Loading...
Permit lit CITY OF TIGARD BUILDING PERMIT COMMUNITY DEVELOPMENT Permit #: BUP2010 00268 TIGARD 1'3125 SW Hall Blvd., Tigard OR 97223 503.718.2439 Date Issued: 12/10/2010 Parcel: 2S112DC00701 Jurisdiction: Tigard Site address: 15951 SW 72ND AVE Project: Miller Paint Subdivision: OREGON BUSINESS PARK III Lot: 38 Project Description: TI. 12/21/10, reprint to change contractor of record. 1/21/11, reprinted for increase in project valuation. Contractor: MATTHEW OLSON CONSTRUCTION Owner: PACIFIC REALTY ASSOCIATES 5320 SW DOVER LN 15350 SW SEQUOIA PKWY #300 . PORTLAND, OR 97225 PORTLAND, OR 97224 PHONE: 503 - 892 -0066 PHONE: 503 - 624 -6300 FAX: 503 - 892 -0067 FEES Specifics: Description Date Amount Type of Use: COM Permit Fee - Additions, Alterations, 12/10/2010 $1,287.15 Class of Work: ALT Demolition Dwelling Units: 0 12% State Surcharge - Building 12/10/2010 $154.46 Stories: 1 Height: 0 ft Plan Review 12/10/2010 $836.65 Bedrooms: 0 Bathrooms: 0 Plan Review - Fire Life Safety 12/10/2010 $514.86 Value: $140,000 Info Process /Archiving - Lg Sheet (over 01/21/2011 $4.00 11x17) Info Process /Archiving - Sm Sheet (up to 01/21/2011 $6.00 11x17) Floor Areas: Metro Const. Excise Tax - Commercial 01/21/2011 $168.00 Total Area: 0 Use Accessory Struct: 0 Building Permit - COM 01/21/2011 $60.40 12% State Surcharge - Building 01/21/2011 $7.25 Basement: 0 Plan Review - Building 01/21/2011 $39.26 Carport: 0 FLS Plan Review 01/21/2011 $24.16 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $3,102.19 Required: Required Items and Reports (Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit i • . •' -ct to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be don- n accordance with a. .roved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952 -101- 0010th ough OAR 952- 001 -01''. ' ou . -y obtain a copy of the rules or direct questions to OUNC by calling 503.232.19:7 or 1.800.3 . I Issu d By: /Oil / Permittee Signature: P Call 503.639.4175 by 7:00 a.m. for the next available insp‘ ction date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. CITY OF TIGARD BUILDING PERMIT COMMUNITY DEVELOPMENT Permit #: BUP2010 -00268 TIGARD 13125 SW Hall Blvd., Tigard OR 97223 503.718.2439 Date Issued: 12/10/2010 Parcel: 2S112DC00701 Jurisdiction: Tigard Site address: 15951 SW 72ND AVE Project: Miller Paint Subdivision: OREGON BUSINESS PARK III Lot: 38 Project Description: TI. 12/21/10, reprint to change contractor of record. Contractor: MATTHEW OLSON CONSTRUCTION Owner: PACIFIC REALTY ASSOCIATES 5320 SW DOVER LN 15350 SW SEQUOIA PKWY #300 PORTLAND, OR 97225 PORTLAND, OR 97224 PHONE: 503 - 892 -0066 PHONE: 503 - 624 -6300 FAX: 503 - 892 -0067 FEES Specifics: Description Date Amount Type of Use: COM Permit Fee - Additions, Alterations, 12/10/2010 $1,287.15 Class of Work: ALT Demolition Dwelling Units: 0 12% State Surcharge - Building 12/10/2010 $154.46 Stories: 1 Height: 0 ft Plan Review 12/10/2010 $836.65 Bedrooms: 0 Bathrooms: 0 Plan Review - Fire Life Safety 12/10/2010 $514.86 Value: $130,000 Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $2,793.12 Required: Required Items and Reports (Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, o if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Ce r' Those =s -. e set forth in OAR 952 -0 - 10 throug : :R 952 - 001 -0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.23 c or 1.800 2.2344. I sued By: r, I /' �" - ' Permittee Signature: Call 503.639.4175 by 7:00 a.m. for the next available i :.ectionr. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. , q OF TIGARD BUILDING PERMIT :..,. COMMUNITY DEVELOPMENT Permit #: BUP2010 -00268 13 125 SW Hall Blvd., Tigard OR 97223 503.718.2439 Date Issued: 12/10/2010 •T1 . .