and Construction Services, Inc.
Address: 9025 Southwest Center Street
Mailing Address: P.O. Box 23784 • Tigard, Oregon 97281
(503) 620 -2086 • FAX (503) 684 -3636
July 29, 1999
City of Tigard
Building Department
13125 SW Hall Blvd.
Tigard, Oregon 97005
Attn: Bob Poskins, CBO
Senior Plans_Examiner
RE: ; Duncan Building
16135 SW 74` Ave.
Tigard, Oregon
PC# 2 -35C
BUP# 99 -0048
Job No 980'
•
Mr'Poski s:
The roof system for the Duncan Building is being changed from a "steel" truss
system to a wood truss system by Truss Joist Macmillan. Please find the
enclosed TJ /M approved shop drawings with Addendum No. 1, which is a
connection detail at the wall. If you have any questions please do not hesitate to
call.
Sincerely,
c z o
James D. Andrews
Project Manager
JDA:jmg
m■■ mm■■o■■■■■.... EINii I ••••••• 1 1 •••••••••••• II ■■N■ ■m I11 ■■ • •
1 III 1 ■■••■■ ••■■■■ ■■■■ ■■■■ IIIIIII II 1
1 1 ■ ■■■ ■� ■ ■■ 1_ ■■ ■ 1 f m■■ 1 1 1 ■■ •••
1 1 1 ■ ■•=1•••■ • 1 1 1 1 1 1 1 1 1 m=EMI
EMI l 1 1 1 1- .I. .m. ••••••
D If la' 1■1 ME ■
■m■ 0 1 MUM
••••••••••=1 1 I 1\010111 i1 1V11 ■■■ �■
■■■ 111111•111 f 1 1 m . �:���, o ..
■■ ■ ■� 1 ia �711\� i� ' 5 I ►. ■ mm •
I■ mo 1 1 ■■iii iilll iafiii l __l� ■__
and Construction Services, Inc.
9025 Southwest Center Street
P.O. Box 23784 •Tigard, Oregon 97223
(503) 620 -2086 , FAX (503) 684 - 3636
March 1, 1999
City of Tigard
Building Department
13125 SW Hall Blvd.
Tigard, OR 97223
Attn: Bob Poskins, CBO
Senior Plans Examiner
RE: Duncan Building
16135 SW 74
PC #2 -35C
B U P #99 -0048
Job #98 -0214
Dear Mr. Poskins:
The following is in response to the comments we received from your plan review
for the above described project. My numbered responses correlate to your
numerical listing under each category.
S GE RAL COMMENTS:
heet 3.2 the vertical rebar spacing was noted as 34" on the rebar
levations(sheet 3.2). It has been changed to 32 "o -c as noted elsewhere.
Calculations are enclosed for your review.
ENERGY COIV(LIANCE:
Lightin is not part of this permit. The lighting has been noted under Deferred
P its, on sheet 0.1.
ACCESSIBILITY:
a. A note regarding the "no open riser" requirement has been noted on sheet
2.1 and 5.3. Detail 4/5.3 has been revised also.
b. A continuous hand rail has been noted on sheet 2.1 and 5.3.
c. The exterior stairs have been lengthened to allow for the hand rail
extension and door opening clearance. Refer to sheet 5.3, plan at second
floor.
March 1, 1999
City of Tigard - Building Department
Duncan Building
Page 2
FIRE AND LIFE SAFETY:
1. The 3' -O" door leading into the floor space from the one hour enclosure
has been noted as one hour doors(1 and 2nd floors).
2. A note regarding attic access has been noted on sheet 2.3
3. Attic ventilation has been noted on sheet 2.4. A combination of roof
vents, ridge vents, and soffit vents are being used.
STRUCTURAL COMMENTS:
. At this time the owner believes that plastic sky lights will be used. Due
to the uncertainty of the owner on this item, we have required that a
"cut sheet" be submitted for approval. This requirement has been
noted on sheet 2.4.
If you have any questions or comments please do not hesitate to call.
Sincerely,
( Aa...."-e-4-0 . b. C.---. et \ A.A.
James'D. Andrews