Loading...
Report 8/16/00 Activities for Case #: MST2000 -00224 3:42:24 PM Assigned Hold Updated , Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes 'N MSTA005 Application received 6/30/00 GEO RECD No Hold BLD 7/14/00 MSTA008 Permit Created 7/14/00 DLH DONE No Hold BLD 7/14/00 r4 MSTA010 Check for prcl. restrict. 7/14/00 DLH DONE No Hold BLD 7/14/00 t'^ MSTA012 Plans routed to Plans Examiner 7/14/00 DLH DONE No Hold BLD 7/14/00 MSTA026 Plans approved by Pln Examiner 7/20/00 BT2 DONE No Hold BT2 7/20/00 MSTA030 Reviewed plans routed to DSTS 7/20/00 BT2 DONE No Hold BT2 7/20/00 MSTA700 Erosion 844 -8444 No Hold BT2 7/20/00 MSTA704 Sewer Inspection No Hold RB 8/2/00 Passed 8 -2 -00 (RB) MSTA705 Footing Insp 7/28/00 HAP PASS No Hold HAP 7/28/00 Erosion control OK, Ufer tagged MSTA706 Foundation Insp 7/31/00 HAP PASS No Hold HAP 7/31/00 MSTA710 Post/Beam Structural 8/9/00 TLP PASS No Hold TLP 8/9/00 MSTA711 Post/Beam Mechanical 8/9/00 TLP PASS No Hold TLP 8/9/00 MSTA712 Underfloor insulation No Hold BT2 7/20/00 MSTA713 Crawl Drain /Backwater valve 8/2/00 RB PASS No Hold RB 8/2/00 MSTA714 Footing /Foundation Drain No Hold BT2 7/20/00 MSTA717 PLM /Underfloor 8/8/00 MRS FAIL No Hold MRS 8/8/00 called for a 1" supply to first tee MSTA720 Mechanical Insp No Hold BT2 7/20/00 "B" VENT for water heater MSTA720 Mechanical Insp No Hold BT2 7/20/00 MSTA722 Plumb Top Out No Hold BT2 7/20/00 MSTA723 Electrical Service No Hold BT2 7/20/00 MSTA724 Electrical Rough In No Hold BT2 7/20/00 MSTA725 Framing Insp No Hold BT2 7/20/00 , MSTA726 Shear Wall Insp No Hold BT2 7/20/00 MSTA727 Exterior Sheathing Insp No Hold BT2 7/20/00 MSTA728 Low Voltage No Hold BT2 7/20/00 . MSTA735 Gas Line Insp 1' No Hold BT2 7/20/00 • MSTA736 Gas Fireplace No Hold BT2 7/20/00 , MSTA740 Insulation Insp No Hold BT2 7/20/00 ° MSTA752 Rain drain Insp 8/2/00 RB PASS No Hold RB 8/2/00 MSTA760 Water Line lnsp 8/2/00 RB PASS No Hold RB 8/2/00 24 -inch depth required. . MSTA765 Appr /Sdwlk lnsp • No Hold BT2 7/20/00 Page 1 of 2 , 8/16/00 Activities for Case #: MST2000-00224 3:42:24 PM . , . . . , . . , . . ■ . •l Assigned ' . Hold Updated 7; Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes r 1 msTA790 Electrical Final • No Hold BT2 _7/20/00 . -• ,A MSTA795 Mechanical Final , . No Hold BT2 7/20/00 msTA797 Plumb Final No Hold BT2 7/20/00 ' 0 msTA798 Final inspection . No Hold BT2 7/20/00 • MSTA799 Building Final • No Hold BT2 7/20/00 . - MSTA032 DST Post-Review Completed • 7/26/00 GWL DONE No Hold GWL 7/26/00 MSTA080 (F) Ready to issue _ 7/26/00 GWL DONE No Hold GWL 7/26/00 MSTA092 (F) Issue combination permit 7/27/00 DLH DONE No Hold BLD 7/27/00 msTA095 Issue plumbing signature form • 7/27/00 JMT RECD No Hold JMT 7/28/00 msTA097 Issue electric signature form. 8/4/00 JMT RECD No Hold JMT 8/7/00 MST/,1717 PLM/Underfloor • • 8/7/00 - _ WA FAIL No Hold AMS 8/8/00 1. Extend 1" cold water to dividing tee to upstairs fixtures. " 2. Support pcx pipe as per - manufacturers installation - - . standards every 32" . . 3. Insulate cold water in . • unheated area in crawl area. . . 4. No plan located on jobsite. MSTA093 (F) Reprint Permit 8/9/00 ZZZ DONE - No Hold ZZZ 8/9/00 jvi sme PLIVI/Underfloor • 8/9/00 TLP PASS No Hold TLP 8/9/00 • . . • . . - ' . . • . ..:./ , . . 4, _ . 0 . rl . .. • , . v a . . • . ., • . - . • . • . , . . Page 2 of 2 . , . , . .