Report (636) Main Office Branch Office P.O. Box 23814 4060 Hudson Ave., NE Inc. Tigard, Oregon 97281 Salem, OR 97301 Carlson Testing, l Phone (503) 684 -3460 Phone (503) 589 -1252 FAX (503) 684 -0954 FAX (503) 589 -1309 September 7, 1999 99- 2555.CTI Permit No. BUP99 -00048 FIELD INSPECTION REPORT DATES COVERED: September 2, 1999 PROJECT: Duncan Building ADDRESS: 16135 SW 74th — Tigard, OR INSPECTOR: D. Vick, COP #722 09- 02 -99: CTI representative was onsite for a continuous masonry inspection. This inspector observed grouting of 8" CMU walls — north wail at - 24' from west wail, 10'6" iift; and west wall, 8' lift to top of walls. Anchors for ledgers were in place. Reinforcing and clean -outs were checked prior by another CTI representative. Reinforcing was found to be in compliance with approved plans and specifications. A 6 1 /2 sack Kurtz mix #884 was placed by pump and consolidated by vibration in two lifts. No samples were made. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, UC ARLSON TEST{N INC. jai _ / . PRESIDENT Douglas W. Leach President DV:jp cc: John Duncan City of Tigard Building Dept Nicoli Engineering & Construction Services, Inc. 99- 2555.FR Main Office Branch Office P.O. Box 23814 4060 Hudson Ave., NE Tigard, Oregon 97281 Salem, OR 97301 Inc. Carlson Testing l Phone FAX (503) 684 -0954 FAX (503) 589 September 17, 1999 99- 2555.CTI Permit No. BUP99 -00048 FIELD INSPECTION REPORT DATES COVERED: September 16, 1999 PROJECT: Duncan Building ADDRESS: 16135 SW 74th — Tigard, OR INSPECTOR: G. Seamster 09- 16 -99: CTI representative was onsite for periodic inspection of structural steel and welding. The following was noted. 1. Performed visual inspection of (8) tube steel columns. Welds inspected include base plate to tube steel column connection and tube steel to column buckets. All welding appears to conform to details and AWS D1.1. 2. Performed visual inspection of ledger clips at roof level of the north and south walls in warehouse area. All welding appears to conform to details and AWS D1.1. 3. Reviewed mill certificates for rebar used for embeds, item #1 on CTI non compliance list. Contractor is in compliance and item is signed off. -- -- 4. Need engineer approval for placement of roof line buckets with rebar embeds into CMU wall of office area. Rebar to bucket welds have not been signed off. Also need weld detail for buckets fabricated at Emmert Machining. All non compliance items were brought to the attention of: John Duncan, owner. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, RLSON TESTING, 1 • C. i\ i ES Douglas W. L T President GS /Ijm Attachment cc: John Duncan City of Tigard Building Dept Nicoli Engineering & Construction Services, Inc. 99 -2555. F R CARLSON TESTING, INC. INCOMPLETED ITEMS LIST (NCL) September 20, 1999 #99 -2555 Project Name: Duncan Building Project Address: 16135 SW 74 Tigard, OR Permit No: BUP99 -00048 ITEM INSP. DATE DATE ITEM DESCRIPTION COMPLIANCE CTI SIGN -OFF CORRECTED 1 JH 08 -02 -99 No paper work on embeds set Reviewed mill certificates. G. Seamster 09 -16 -99 this date. Grade 60 not A706. 2 JH 08 -06 -99 Wall this date from 0' to top were not consolidated. 3 JH 08 -13 -99 Walls this date not inspected prior to grout. 4 JH 08 -25 -99 No paper work onsite for rebar inspection of walls from 4' to 18'. 