Specifications COM check Software Version 3.8.0
i rd lY
Mecha Comp Certificate
2006 IECC
Section 1: Project Information
Project Type: New Construction
Project Title : Verizon - Washington Square Mall
Construction Site: Owner /Agent: Designer /Contractor:
9585 SW Washington Rd
Space T19
Tigard, OR 97223
Section 2: General Information
Building Location (for weather data): Tigard, Oregon
Climate Zone: 4c
Section 3: Mechanical Systems List
Quantity System Type & Description
1 AHU -1 (ETR): Heating: Other, Electric, Capacity 34 kBtu /h / Cooling: Hydronic Coil, Capacity 46 kBtu /h / Single
Zone
1 EWH -1 (ETR): Electric Instantaneous Water Heater, Capacity: 0 gallons, Efficiency: 0.98 EF
1 EWH -2 (NEW): Electric Instantaneous Water Heater, Capacity: 0 gallons, Efficiency: 0.98 EF
Section 4: Requirements Checklist
Requirements Specific To: AHU -1 (ETR) :
d i. Balancing and pressure test connections on all hydronic terminal devices
Requirements Specific To: EWH -1 (ETR) :
zr1. Electric Water Heater efficiency: 0.9 EF (44 SL, Btu /h (if > 12 kW))
d 2. Hot water system sized per manufacturer's sizing guide
E 3. First 8 ft of outlet piping is insulated
Requirements Specific To: EWH -2 (NEW) :
E'1. Electric Water Heater efficiency: 0.9 EF (44 SL, Btu /h (if > 12 kW))
Er2. Hot water system sized per manufacturer's sizing guide
2(3. First 8 ft of outlet piping is insulated
Generic Requirements: Must be met by all systems to which the requirement is applicable:
E9. Load calculations per ASHRAE Fundamentals
2(2 Plant equipment and system capacity no greater than needed to meet loads
D Exception: Standby equipment automatically off when primary system is operating
❑ Exception: Multiple units controlled to sequence operation as a function of load
0- Minimum one temperature control device per system
0 4. Minimum one humidity control device per installed humidification /dehumidification system—DP go
c1. Automatic Controls: Setback to 55 °F (heat) and 85 °F (cool); 7 -day clock,
2 -hour occupant override, 10 -hour backup
o Exception: Continuously operating zones
o Exception: 2 kW demand or less, submit calculations
Project Title: Verizon - Washington Square Mall Report date: 10/05/10
Data filename: J:\ Lenexa \Programs \U- Z\Verizon \1050000867 Verizon - Washington Square Mall - Portland - OR \000 \Energy \1050000867
COMcheck- 092310.cck Page 1 of 2
�6. Outside -air source for ventilation; system capable of reducing OSA to required minimum — i V- ADIJA M t N0 DC U
e . R-5 supply and return air duct insulation in unconditioned spaces
R -8 supply and return air duct insulation outside the building
R -8 insulation between ducts and the building exterior when ducts are part of a building assembly
LJ Exception: Ducts located within equipment
O Exception: Ducts with interior and exterior temperature difference not exceeding 15 °F.
Er8. Mechanical fasteners and sealants used to connect ducts and air distribution equipment
2(9. Ducts sealed - longitudinal seams on rigid ducts; transverse seams on all ducts;
UL 181A or 181B tapes and mastics
D 10.Hot water pipe insulation: 1 in. for pipes < =1.5 in. and 2 in. for pipes >1.5 in.
Chilled water /refrigerant/brine pipe insulation: 1 in. for pipes < =1.5 in. and 1.5 in. for pipes >1.5 in.
Steam pipe insulation: 1.5 in. for pipes < =1.5 in. and 3 in. for pipes >1.5 in. --D NI
❑ Exception: Piping within HVAC equipment.
❑ Exception: Fluid temperatures between 55 and 105 °F.
❑ Exception: Fluid not heated or cooled with renewable energy.
'Exception: Runouts <4 ft in length.
1 11.Operation and maintenance manual provided to building owner
2(12.Piping, insulated to 1/2 in. if nominal diameter of pipe is <1.5 in.;
Larger pipe insulated to 1 in. thickness
i 3.Lavatory faucet outlet temperatures in public restrooms limited to 110 °F (43 °C)
d14.Thermostatic controls have 5 °F deadband
❑ Exception: Thermostats requiring manual changeover between heating and cooling
❑ Exception: Special occupancy or special applications where wide temperature ranges are not acceptable and are approved by the
authority having jurisdiction.
d 15. Balancing devices provided in accordance with IMC (2006) 603.17
2(16.Motorized, automatic shutoff dampers required on exhaust and outdoor air supply openings
❑ Exception: Gravity dampers acceptable in buildings <3 stories
❑ Exception: Gravity dampers acceptable in systems with outside or exhaust air flow rates
less than 300 cfm where dampers are interlocked with fan
'17.Three -pipe systems not used
18. Exhaust air heat recovery included for systems 5,000 cfm or greater with
more than 70% outside air fraction or specifically exempted -' tJ'4
❑ Exception: Systems serving spaces that are not cooled and heated to <60 °F.
O Exception: Commercial kitchen hoods (grease) classified as Type 1 by NFPA 96.
• Exception: Systems exhausting toxic, flammable, paint, or corrosive fumes or dust.
0 Exception: Where the largest exhaust source is less than 75% of the design outdoor airflow.
❑ Exception: Systems requiring dehumidification that employ energy recovery in series with the cooling coil.
