Report Fax :5032232630 Oct 30 '98 14 32 P. 02 •'�- = AseIRp �.. ar I soTestin O. Bax 3sta ��chmice , and o 4080 HUW,lsu 3 Ave., NE Inc. • �� Ph 684-3460 F AX ( 8 4 Salem 0 97301 Pibt1R (a 03' S92•1262 FAX ( 3) 3861308 October 21, 1894 CTI #98-G1767 GFC General Contracting 17017 Cana/ Circle Lake Oswego, OR 97035 DI8CUS8IO111 OF LIQUEFACTION POTENTIAL AND SOIL STRENGTH LOSS PACIFIC UTILITY TRAILER BUILDING ADDITION - HUNZIKER ROAD T1GARD, OREGON Pursuant to your request, an engineer from Carlson Testing, Inc. (CTII has reviewed the .;it and proposed construction with regards to reviewing the dynamic soil response during seis ni events. The proposed construction is a single -story, steel framed bu ?din with thickened 9 h a concr Slab-on-grade, hickened footings around three sides, and a Sto 9 foot tall cantilever concret) retaining wall along the back side. • The primary purpose of this letter is to address the soil liquefaction hazard, its potert:ie I detrimental effects on the structure, end to present recommended mitigating measures. - "h 3 site is underlain by fine - grained slit soils classified as ancient flood deposits (Off). Based 011 the DOGAMI Open File Report No. 0 -90 -2, the site is underlain by about 60 feet of Off ave 400 feet of very stiff undifferentiated Iacustrine sediments over basement rock coneietin(i of Columbia River Basalt. Rased on our extensive experience with nearby sites containing ancient flood deposits, the Off has a high potential for liquefaction generally at a depth of about 10 to 20 feet below original grade during a very large seismic event (0.34g PGA fen en event recurrence interval every one thousand years ova 5% chance of occurrence in next 51 years). For the code required design event which has PGA of 0.249 and a recurrence irate, ve I of every 500 years or a 10% chance of occurrence in the next 50 years, the potential for damaging liquefaction is only considered low to moderate. If liquefaction should occur, we do not expect a significant loss of bearing strength within tho Zone of influence beneath the spread foundations, nor do we expect that significant lat:irg 1 spreading would occur. Seismic induced settlement is estimated to range between one to three inches. Given the type of structure, although the estimated settlements could ca 3si3 significant damage to the structure, the effective hazard to occupants is considered minis eel. To mitigate seismic induced settlement, after performing deep subsurface explorations, auc'ar cast piles could be drilled to a depth below any expected liquefiable layers. This wouh mitigate settlement below the foundations, but not beneath the stab - grade. The projec tee) extra costs for design and construction are estimated to be between 430,000 to $50,0 70. The decision to mitigate against liquefaction is the responsibility of ti owner. • • Fax :5032232630 . Oct 30 '98 14 33 P. 03 #98 - 01757 Page .2of2 This letter is based on our best understanding of the types of deposits at the site and state .01- the-art evaluation of dynamic behaviors of silts. No deep detailed investigations v er a performed specifically at the site. Information contained" herein is not to be reproduced, except in full, without prior authorization from this office. if there ere any further questions; regarding seismic hazards, please do not hesitate to contact this office. Respec • I fitted, s -0 .. 14743 /` .. OREGON v 4 • 23 ��� F, '°IF �. 1@f►��� James D. Im •rie, P.E.; C.E.G. Principal Engineer Main Office Branch Office P.O. Box 23814 4060 Hudson Ave., NE Tigard, Oregon 97281 Salem, OR 97301 Carlson Testing, Inc. Phone (503) 684 -3460 Phone (503) 589 -1252 FAX (503) 684 -0954 FAX (503) 589 -1309 September 10, 1998 CTI #98 -G1757 GFC General Contracting 17017 Canal Circle Lake Oswego, OR 97035 GEOTECHNICAL REVIEW FOR RETAINING WALL CONSTRUCTION PACIFIC UTILITY TRAILER BUILDING ADDITION - HUNZIKER ROAD • "- TIGARD, OREGON Pursuant to your request, an engineer from Carlson Testing, Inc. (CTI) has visited the above referenced building addition with regards to reviewing the soil conditions for the proposed { ' S A construction of a 6 to 9 foot tall cantilever concrete retaining wall that will be a part of the warehouse -type building wall on the east end of the property. The purpose of our review was to note the soil conditions and provide recommendations for design of this new wall. The existing soil conditions exposed in the cut were fine grained flood deposits (brown SILT) that are typical of the Portland area. The central portion of the cut was wet and has softened because the silt has no clay and the groundwater seepage is causing the soil grains to essentially float. We recommend that the center 75 feet be overexcavated a depth of 2 feet and backfilled immediately with one foot of 1 crushed drain rock and one foot 11/2"-0 crushed "4- aggregate base rock compacted to at least 90 percent of the modified Proctor maximum dry density. Replacement with compacted gravel should be performed quickly so that the weight of the gravel is in place before the soil is allowed to soften. Once the overexcavation work is performed, the allowable bearing at the base of the wall is 2,000 Ib /ft The equivalent -fluid active pressure for a well drained wall is estimated at 55 Ib /ft G o The coefficient of friction between soil and concrete may be taken as 0.35; however we (^ 'i suggested placing at least a 4 -inch thick layer of lightly compacted 1 %2 " - crushed aggregate base over the subgrade even in areas not recommended for overexcavation. This should improve the coefficient of friction to at least 0.48. Passive resistance may be assumed at 300 Ib /ft Information contained herein is not to be reproduced, except in full, without prior authorization ..: from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. � �Ep PROF Respectfully submitted, � F- SS . ; CARLSON TESTING, INC. �5 �iGI �o ,� `4y • �� 14743 9 < • 4� OREGON • James D. Imbrie, P.E., C. e. v.Q g0 Principal Engineer vq 23• \c5 � _ I FS D. t•B` EX- 3a -