5 JH 08 -25 -99 Contractor could not get vibrator into first grout lift. cc: John Duncan City of Tigard Building Department Nicoli Engineering & Consulting Services, Inc. FROM : NICOLI ENGINEERING FAX NO. : 503 684 3636 May. 07 1999 03:19PM P2 Main Office Branch Office P.O. Box 23814 4060 Hudson Ave., NE Tigard, Oregon 97281 Salem, OR 97301 Carlson Testing Inc. Phone (503) 684-3460 Phone (503) 589 -1252 f FAX (503) 6840954 FAX (503) 589 -1309 March 30, 1999 CTI #98-G1670 Mr. John Duncan Exhibit "A" c/o Nicoli Engineering P.O. Box 23784 Tigard, OR 97281 FOUNDATION AND SITE PLAN REVIEW ADDENDUM TO FOUNDATION INVESTIGATION DUNCAN BUILDING TIGARD, OREGON At your request, we have reviewed the plans for the Duncan Building, sheets 0.1 through 5.1. The location of the building has been setback farther from the slope to Fanno Creek than what was assumed in our original report dated July 30, 1998. Since slope stability is no longer an issue that could readily affect the building, and the fill is estimated at between only 10 to 15 foot deep in the newly proposed area of the building, then spread footing foundations are now feasible in lieu of deep foundations provided a significant overexcavation and replacement with engineered fill is performed beneath all footings. • We anticipate that the overexcavation will need to be carried to a width 2 feet beyond the edge of each footing. The depth of overexcavation needs to be verified by CTI prior to backfilling, however, we anticipate that the depth will be a minimum of 6 feet and could average 10 feet. Boulders and difficult excavating conditions should be expected. The backfill should be compacted to a minimum of 90 percent of the modified Proctor and should preferably consist of irnported granular material such as reject rock or crushed aggregate base. The allowable bearing pressure on engineered fill can be assumed as 2,000 psf. Coefficient of friction may he assumed as 0.42 on granular fill. Based on our review, the plans referenced above are in accordance with these recommendations. No modifications or additional recommendations are being offered. If there are any further questions, please do not hesitate to call. CARLSON TESTING INC. Sincerely Yo �� PROF4. 6 �5 ��GI IVEE', 9 0� Xt.<7 14743 � � L/ , --t...11/4__ OREGON OREGON vq� ,9 . 2 3 . �, 4 �ES 0.1t14$ C (" James D. Imbrte, P.E., C.E. / Principal Engineer cc: City of Tigard FROM : NICOLI ENGINEERING FAX NO. : 503 684 3636 May. 10'1999 03:24PM P2 11'4, ,...!,....... -.. { � _ j .._. � � -. � � a,..,..,,,,. w. _ NOON NOON NOME , ■■■■■■■■■■■ ■■ ••••••■■■ ! ? ■■ ■■■■■ ■ •••••••■■ ■ ■ ••■ ■ ■�� It II ._ .... , MEAN ■ ■■ ■■■■■■■■■ ■■■ O1■■M , _._ _ ; _ • _ ■ I! INK 1E11 I■ ■I 1 ■■ • Ism RHY 154 I , i and Construction Services, Inc. 9025 Southwest Center Street P.O. Box 23784 -Tigard, Oregon 97223 (503) 620 -2086 • FAX (503) 684 -3636 May 10, 1999 City of Tigard Building Department 13125 SW Hall Blvd. Tigard, OR 97223 Attention: Bob Poskins, CBO RE: Duncan Building 16135 SW 74 Tigard, OR BUP #99 -00048 • Job #98 -0214 Dear Mr: Poskin, The footings have been excavated and a representative from Carlson Testing, Inc. has made a special inspection for the footing excavations. The Carlson Testing, Inc. representative required additional excavation at several locations. These areas were excavated, filled and compacted. The footing over excavations were not required to be of the depths suggested in the addendum to Carlson Testing, Inc. Foundation investigation, dated March 30, 1p99 (Carlson Testing, Inc. #98- GI670.) The inspection field reports should be forth coming Since no modifications are being proposed to the foundation system, the sealed documents as submitted for the