Report at
h � Information
t# .ToBuild' On
Engineering • Consulting • Testing
December 15, 2009
•
Frank Johnson
SD Deacon
901 NE Glisan Street
Portland, Oregon 97232
Subject: Final Summary Report
13333 SW 68 Parkway, Tigard, Oregon
PSI Report No. 702- 90237 -17
Dear Mr. Johnson:
Professional Service Industries, Inc. (PSI) is writing this letter to document that, in accordance with Section
1704.1.2 of the State Building Code representative(s) from our firm have performed special inspection during
construction for the following project:
Permit No: BUP 2009 -00091
Project Address: 13333 SW 68 Parkway, Tigard, Oregon
Project Description: Triangle Point -- Phase 1 Building and Site Improvements
Our project file(s) indicate that PSI. Special Inspection(s) activities listed below were conducted as scheduled from
August 13, 2009 through October 29, 2009. This letter represents a summary of work observed and reported by PSI
representative(s) and the resolution of any documented noncompliance.
• Structural Fill Compaction
• Reinforced Concrete
• Adhesive Anchors .
• Structural Steel: Shop Fabrication and Field Erection
•
To the best of our knowledge, the special inspections referenced herein were performed by our firm in general
accordance with the requirements, approved plans and specifications, provided change orders that impacted plans
and /or specifications, and applicable workmanship provisions of the State Building Code and Standards.
•
•
If you have any questions or we can be of further assistance, please do not hesitate to call.
Sincerely,
Profess n ervice Industries, Inc.
Jay Hathaway
Technical Director..
Construction Services
•
•
Professional Service Industries, Inc. • 8032 North Cutter Circle, Suite 480 • Portland, OR 97217 • Phone 603/289.1778 • Fax 603/289 -1918
CCB# 178289