Loading...
Report Main Office Branch Office P.O. Box 23814 4060 Hudson Ave., NE Tigard, Oregon 97281 Salem, OR 97301 Carlson Testing, Inc. Phone (503) 684 -3460 Phone (503) 589 -1252 FAX (503) 684 -0954 FAX (503) 589 -1309 June 16, 1999 Q t4 Q_ 060(c, 98- G1670.CTI Permit No. SIT99 -0006 FIELD INSPECTION REPORT DATES COVERED: June 16, 1999 PROJECT: Duncan Building ADDRESS: (16135 SW 74.th 7 Tigard, OR INSPECTOR: K. Parkin, COP #725 / WABO (PAR 86 0560) 06- 16 -99: CTI representative was present onsite fora periodic rebar and masonry inspection. This inspector inspected rebar in slab on grade at grids 2.5- 3 /A -B., Rebar size, grade and placement conform to approved plans. This inspector observed masons lay 8" CMU's for exterior walls. This inspector reviewed with contractor requirements of inspection for high lift grouting. Contractor will schedule inspections to verify all bond beam rebar. Work observed this date conforms to project plans, details and specifications. . Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully subm ed, " CARLSON TESTI ) , INC g35WENT Douglas W. Leach President KP:jp cc: John Duncan . Nicoli Engineering & Construction Services Inc City of Tigard BuildingDept .. _ _ __ . _. _ 98- G1670.fr Main Office Branch Office P.O. Box 23814 4060 Hudson Ave., NE Tigard, Oregon 97281 Salem, OR 97301 Car S Ori Testing i Inc. Phone (503) 684-3460 Phone (503) 589 -1252 7 FAX (503) 684-0954 FAX (503) 589 -1309 June 24, 1999 98- G1670.CTI Permit No. SIT99 -0006 / 99 -0048 FIELD INSPECTION REPORT DATES COVERED: June 23, 1999 PROJECT: Duncan Building ADDRESS: 16135 SW 74th — Tigard, OR INSPECTOR: K. Parkin, COP #725, WABO #PAR860560 -- 06- 23 -99: CTI representative was onsite for - a periodic Verified bond beam rebar -at --the 8' level at grids A/2.8 -3, 3 /A -B, and B/2 -3. Rebar, size, grade and placement conform to approved plans. Work observed this date conforms to project plans, details and specifications. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARL N TESTI ,,INC. PREMDENT Douglas W. Leach President KP /Ijm cc: John Duncan Nicoli Engineering & Construction Services Inc City of Tigard Building Dept 98-G1 670.fr Main Office Branch Office P.O. Box 23814 4060 Hudson Ave., NE Tigard, Oregon 97281 Salem, OR 97301 C arlson 1 T e ►S 1 . in g, Inc. Phone 0 FAX (503) 684 0954 FAX (503) 5891 2 309 June 10, 1999 98- G1670.CTI Permit No. SIT99 -0006 FIELD INSPECTION REPORT DATES COVERED: June 8, 1999 PROJECT: Duncan Building ADDRESS: 16135 SW 74th — Tigard, OR INSPECTOR: K. Parkin, COP #725 / WABO (PAR 86 0560) 06- 08 -99: CTI representative was present onsite for a continuous masonry inspection. This inspector inspected rebar in double bond beams at bottom of walls at grids 1 /A -B; 2 /A -B; 3 /A -B; 1 -3 /A and 1 -3/B. Rebar size, grade and placement conform to approved plans. Note: in general notes, it calls for a continuous #5 rebar. Details show a #4 bar. Per contractor, the engineer has accepted the #4 rear detail. This inspector observed contractor place by pump approximately (7) cubic yards of Lonestar mix #884, 6 1 /2 sack Kurtz mix into the above bond beams. No samples were taken. Work observed this date conforms to project plans, details and specifications. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. spectfully submitte. e . . RLSON TESTING, C. ViAieei.4 C.,1/4 i PRESIDENT Douglas W. Leach President KP:jp cc: John Duncan Nicoli Engineering & Construction Services Inc City of Tigard Building Dept 98- G1670.fr