Loading...
Report (638) Main Office Branch Office P.O. Box 23814 4060 Hudson Ave., NE Tigard, Oregon 97281 Salem, OR 97301 artson Testing, Inc. Phone (503) 684 -3460 Phone (503) 589 -1252 FAX (503) 684 -0954 FAX (503) 589 -1309 ')e 4 15..- - cXl—(Cr August 4, 1999 98- G1670.CTI Permit No. SIT99 -0006 / 99 -0048 FIELD INSPECTION REPORT DATES COVERED: August 2, 1999 PROJECT: Duncan Building ADDRESS: 16135 SW 74th — Tigard, OR INSPECTOR: M. Larson, COP #625 / WABO (LAR 66 4944) 08- 02 -99: CTI representative was present onsite for a periodic rebar and concrete inspection. This inspector checked rebar in 8" CMU wall to top in the following locations: B/2.4 -3; 3 /A -B and A/2.7 -3. Approximately (5) cubic yards of Lone Star 6 1 /2 sack 3/8" aggregate grout mix #0884 was pumped into wall and mechanically vibrated. No samples were made. Embeds set were grade 60 not A706 per 1/S5.2. Contractor will set them in this pour. Contractor said he had paperwork for these embeds, but could not find them. See non- compliance list. Non - compliance items were added to the non - compliance list as item #1 (see attached). Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTI , INC 11 w 1M$ _ - -- Douglas W. Leach President ML:jp Attachment cc: John Duncan Nicoli Engineering & Construction Services Inc City of Tigard Building Dept 98- G1670.fr CARLSON TESTING, INC. INCOMPLETED ITEMS LIST (NCL) August 4, 1999 #99 -G1670 Project Name: Duncan Building Project Address: 16135 SW 74 Tigard, OR Permit No: SIT99- 0006/99 -0048 ITEM INSP. DATE DATE ITEM DESCRIPTION COMPLIANCE CTI SIGN -OFF CORRECTED 1 ML 08 -02 -99 GIu Lam embeds and bracket over openings 2.4- 3 /A -B, A -B/3, and 2.7 -3 /A line. Rebar welded per detail 1/S5.2 was not A706 on embeds this inspector looked at. Superintendent stated he had all the paperwork on the welding but could not find it while this inspector was onsite. cc: John Duncan Nicoli Engineering & Construction Services, Inc. City of Tigard Building Department 4r CARLSON TESTING, INC. INCOMPLETED ITEMS LIST (NCL) April 5, 2000 R C TVED G9801670.CTI APR 0 7 2000 Project Name: Duncan Building Project Address: 16135 SW 74 Tigard, OR BY: Permit No: SIT99- 0006/99 -0048 ITEM INSP. DATE DATE # _ _ ITEM DESCRIPTION COMPLIANCE _CTI SIGN -OFF CORRECTED 1 ML 08 -02 -99 Glu Lam embeds and bracket . Letter received from Nicoll 03 -28 -00 over openings 2.4- 3 /A -B, A -B/3, Engineering resolving all issues. and 2.7 -3 /A line. Rebar welded per detail 1/S5.2 was not A706 on embeds this inspector looked at. Superintendent stated he had all the paperwork on the welding but could not find it while this inspector was onsite. cc: John Duncan Nicoli Engineering & Construction Services, Inc. City of Tigard Building Department • Carlson Testing onstruction Inspection & Related Tests ng Inc. , Geotechnical Consultin3 3EPORT OF PRISMS TEST SPECIMENS P.O. Box 23814 Tigard, Oregon 97281 fest Methods: UK 21-17 Phone (503) 684 -3460 FAX # 684 -0954 )ate Molded: 06/24 , 19 99 Job No. 98 -61670 Permit No: SIT99- 0006 /BUP99- 00048 3lient: JOHN DUNCAN 'roject: DUNCAN BUILDING address: 16135 SW 74TH TIGARD OR Contractor: Sub Contractor: - Concrete Supplier: LONE STAR NORTHWEST Truck No. 22 Ticket No. 659529 Cast By: J. HIETPAS Cu. Yds. 9 Load Not Weather: CLOUDY Temp. High: 80 60 Temp. Low: Location of Placement: SOUTH WALL 12 ' L IFT *BLOCK SUPPLIED BY MUTUAL MATERIAL Test Time: 12 ' 45 Concrete Temp: 60 Strength Requirement: 1 500 PSI @ 28 days Slump Cement Type Mix No. /No. Sacks 884-6.5 Air Content Max. Aggregate ` /8 " Admix. Amount: Brand: _ Admix. Amount: Brand: Set Test@ Register Date Date Total Area Unit Report Tested rea No. Days Number Rec'd Test Load PSI No. By A 28 7158 06/26 07/22 184,280 64.43 2860 DM B 28 7158 06/26 07/22 211,440 64.43 3280 DM C 28 7158 06/26 07/22 208,980 64.77 3230 DM • Remarks: A- 7.625X8.450X15.890 B- 7.625X8.450X15.890 C- 7.625X8.500X15.890 cc: NICOLI ENGINEERING & CONSTRUCTION SERVIC CITY OF TIGARD BUILDING DEPT /l Laboratory Supervisor Reviewed by: n,,..,,..,,,. t„ }ha matoriai tractarirncnae.tari nnlv. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. I Carlson Testing Inc. Construction Inspection &Related Tests Geotechnical Consulting REPORT OF PR ISMS TEST SPECIMENS P.O. Box 23814 Tigard, Oregon 97281 fest Methods: UBC 21 -17 Phone (503) 684 -3460 FAX # 684 -0954 )ate Molded: 06/24 , 19 99 Job No. 98-G1670 Permit No: S I T99- 0006 /BUP99- 00048 ;lient: JOHN DUNCAN 'roject: DUNCAN BUILDING address: 16135 SW 74TH TIGARD OR 3ontractor: Sub Contractor: concrete Supplier: X Truck No. Ticket No. 3ast By: CONTRACTOR Cu. Yds. Load No. CLOUDY Tem High: 80 Temp. Low: 60 Neather: Temp. g p ovation of Placement: SOUTH WALL TO 12' HOLLOW PRISMS Test Time: Concrete Temp: Strength Requirement: 1 500 PSI @ 28 days Slump Cement Type Mix No. /No. Sacks Air Content Max. Aggregate Admix. Amount: Brand: Admix. Amount: Brand: Set Test@ Register Date Date Total Area Unit Report Tested rea No. Days Number Rec'd Test Load PSI No. By 28 7159 06/26 07/22 85,980 40.75 2110 DM 28 7159 06/26 07/22 73,180 37.20 1970 DM 28 7259 06/26 07/22 72,180 37.05 1950 DM Remarks: *BLOCK SUPPLIED BY MUTUAL MATERIALS. cc; NICOLI ENGINEERING &CONSTRUCTION SERVIC CITY OF TIGARD BUILDING DEPT /� Laboratory Supervisor • Reviewed by: n,,. ran.-% .t na.tainc fn tha matarial tactarlfinsnnctad only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. • Main Office Branch Office P.O. Box 23814 4060 Hudson Ave., NE Tigard, Oregon 97281 Salem, OR 97301 C arlson Vesting Inc. T Phone (503) 684 -3460 Phone (503) 589 -1252 FAX (503) 684 -0954 FAX (503) 589 -1309 June 28, 1999 f 98- G1670.CTI r ( 1 tJ h / M Permit No. SIT99 -0006 / 99 -0048 p c ) FIELD INSPECTION REPORT d 9/fr 4/f l ' DATES COVERED: June 28, 1999 - f/a4/L OVieti (31)d ..� PROJECT: Duncan Building ADDRESS: 16135 SW 74th — Tigard, OR "P4 1 INSPECTOR: M. Larson, COP #625 / WABO (LAR 66 4944) 06- 28 -99: CTI representative was present onsite for a periodic rebar and masonry inspection. This inspector checked rebar in 8" CMU wall on A line 2.8 -3; 3 line A -B; and B line 2.4 -3 to 16' on A line and 3 line and 17'0" on B line. Approximately (6) cubic yards of Lone Star 6 '/2 sack, 3/8" aggregate grout mix #0884 was pumped into place and mechanically vibrated. No samples were made, and no tests were taken. Work observed this date conforms to project plans, details and specifications. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, (71JcA RLSON TESTING INC. /!4...4-41,e0.4 A n0 tn\(k' Douglas W:` to ° President 'l. ML:jp cc: John Duncan Nicoli Engineering & Construction Services Inc City of Tigard Building Dept 98- G1670.fr Main Office Branch Office P.O. Box 23814 4060 Hudson Ave., NE Tigard, Oregon 97281 Salem, OR 97301 C arlson Testing Inc. Phone (503) 684 -3460 Phone (503) 589 -1252 FAX (503) 684 -0954 FAX (503) 589 -1309 June 24, 1999 98- G1670.CTI Permit No. SIT99 -0006 / 99 -0048 FIELD INSPECTION REPORT DATES COVERED: June 24, 1999 PROJECT: Duncan Building ADDRESS: 16135 SW 74th — Tigard, OR INSPECTOR: J. Hietpas, COP #343, WABOHIE522831 06- 24 -99: CTI representative was onsite for periodic inspection of masonry. Inspected CMU wall sections at south elevation line 1 -3 and east section from 1 /A -A +60' and from 1/B -B +5'. Walls grouted from F & G to 15'. CTI representative K. Parkin inspected rebar at 8' level. Rebar conforms to drawing 3.2. Some dimensions have changed per owner's request (i.e. height of walls and openings). Observed (9) yards of Lone Star grout mix #884 placed at the above mentioned locations. Work conforms to UBC requirements. (3) grout and (3) hollow prisms were cast this date. Work observed this date conforms to project plans, details and specifications. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTI ),, INC.i b-tA-exext.4 tai • ?ItESII NT Douglas W. Leach President J H /Ij m cc: John Duncan Nicoli Engineering & Construction Services Inc City of Tigard Building Dept 98- G1670.fr Main Office Branch Office P.O. Box 23814 4060 Hudson Ave., NE Tigard, Oregon 97281 Salem, OR 97301 Carlson Testing Inc. Phone (503) 684 -3460 Phone (503) 589 -1252 FAX (503) 684 -0954 FAX (503) 589 -1309 June 30, 1999 98- G1670.CTI Permit No. SIT99 -0006 / 99 -0048 FIELD INSPECTION REPORT DATES COVERED: June 29, 1999 PROJECT: Duncan Building ADDRESS: 16135 SW 74th — Tigard, OR INSPECTOR: G. Watson, COP #643 / WABO (WAT 23 3239) 06- 29 -99: CTI representative was present onsite for a periodic masonry inspection. This inspector inspected 8" CMU construction grids A -B, lines 1 -2, 16' to 20'. Reinforcing size, type, spacing and lap conform to the City approved plans. Lone Star supplied a 7 sack grout mix. Contractor consolidated grout by vibration. Grout placement conforms to the project plans. Work observed this date conforms to project plans, details and specifications. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, ARLSON TESTING. INC. P E 3iDENT Douglas W. Leach President GW:jp cc: John Duncan Nicoli Engineering & Construction Services Inc City of Tigard Building Dept 98- G1670.fr Main Office Branch Office P.O. Box 23814 4060 Hudson Ave., NE Tigard, Oregon 97281 Salem, OR 97301 C arlson Testing Inc. T Phone (503) 684 -3460 Phone (503) 589 -1252 FAX (503) 684 -0954 FAX (503) 589 -1309 June 22, 1999 98- G1670.CTI Permit No. SIT99 -0006 / 99 -0048 FIELD INSPECTION REPORT DATES COVERED: June 22, 1999 PROJECT: Duncan Building ADDRESS: 16135 SW 74th — Tigard, OR INSPECTOR: K. Parkin, COP #725 / WABO (PAR 86 0560) 06- 22 -99: CTI representative was present onsite for a periodic rebar and masonry inspection. This inspector verified placement of bond beam rebar at the 4' level of perimeter walls along lines 1, 3, A and B. Rebar size, grade and placement conform to City approved plans. Contractor will schedule next inspection for when walls are laid up to 8' level. Work observed this date conforms to project plans, details and specifications. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, 0 ARLSON TESTING, INC. Ce..j, 4 4 .;.,.. ii,. Douglas V.'a.gE NT ,; President KP:jp cc: John Duncan Nicoli Engineering & Construction Services Inc City of Tigard Building Dept 98-G1670.fr CITY OF TIGARD A Program for Inspection Services and/or Material Testing Date: i o t i ki ,19 City of Tigard: Plan Ck. No. Bup No. 9q -000 4 Sit No. Project Title: 1:Ai O..J igrA6 Address 16135 sw 744 4/a — • / t P Architect of Record 4<4. ''r'4it o • Ph. address: S Po�r:.4,.�� ate. 97 3os — S.u46.-41 Structural Engineer of Record: Ph. address: Geo- Technical Engineer of Record: _ Ph. address: Provide the following information for the testing agency chosen to provide inspection services and/or testing. `- Testing Agency: Ph. Fax. 4- address Geo - Technical Agency: Ph. Fax. address The owner certifies that the above noted Agency has been employed to conduct the special inspections or observations required herein. Signature of Owner Phone No. Date Print name Company name The following is a list of special inspection and/or services required by the 1996 Oregon Structural Specialty Code and Tigard's Municipal Code 14.06.010 through 14.06.040. The special inspections and/or testing services required for this project to be provided by the Testing Agency, Structural Engineer or Geo- Technical Engineer of Record are as follows: • Special Inspectors for the Testing Agency shall be qualified, to the satisfaction of the Building Official, for inspections of the particular type of construction or operation. • Special inspectors shall observe the work assigned herein for conformance with the approved plans and specifications and, submit copies of all inspection reports and, a final signed report in accordance with OSSC, Section 1701.3 to the building official. Structural Inspections Services and Material Testing Category Description of'Services Required Provide By Yes f No 1. Concrete. OSSC, Section 1701.5.1 and Section 1903, 1904 and 1905 a. Review concrete mix designs b. Inspeet the placing of reinforced concrete. C. Observe the taking of test specimens. d. ‘11tS 2. Bolts Installed in concrete. OSSC, Section 1701.5.2 a Prior to and during the placement of concrete around bolts when stresses permitted by section 1925 are utilized. b. 3. Special Moment - resisting Frame. OSSC, Section 1701.5.3 and section 1921.9 a Provide continuous inspection of the placement of reinforcing steel and concrete, and submit a certificate indicating compliance. b. 4. Reinforcing Steel and Pre - Stressing Steel Tendons. OSSC, Section 1701.5.4 a. Inspection of reinforcing steel and pre stressing tendons before stressing and grouting of tendons in pre stressed concrete b. Observe and record results of all tendon stressing in pre stressed concrete. C. Observe grouting of all tendons in pre stressed concrete d. • 5. Structural Welding. OSSC, Section 1701.5.5 and Section 1703 a Observe the welding of any member or connection designed to resist loads and forces required by the OSSC. b Visually inspect floor and roof deck welding. C Visually inspect welded studs when used for structural diaphragm'or composite systems. (shear walls) d Visually inspect welding of stairs and railing systems. e. Check certification of welders doing work on site. f Visually inspect the welding of studs and joist. (part of a.) Observe the welding of special moment - resisting steel frames, and g conduct non - destructive testing required by OSSC, section 1703. h Observe the welding of reinforcing steel. 