Section 5: Compliance Statement
Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans, specifications
and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 2006 IECC
requirements in COMcheck Version 3.8.0 and to comply with the mandat. requirements in the Requirements Checklist.
,5corr CmetilN(04.5, l / � �� � 1 . 10
Name - Title Si. ature Date
Project Title: Verizon- Washington Square Mall Report date: 10/05/10
Data filename: J:\ Lenexa \Programs \U- Z\Verizon \1050000867 Verizon - Washington Square Mall - Portland - OR \000 \Energy \1050000867
COMcheck- 092310.cck Page 2 of 2
COMcheck Software Version 3.8.0
Interior Lighting Compliance
Certificate ''' CE1VED
2006 IECC OCT 14 ?Odfl
Section 1: Project Information CITY OFTIGARD
BUILDING DIVISION
Project Type: New Construction
Project Title : Verizon - Washington Square Mall
Construction Site: Owner /Agent: Designer /Contractor:
9585 SW Washington Rd
•
Space T19
Tigard, OR 97223
Section 2: Interior Lighting and Power Calculation
A B C D
Area Category Floor Area Allowed Allowed Watts
(ft2) Watts / ft2 (B x C)
Retail 1708 1.5 2562
Allowance: Merchandise Display / Fix. ID: H 24(a) 1.6 38(b)
Allowance: Merchandise Display / Fix. ID: N 172(a) 1.6 275(b)
Allowance: Merchandise Display /Fix. ID: NC,NM,NS,NT 8(a) 1.6 - 13(b)
Total Allowed Watts = 2888
(a) Area claimed must not exceed the illuminated area permitted for this allowance type.
(b) Allowance is (B x C) or the actual wattage of the fixtures given in Section 2, whichever is less.
Section 3: Interior Lighting Fixture Schedule
A B C D E
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast Lamps/ # of Fixture (C X D)
Fixture Fixtures Watt.
Reta�l� 1708 s t.
�., .... (.._ Q_ ) �
Linear Fluorescent 1: CL,CSL,DL: 48" T8 32W / Electronic 2 8 63 504
Compact Fluorescent 1: F: Triple 4 -pin 32W / Electronic 1 29 29 841
HID 1: H: Ceramic Metal Halide 20W / Standard 3 3 68 204
HID 2: M: Other / Standard 1 2 29 58
Halogen 1: N: Halogen MR -16 35W 1 12 50 600
Halogen 2: NC,NM,NS,NT: Halogen MR -16 35W 1 7 50 350
Compact Fluorescent 2: Q: Triple 4 -pin 13W / Electronic 2 3 29 87
Linear Fluorescent 2: U: 36" T8 25W / Electronic 1 1 28 28
Total Proposed Watts = 2672
Section 4: Requirements Checklist
Lighting Wattage:
D 1. Total proposed watts must be less than or equal to total allowed watts.
Allowed Watts Proposed Watts Complies
2888 2672 YES
Controls, Switching, and Wiring:
u 2. Independent controls for each space (switch /occupancy sensor).
Exceptions:
Project Title: Verizon - Washington Square Mall Report date: 10/05/10
Data filename: J:\ Lenexa \Programs \U -Z \Verizon \1050000867 Verizon - Washington Square Mall - Portland - OR \000 \Energy \1050000867
COMcheck- 092310.cck Page 1 of 4
❑ Areas designated as security or emergency areas that must be continuously illuminated.
❑ Lighting in stairways or corridors that are elements of the means of egress.
❑ 3. Master switch at entry to hotel /motel guest room.
❑ 4. Individual dwelling units separately metered.
❑ 5. Each space required to have a manual control also allows for reducing the connected lighting Toad by at least 50 percent by either
controlling all luminaires, dual switching of altemate rows of luminaires, alternate luminaires, or altemate lamps, switching the middle
lamp luminaires independently of other lamps, or switching each luminaire or each lamp.
Exceptions:
❑ Only one luminaire in space.
❑ An occupant- sensing device controls the area.
❑ The area is a corridor, storeroom, restroom, public lobby or sleeping unit.
❑ Areas that use less than 0.6 Watts /sq.ft.
❑ 6. Automatic lighting shutoff control in buildings larger than 5,000 sq.ft.
Exceptions:
❑ Sleeping units, patient care areas; and spaces where automatic shutoff would endanger safety or security.
❑ 7. Photocell /astronomical time switch on exterior lights.
Exceptions:
❑ Lighting intended for 24 hour use.
❑ 8. Tandem wired one -lamp and three -lamp ballasted luminaires (No single -lamp ballasts).
Exceptions:
❑ Electronic high- frequency ballasts; Luminaires on emergency circuits or with no available pair.
i t d i s R O tt , t) W
Section 4: Compliance Statement
Compliance Statement: The proposed lighting design represented in this document is consistent with the building plans, specifications
and other calculations submitted with this permit application. The proposed lighting system has been designed to meet the 2006 IECC
requirements in COMcheck Version 3.8.0 and to comply with the mandatory requirements in the Requirements Checklist.
Mrkc re,rr j dec -icyI
Name - Title Signature C/ Date
�lesi� nom.
Project Title: Verizon - Washington Square Mall Report date: 10/05/10
Data filename: J:\ Lenexa\ Programs \U- Z \Verizon \1050000867 Verizon - Washington Square Mall - Portland - OR \000 \Energy \1050000867
COMcheck- 092310.cck Page 2 of 4