Loading...
Plans (619) m _ _ __ _ �■momori oi■■i i • 1 1 � •p•• • 1 1 I I 1 U I •••••••••••••• 1.11•••••••••• ■te •••••••••• •••••••••• 11 715F1 LIAO. j 1M =NE= LI 1 1 paz wErt rt•••••• , .1mm. ••••=•••• • I ...... and Construction Services, Inc. Address: 9025 Southwest Center Street Mailing Address: P.O. Box 23784 • Tigard, Oregon 97281 (503) 620 -2086 • FAX (503) 684 -3636 July 29, 1999 City of Tigard Building Department 13125 SW Hall Blvd. Tigard, Oregon 97005 Attn: Bob Poskins, CBO Senior Plans_Examiner RE: ; Duncan Building 16135 SW 74` Ave. Tigard, Oregon PC# 2 -35C BUP# 99 -0048 Job No 980' • Mr'Poski s: The roof system for the Duncan Building is being changed from a "steel" truss system to a wood truss system by Truss Joist Macmillan. Please find the enclosed TJ /M approved shop drawings with Addendum No. 1, which is a connection detail at the wall. If you have any questions please do not hesitate to call. Sincerely, c z o James D. Andrews Project Manager JDA:jmg m■■ mm■■o■■■■■.... EINii I ••••••• 1 1 •••••••••••• II ■■N■ ■m I11 ■■ • • 1 III 1 ■■••■■ ••■■■■ ■■■■ ■■■■ IIIIIII II 1 1 1 ■ ■■■ ■� ■ ■■ 1_ ■■ ■ 1 f m■■ 1 1 1 ■■ ••• 1 1 1 ■ ■•=1•••■ • 1 1 1 1 1 1 1 1 1 m=EMI EMI l 1 1 1 1- .I. .m. •••••• D If la' 1■1 ME ■ ■m■ 0 1 MUM ••••••••••=1 1 I 1\010111 i1 1V11 ■■■ �■ ■■■ 111111•111 f 1 1 m . �:���, o .. ■■ ■ ■� 1 ia �711\� i� ' 5 I ►. ■ mm • I■ mo 1 1 ■■iii iilll iafiii l __l� ■__ and Construction Services, Inc. 9025 Southwest Center Street P.O. Box 23784 •Tigard, Oregon 97223 (503) 620 -2086 , FAX (503) 684 - 3636 March 1, 1999 City of Tigard Building Department 13125 SW Hall Blvd. Tigard, OR 97223 Attn: Bob Poskins, CBO Senior Plans Examiner RE: Duncan Building 16135 SW 74 PC #2 -35C B U P #99 -0048 Job #98 -0214 Dear Mr. Poskins: The following is in response to the comments we received from your plan review for the above described project. My numbered responses correlate to your numerical listing under each category. S GE RAL COMMENTS: heet 3.2 the vertical rebar spacing was noted as 34" on the rebar levations(sheet 3.2). It has been changed to 32 "o -c as noted elsewhere. Calculations are enclosed for your review. ENERGY COIV(LIANCE: Lightin is not part of this permit. The lighting has been noted under Deferred P its, on sheet 0.1. ACCESSIBILITY: a. A note regarding the "no open riser" requirement has been noted on sheet 2.1 and 5.3. Detail 4/5.3 has been revised also. b. A continuous hand rail has been noted on sheet 2.1 and 5.3. c. The exterior stairs have been lengthened to allow for the hand rail extension and door opening clearance. Refer to sheet 5.3, plan at second floor. March 1, 1999 City of Tigard - Building Department Duncan Building Page 2 FIRE AND LIFE SAFETY: 1. The 3' -O" door leading into the floor space from the one hour enclosure has been noted as one hour doors(1 and 2nd floors). 2. A note regarding attic access has been noted on sheet 2.3 3. Attic ventilation has been noted on sheet 2.4. A combination of roof vents, ridge vents, and soffit vents are being used. STRUCTURAL COMMENTS: . At this time the owner believes that plastic sky lights will be used. Due to the uncertainty of the owner on this item, we have required that a "cut sheet" be submitted for approval. This requirement has been noted on sheet 2.4. If you have any questions or comments please do not hesitate to call. Sincerely, ( Aa...."-e-4-0 . b. C.---. et \ A.A. James'D. Andrews Project Manager enclosures JDA:Ih