permit documents will be used for construction. Sincerely, James D. Andrews • Project Manager JDA:jh FROM NICOLI ENGINEERING FAX NO. : 503 684 3636 May. 10 1999 03:24PM P1 Ni 1---. OCEAN IAr I�I .LE ME • iii IIo I 1 11►�I[I ` a I i iii 'iiiiiii�im and Construction Services Inc. 9025 S.W. Center Street Tigard, Oregon 97223 F A X C O V E R S H E E T DATE: May 10, 1999 TIME: 4:23 PM TO: BOB POSKINS PHONE: (503) 639 -4171 COMPANY: CITY OE TIGARD FAX: (503) 684 -7297 BUILDING DEPARTMENT FROM: JIM ANDREWS PHONE: (503) 620 -2086 FAX: (503) 684 -3636 RE: DUNCAN BUILDING BUP NO. 99 -0048 PAGES: 3 Message FROM : NICOLI ENGINEERING FAX NO. : 503 684 3636 May. 07 1999 03:20PM P3 CITY OF TIGARD • A Program for Inspection Services and/or Material Testing Date: a. - z 1— ,19_f City of Tigard: Plan Ck. No. 2 - y C - Bup No. Sit No. 79 --.G !7 Project Title: I r r i i- )v: Address /1 / 3 S f ‘;../ 2 >;s - t/.e Architect of Record Ph. address: ) �- Structural Engineer of Record: 77( ce, // Ph. address: e_ R % / r y rf� Geo- Technical Engineer of Record: Ph. f address: Provide the following information for the testing agency chosenn to provide inspection services and/or testing. Testing Agency: Cioat 't- TM ENG. Ph. C' -34 /'D Fax. 6434- 075 address ? b 13ox 2,3 81-i / 716 A PA GR- Geo- Technical Agency: 'M E -ri,-rrt•t-ta - v1 - *( Ph. Fax. address The owner certifies that the above noted Agency has been employed to conduct the special inspections or observations required herein. • 5o1- 1135 3 1. '1'1 (( � Si aturc of Owner Phone No. Date -.\' ,.....ate.... !� Print name Company name The following is a list of special inspection and/or services required by the 1996 Oregon Structural Specialty Code and Tigard's Municipal Code 14.06.010 through 14.06.040. The special inspections and/or testing services required for this project to be provided by the Testing Agency, Structural Engineer or Geo- Technical Engineer of Record are as follows: • e Spacial Inspectors for the Testing Agency shall be qualified, to the satisfaction of the Building Official, for inspections of the particular type of construction or operation. • Special inspectors shalll observe the work assigned herein for conformance with the approved plans and specifications and, submit topics of all inspection reports and, a final signed report in accordance with OSSC, Section 1701.3 to the building official. FROM : NICOLI ENGINEERING FAX NO. : 503 684 3636 May. 07 1999 03:20PM P4 • ,:.:,::.,..,..,.. • .4.:.:u.:�,. ..... a,M t,.,.FO_.. , i, i ii,i i,� r i i ... ..... ... . 1. Footings adjacent to slopes steeper than 33 - 1/3 % OSSC, Section 1806.4 a- Confirm building footings are properly set back from descending slope b. 2. Grading OSSC, Section 3309 a Regular grading [leas than 5,000 cu. yds. but considered unusual] Requirements for engineered grading apply. b. Engineered grading [exceeds 5,000 cu, yds.] Submit: 1. Geo-technical engineers report and, 2. a engineering geology report. 3. an as -built grading plan and, 4. a final report prepared by the soils engineer and. 5. the final report prepared by the geologist. t C. �dj7� Jr�fi �r 7 J4aj, OJ 7`I ,! 3. Fills OSSC, Section 3313 a. Preparation of ground, for fill or slopes exceeding 1 to 5 (20 %) Includes benching and proper termination at the toe of the slope b. Aci,c,ptani c of fill materials C. Compaction of fill m aterial to miniinum 90% of maximum density. 13125 SW Hall Blvd., Tigard, OR 97223 [503] 639 -4172 FAX [503] 684-7297 i s Vn r i)G.S p L mi s P 1.r)>c •