- Parcel: 2S112DC00701 Jurisdiction: Tigard Site address: 15951 SW 72ND AVE Project: Miller Paint Subdivision: OREGON BUSINESS PARK III Lot: 38 Project Description: TI Contractor: PACIFIC REALTY ASSOCIATES LP Owner: PACIFIC REALTY ASSOCIATES 15350 SW SEQUOIA PKWY #300 15350 SW SEQUOIA PKWY #300 PORTLAND, OR 97224 PORTLAND, OR 97224 PHONE: 503 - 624 -6300 PHONE: 503 - 624 -6300 FAX: 503 - 624 -7755 FEES Specifics: Description Date Amount Type of Use: COM Permit Fee - Additions, Alterations, 12/10/2010 $1,287.15 Class of Work: ALT Demolition Dwelling Units: 0 12% State Surcharge - Building 12/10/2010 $154.46 Stories: 1 Height: 0 ft Plan Review 12/10/2010 $836.65 Bedrooms: 0 Bathrooms: 0 Plan Review- Fire Life Safety 12/10/2010 $514.86 Value: $130,000 Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $2,793.12 Required: Required Items and Reports (Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in - • • fiance ith— approved plans. This permit will. expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. • ENTION: Oregon lawjequires you to follow the rules adopted by the Oregon Utility Notification Ce•ter. Those rules are set forth in OAR 952 .01 -0010 through OAR 952 -001 -1 t •. i may obtain a copy of the rules or direct questions to OUNC by calling 503.23_ :87 or 1.801- -'.` 4. • , Permittee Signature: � Lsued By: 1 f g _ Call 503.639.4175 by 7:00 a.m. for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. 1\ . „ Building Permit A licatio � ' "` "� s „ pig _ ,, < ' FO R , QFF,, osE O NLY t s City of Tigard / p DD il Receiv //�� a Date/By. /d` / �,Pemiit No �, ��� • 13125 SW Hall Blvd., Tigard, OR 97223 Plan Review Er . Phone: 503.639.4171 Fax: 503.598.19 C 0 2010 Date /B : Other Permit. TIGARD Inspection Line: 503.639.4175 Date Ready /By: IA See Attached Checklist for Internet: www.tigard- or.gov CITY OF TIGARD Notified Method: Supplemental Information BUILDING DIVISION._ , TYPE OF "WORK . R E Q UIRED D A T A: 1 A F D 0 New construction ❑ Demolition Permit fees* are based on the value of the work performed. Indicate the value (rounded to the nearest dollar) of all g Addition/alteration /replacement ❑ Other: equipment, materials, labor, overhead, and the profit for the CATEGORY OF CONSTRUCTION :, work indicated on this application. ❑ I- and 2- family dwelling ® Commercial /industrial Valuation: $ • El Accessory building ❑ Multi- family Number of bedrooms: ❑Master builder ❑Other: Number of bathrooms: _._,--r-‘: ��,� JO SITE INFORMATION AND LOCATION Total number of floors • . _ ms s _ :.; : ( , ... � r �.. _ . s . 1 M..._,n . to: Job site address: / /� 5 9 A e_.--- New dwelling area: square feet City /State /ZIP: '%� ,/ � &� p2 G9. V;5_5/ Garage /carport area: square feet Suite/bldg. /apt. no.: /, �/ Project name: ,, ,9-7, // ' y - Covered porch area: square feet Cross street/directions to job site: Deck area: square feet Other structure area: square feet REQUIRED,1DATA COMMERCIAL- USE Subdivision: Lot no.: Permit fees* are based on the value of the work performed. Tax map /parcel no.: Indicate the value (rounded to the nearest dollar) of all equipment, materials, labor, overhead, and the profit for the . DESCR[ PTION OF WORK w ork indicated on this application. A_ F —SA v it Valuation: $ � � e 2O f Existing building area: square feet - �'— - �s, New building area: square feet w ® TPROPERTY 1 , 5d , ® , TENA N T S t - > i ! Number of stories: / Name: PacTrust Type of construction: J Address: 15350 S.W. Sequoia Pkwy., //� q wy., Suite 300 Occupancy groups: City /State /ZIP: Portland, OR 97224 Existing: 9 Phone: (503)624 -6300 Fax: (503)624 -7755 New: ,£ ®'AP1i 1CANT ' . ,.. htil . Z ip. ® CONTACT PERSON , ;e r .i . NOTICE h 4 +' Business name: PacTrust All contractors and subcontractors are required to be Contact name: Dennis Pagni licensed with the Oregon Construction Contractors Board under ORS 701 and may be required to be licensed in the Address: 15350 S.W. Sequoia Pkwy., Suite 300 jurisdiction in which work is being performed. If the City /State /ZIP: Portland, OR 97224 applicant is exempt from licensing, the following reasons apply: Phone: (503) 624 -6300 Fax: : (503) 624 -7755 E -mail: dennisp @pactrust.com CONTRACTOR" % Business name: k °- .1,`.: 2 .4 7 L_&5 BUILDING PERMIT FEES * ` -: 11�� sete , e it � ` Address: " .. �.