Report (640) 10/4/2000 Activities for Case #: BUP99 -00048 2:25:20 PM Assigned Hold Updated Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes BUPC005 Application received 2/5 /1999 BON RECD GEO 2/11/1999 BUPC008 Permit created 2/11/1999 GEO DONE GEO 2/11/1999 BUPC012 Plans routed to Plans Examiner 2/11/1999 GEO SENT GEO 2/11/1999 BUPC015 Plan Review Ltr. to Ofc. Svcs. 2/17/1999 RDP SENT RDP 2/17/1999 BUPC018 Revised Plans Received 3/31/1999 RDP APPR RDP 3/31/1999 BUPCO24 Plans Approved by CPE 3/31/1999 RDP APPR RDP 3/31/1999 BUPCO26 Approved Plans routed to DSTs 3/31/1999 RDP APPR RDP 3/31/1999 BUPC705 Foot/Found Insp NOTE RDP 5/11/1999 There will be special inspections for the footing design on this project. Carlson testing will check and approve footing deprth, compaction, etc. The footing design is spread footings BUPC707 Footing Drain 3/31/1999 5/13/1999 TLP PASS AKJ 5/13/1999 BUPC725 Slab lnsp 3/31/1999 6/16/1999 TLP PASS AKJ 6/16/1999 1st section ok BUPC727 Masonry Insp 3/31/1999 6/23/1999 TLP PASS AKJ 6/28/1999 special insp Carlson BUPC740 Framing Insp 3/31/1999 3/17/2000 TLP PASS AKJ 3/19/2000 ext wall framing and insul complete BUPC742 Roof naiing lnsp 3/31/1999 11/19/1999 RB PASS AKJ 3/19/2000 • BUPC750 Insulation lnsp 3/31/1999 2/25/2000 TLP PASS AKJ 3/16/2000 BUPC760 Gyp Board Insp 3/31/1999 3/17/2000 TLP PASS AKJ 3/19/2000 all sheetrock for entire bldg complete BUPC802 Final Inspection 8/1/2000 RDP FAIL RDP 8/1/2000 1. Provide smoke gasketing and rated closer on 1 hour doors between the "B" and storage room. BUPCO29 DST Post Review Completed 5/11/1999 BON DONE No Hold BON 5/11/1999 May or may not defer TIF. BUPC090 (F) Ready to issue 5/11/1999 BON DONE No Hold BON 5/11/1999 Will need to sign owner responsibility form before issuing permit. BUPC100 (F) Issue permit 5/12/1999 BON DONE No Hold BON 5/12/1999 BUPC705 Foot/Found Insp 6/8/1999 6/8/1999 6/8/1999 TLP PASS No Hold AKJ 6/8/1999 all special insp per plans, per Carlson Testing BUPC725 Slab Insp 7/11/1999 7/11/1999 7/9/1999 HAP PASS No Hold AKJ 7/11/1999 south 1/2 slab ok BUPC125 Stop Work Order Placed 11/1/1999 TLP DONE No Hold TLP 11/1/1999 Page 1 of 3 10/4/2000 Activities for Case #: BUP99 -00048 2:25:20 PM Assigned Hold Updated Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes BUPC075 Hold Release to Issued Status 11/18/1999 TLP PASS No Hold DGW 11/19/1999 Received documentation from CTI and Nicoli Engineering that resolved the outstanding violations and /or missing inspections. OK to proceed. BUPC757 Shear Wall Insp 11/19/1999 11/19/1999 11/19/1999 RB FAIL No Hold RB 11/19/1999 STOP WORK ORDER PLACED- 11 -1 -99 TLP Unable to pwerform inspection until removal of Stop Work. DO NOT PROCEED WITH COVER OR CONCEALMENT OF ANY KIND. Reviewed plans w/ Contractor and stated that he could cover roof. Other issues RE: Roof /Shear inspection can be viewed from underneath. BUPC070 HOLD for (note in activity) 2/29/2000 HAP HOLD No Hold HAP 2/29/2000 See stop work order 2/29/00 fill into wetland buffer and fill w/o permit. B UPA998 Phone call (note in activity) 3/3/2000 JMT DONE No Hold JMT 3/3/2000 requested drywall inspection. denied. stop work order in place. called john duncan, left message BUPC075 Hold release to Issued 3/15/2000 AMS RELS No Hold HAP 3/16/2000 Stop Work Order released and removed per instructions from Julia Hajduk..AMS BUPC757 Shear Wall Insp 3/17/2000 TLP PASS No Hold AKJ 3/19/2000 all shear blocking and strapping • per plans and specs BUPA730 Insulation Insp 2/25/2000 TLP PASS No Hold AKJ 3/26/2000 B UPC792 Misc. Inspection 4/12/2000 AKJ RECD No Hold AKJ 4/12/2000 special report for reinforcing steel (final summary letter) rec from CTI B UPC792 Misc. Inspection 4/12/2000 AKJ RECD No Hold AKJ 4/12/2000 special insp for concrete - compression strength testing final summary letter rec from CTI BUPC792 Misc. Inspection 4/12/2000 AKJ RECD No Hold AKJ 4/12/2000 special inspection: installation of wedge and epoxy anchors final summary letter recd from CTI BUPC770 Structural masonry final reprt 4/12/2000 AKJ RECD No Hold AKJ 4/12/2000 final summary report recd from CTI BUPC792 Misc. Inspection 4/12/2000 AKJ RECD No Hold AKJ 4/12/2000 special insp for structural steel, shop and field final summary letter recd from CTI BUPC792 Misc. Inspection 8/21/2000 RECD No Hold RB 9/5/2000 Final Summary Letter- Footing Excavation- OK. BUPC792 Misc. Inspection 8/21/2000 RECD No Hold RB 9/5/2000 Final Summary Letter- ' Placement of forms- OK. • Page 2 of 3 10/4/2000 Activities for Case #: BUP99 -00048 2:25:20 PM Assigned Hold Updated Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes BUPC792 Misc. Inspection 8/21/2000 RECD No Hold RB 9/5/2000 Final Summary Letter- Back -Fill and Compaction- OK. BUPC792 Misc. Inspection 8/21/2000 RECD No Hold RB 9/5/2000 Final Summary Letter - Verification of Soil Beraing Pressure- OK. BUPA060 HOLD for Code Enforcement 9/27/2000 AMS HOLD Hold AMS 9/27/2000 ENFORCEMENT ACTION: NOV for Occ w/o CofO. NO FINAL INSPECTION OR APPROVAL, NO CofO UNTIL RELEASE BY ENGR & PLNG. ?s, see Albert or Hap. 9 /27 /OOAMS BUPC960 Case Finaled 10/3/2000 TLP PASS No Hold TLP 10/3/2000 Page 3 of 3