hold. BT2 6/20/00
MSTA728 Low Voltage No Hold BT2 6/20/00 '
MSTA735 Gas Line Insp . No Hold BT2. 6/20/00
MSTA736 Gas Fireplace
No Hold BT2 '6/20/00
MSTA740 Insulation Insp - No Hold BT2 6/20/00 ,, •
MSTA752 Rain drain lnsp 7/7/00 MRS PASS No Hold MRS 7/7/00
• MSTA760 Water Line lnsp - 7/7/00 MRS PASS No Hold MRS 7/7/00
MSTA765 Appr /Sdwlk Insp .
No Hold BT2 - 6/20/00 1
MSTA790 Electrical Final No Hold BT2 6/20/00 V
MSTA795 Mechanical Final No Hold BT2 6/20/00
Page 1 of 2 .
8/16/00 Activities for Case #: MST2000 -00177
2:57:48 PM
•
Assigned Hold Updated . ' r
Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes
MSTA797 Plumb Final No Hold BT2 6/20/00 1
MSTA798 Final inspection No Hold BT2 6/20/00
MSTA799 Building Final No Hold BT2 6/20/00
DST Post - Review Completed •
MSTA032 P 6/27/00 DLH DONE No Hold DST 6/27/00
MSTA080 (F) Ready to issue 6/27/00 DLH DONE No Hold DST 6/27/00
MSTA092 (F) Issue combination permit 6/28/00 DST DONE No Hold DST 6/28/00
MSTA095 Issue plumbing signature form 6/28/00 JMT RECD No Hold JMT 6/28/00
MSTA097 Issue electric signature form 6/30/00 JMT RECD No Hold JMT 7/10/00
MSTA093 (F) Reprint Permit 7/13/00 HAP DONE No Hold HAP 7/13/00
MSTA726 Shear Wall Insp 8/1/00 PASS No Hold RDP 8/2/00
MSTA093 (F) Reprint Permit 8/9/00 ZZZ DONE No Hold ZZZ 8/9/00
•
1
1, ' ,
Page 2 of 2