�., (Plea, refer to fee sch -T,e City/State /ZIP: Structural plan review fee (or deposit): Phone: ( ) Fax: ( ) FLS plan review fee (if applicable): CCB lie.: Total fees due upon application: ,4_.... Amount received: Authorized signature: This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Print name: _' - , 1 f Date: -7..... 6) Ai * Fee methodology set by Tri- County Building Industry - Service Board. t: \Building \Permits \BUP- PermitApp.doc 03/21/06 440- 4613T(11 /02 /COM/WEB) IN : .. • Building Division Over- The - Counter (OTC) Building Permit TIGARD Check List Description of Project: f -a L L ut_ p, r n GENERAL INFORMATION Class of Work:* 14,L Floor Areas (sq. ft.): Exterior Wall Construction: Type of Use:* CAM 'First floor: N: S: Type of Construction: floor: E: W: Occupancy Group: t �_ Third floor: Openings Protected Y /N ?: Occupancy Load: 3 Total sq ft.: N: S: Stories: / Note: Combine total floor area for E: E: Height: all floors above third floor and Roof Construction: Floor Load: add to the third floor-sq. ft. Fire Retardant: Basement: Basement: Area Separation Rated: Mezzanine: Garage: Occu. Separation Rated: REQUIRED ITEMS Fire sprinkler: 7 Handicap access: L i Smoke detector: AI Protected corridors: WA Fire alarm: A/ Parking spaces ( #): Notes: Total Valuation: $ 130 K INSPECTIONS FEES DUE Footing /foundation Firewall $ Permit Fee Post /beam structural Smoke detector $ State Surcharge Shear wall Misc. inspection $ Plan Review Fee Masonry Approach/ sidewalk $ FLS Plan Review Fee Framing $ Additional Permit Fee Insulation Sprinkler rough -in $ Additional Plan Review Fee Gyp board Fire alarm $ Metro Construction Excise Tax Suspended ceiling Sprinkler final $ School Construction Excise Tax Final inspection $ Misc. Fee $ Hourly Rate Fee $ Hourly Rate State Surcharge $ Other: $ Total Fees Due *OPTIONS: TYPE OF USE: COM = commercial; CMS = commercial manufactured structure. CLASS OF WORK ACS = accessory; ADD = addition; ALT = alteration; FND = foundation; DEM = demo; FND = foundation; FPS = fire protection system; NEW = new OTR = other (use for fences, decks, retaining walls, signs, awnings or canopies); REP = repair. L\ Building \ Forms \OTC - BUP.doc 08 /19/08 This form is recognized by most Building Departments in the Tri- County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. II .1 BUILDING DIVISION a TIGARD TRANSMITTAL LETTER TO: DATE B k ' D 0 DEPT: BUILDING DIVISION JAN 19 2011 CITY OF TIGARD FROM: , 2 2 c>n iii s BUILDING DIVISION COMPANY: G .77 vs f— PHONE: J 6.„9 By : r � RE: �f �) ermi " S�i✓ !�� �U a _� z r rte ress F ase lum.er 'roject name or su.. ivision name an of num.er ATTACHED ARE THE FOLLOWING ITEMS: Copi s ,'- , Description Copies Descr ptio'n.,, a Additional set(s) of plans. Revisions: Cross section(s) and details. Wall bracing and /or lateral analysis. Floor /roof framing. Basement and retaining"walls. Beam calculations. Engineer's calculations. Other (explain): REMARKS: v _ loci ✓ L • V, (q grr%cil) - (Q k- 1- 1- 1-- /z& CAP v' 7 % :FOR 0 F e _ iTSE _QNLY Routed to Perm TTechnician: Date: ( I \ Initials. Fees Due: es ❑ No Fee Description: Amount ue: ti 1,6 Viikwrk 4 $ /3/. 0 = vui_r i'�� -5 $ / P. 07V c.K ( VE_ $ / , cf7) 07 bur$ 9. 02 Special Instructions: Reprint Permit (per PE): es ❑ No / ❑ Pone j Applicant Notified: ?&tf.+v/ / $ D ate: /gyp f /j '` .Initials: /c c') / //1/T • Ae /v (S C E 96 9t"J l: \Building rdT�1STTit l r- Revisions. doe 4/4/07 <L``�A°% E CAP/ e (A/ 1 � C 3 / /Z /�T X72- «/