1. Category Descriphon of Services ;Required Provide By Main Office Branch Office P.O. Box 23814 4060 Hudson Ave., NE Inc. Tigard, Oregon 97281 Salem, OR 97301 Carlson Testing, i Phone (503) 684-3460 Phone (503) 589-1252 FAX (503) 684-0954 FAX (503) 589-1309 August 30, 1999 99- 2555.CTI Permit No. BUP99 -00048 FIELD INSPECTION REPORT DATES COVERED: August 27, 1999 PROJECT: Duncan Building ADDRESS: 16135 SW 74th — Tigard, OR INSPECTOR: S. Fox, COP #597 08- 27 -99: CTI representative was onsite for continuous inspection of masonry. Inspected reinforcing steel and grout placed in the CMU walls located between grid lines 1 -2 /A and lines A -A.5/1 at 0' -12'. A total of (9.5) cubic yards of Lone Star Northwest's grout mix design #884 was placed and vibrated. All reinforcing steel and clean outs were inspected prior to grout placement and were found to be in accordance with project drawings. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTIN't, INC. Sao PRESIDENT Douglas W. Leach President SF /Ijm cc: John Duncan Nicoli Engineering & Construction Services Inc City of Tigard Building Dept 98- G1670.fr Main Office Branch Office P.O. Box 23814 4060 Hudson Ave., NE Tigard, Oregon 97281 Salem, OR 97301 C arlson Testing Inc. l Phone (503) 684 -3460 Phone (503) 589 -1252 FAX (503) 684 -0954 FAX (503) 589 -1309 August 18, 1999 99- 2555.CTI Permit No. BUP99 -00048 FIELD INSPECTION REPORT DATES COVERED: August 18, 1999 PROJECT: Duncan Building ADDRESS: 16135 SW 74th — Tigard, OR INSPECTOR: J. Bryant, COP #586, WABO #BRY523915 08- 18 -99: CTI representative was onsite for continuous inspection of masonry. Inspected rebar placed at west CMU wall top lift (11'2 "). All rebar was placed in compliance with approved drawings. Clean outs were provided and cells were free of debris. Monitored the pouring of (6.5) cubic yards of Lone Star grout mix #0884, 6.5 - sack Kurtz mix at above location. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, i) . CARLSON TESTI ) , INC. PRESIDENT Douglas W. Leach President JB /Ijm cc: John Duncan Nicoli Engineering & Construction Services Inc City of Tigard Building Dept 98- G1670.fr Main Office Branch Office P.O. Box 23814 4060 Hudson Ave., NE Inc. Tigard, Oregon 97281 Salem, OR 97301 Carlson Testing c Phone (503) 684-3460 Phone (503) 589 -1252 FAX (503) 684 -0954 4 FAX (503) 589 -1309 August 17, 1999 99- 2555.CTI Permit No. BUP99 -00048 FIELD INSPECTION REPORT DATES COVERED: August 13, 1999 PROJECT: Duncan Building ADDRESS: 16135 SW 74th — Tigard, OR INSPECTOR: G. Watson, COP #643, WABO #WAT233239 08- 13 -99: CTI representative was onsite for periodic inspection of masonry. Inspected CMU construction at -- - stairwell grid N2 -3 - 0 =16': -- Contractor provided clean outs - at vertical bar. -- Reinforcement inspected from top and can conform only top 8' of reinforcement. What steel could be seen conforms to the project plans. Contractor consolidated grout. Lone Star supplied 6.5 -sack Kurtz mix. Grout placement conforms to project specifications. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. if there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, ARLS TESTI N 4) INC. f PRESIDENT Douglas W. Leach President GW /Ijm cc: John Duncan City of Tigard Building Dept Nicoll Engineering & Construction Services, Inc. 99 -2555. FR