Loading...
Report (635) n■■ ■n■uN■ ■■i ■n■■•m■B•11■nnU■■iu n■•■ ■■ n ■■■I11■■ ■N• ■■u■■u■■■■NNN■N■■■■n■■ ■■■ ■nm■■■■■■■■■ I I Nn■Nn■■N■NNN■u■■�■■Nm■ ■■NN N ■N ■ ■ ■N■N■ ■uN■■■■■■■ ■■■N ■ ■N■ ■NN ■N ■ ■ ■ ■n ■NN■■ ■■■■■■■.■■■m■■■■ ■ N■N■Nn■■N■■N■■NN■N N ■■■u■■■ ■■ ■ ■■■■N, ■■n■■ ■NU ■ ■N ■ ■n ■■■■■■■■■■N ■■■u 111111.1111•11••••111•11111111.111•11• 111111•111111111•••••••••••111•1111111 u U EW =1 EMI 111111••••••••••••••••••111 111••••••••••••••••=111•111, 1N: D wD 1.11•••••••••••111M M•1111111=11111111••••••111 E .L ■ ■ ■ ■n■■■n■■■■ N■N••••N•nN nil►.,. Moira ra CIA i irkm.iihyom ■■■■■■■■N ■■■■■ ■ ■ ■ ■ ■V ■ ■■■ ■0� ■ ■fi'1i1Y` iii �fiwil�iliY`r. ■■ ■ ■ ■ ■■■ ■■■ ■ ■ ■ ■■ I and Construction Services, Inc. d 8 Street Address: 9025 Southwest Center Street Mailing Address: P.O. Box 23784 'Tigard, Oregon 97281 (503) 620 -2086 • FAX (503) 684 -3636 November 12, 1999 City of Tigard Carlson Testing John Duncan AT TN: N: Hap Watkins A Sara Stone 706° SW P .Ime, w y 13125 SW Hall Blvd PO Box 23814 Beaverton, OR 97007 Tigard, OR 97223 Tigard, OR 97281 RE: Duncan Building- Noncompliance report (dated September 17, 1999) 16135 SW 74` Tigard, OR BUP No. 99 -0048 CTI No. 99 -2555 Job Number 98 -0214 Gentlemen: The following items were nonconformance issues developed by Carlson Testing, Inc. and noted on the enclosed incomplete items list, dated September 20, 1999. Nicoli Engineering is providing this report to describe the resolution of the noncompliance items. ITEM NUMBER 1 (Resolved) Summary: No inspection performed for the embeds at roofline of office (Ref. Detail 1/5.2). Embeds installed. Action: Mr. Duncan, the building owner and contractor has provided a letter with Mill Certification (enclosed) verifying the rebar g a dn of 4 e A.' - 5 r uczed F..rth mb2r!c The contractor exposed several areas where the welds between the rebar and embed plate could be inspected. Carlson Testing visually inspected these welds and found them to be 3/16" fillet vs. the 1 /4" fillet welds required by the approved documents. Upon further review of our calculations, a 3/16" fillet weld will develop the required strength of the No. 5 bar. Therefore the existing condition is adequate for the design requirements. ITEM NUMBER 2 (Resolved) Summary: Walls not consolidated Action: Carlson Testing, Inc. performed a harmonic impact test on the structures walls and found that is appears the grout was consolidated in the masonry walls. Nicoli Engineering is satisfied with the test performed and the results. ITEM NUMBER 3 (Resolved) Summary: Walls not inspected prior to grout. Action: Carlson Testing, Inc. located the rebar with a metal detecting device. Nicoli Engineering accepts the results and is satisfied that the rebar was placed according to approved documents. ITEM NUMBER 4 (Resolved) Summary: No reports for rebar inspection. Action: Same as item 3. ITEM NUMBER 5 (Resoiveci) Summary: Contractor could not get vibrator into first grout lift. Action: See item 2. At this time the nonconformance items 1 -5 have been resolved to the satisfaction of Nicoli Engineering. Sincerely, PRO 1 , James R. Nicoli, P.E. s i1 , JRN /cjb "j REGOr • Enclosure .a'` 1;, 9 FS N\ EXPDES: 12 -31- 201)0' f ' • Main Office Branch Office P.O. Box 23814 4060 Hudson Ave., NE Tigard, Oregon 97281 Salem, OR 97301 Carlson Testing, Inc. Phone (503) 684-3460 Phone (503) 589-1252 FAX (503) 684 -0954 FAX (503) 589 -1309 September 17, 1999 99 -2555. CTI Permit No. BUP99 -00048 FIELD INSPECTION REPORT DATES COVERED: September 16, 1999 PROJECT: Duncan Building ADDRESS: 16135 SW 74th — Tigard, OR INSPECTOR: G. Seamster 09- 16 -99: CTI representative was onsite for periodic inspection of structural steel and welding. The following was noted. 1. Performed visual inspection of (8) tube steel columns. Welds inspected include base plate to tube steel column connection and tube steel to column buckets. All welding appears to conform to details and AWS D1.1. 2. Performed visual inspection of ledger clips at roof level of the north and south walls in warehouse area. All welding appears to conform to details and AWS D1.1. 3. Reviewed mill certificates for rebar used for embeds, item #1 on CTI non compliance list. Contractor is in compliance and item is signed off. 4. Need engineer approval for placement of roof line buckets with rebar embeds into CMU wall of office area. Rebar to bucket welds have not been signed off. Also need weld detail for buckets fabricated at Emmert Machining. All non compliance items were brought to the attention of: John Duncan, owner. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, 2 RLSON TESTING, I• C. / Douglas W. L T President GS /Ijm Attachment cc: John Duncan City of Tigard Building Dept Nicoli Engineering & Construction Services, Inc. 99 -2555. FR CARLSON TESTING, INC. INCOMPLETED ITEMS LIST (NCL) September 20, 1999 #99 -2555 Project Name: Duncan Building Project Address: 16135 SW 74 Tigard, OR Permit No: BUP99 -00048 ITEM INSP. DATE DATE # ITEM DESCRIPTION COMPLIANCE _ CTI SIGN -OFF CORRECTED 1 JH 08 -02 -99 No paper work. on embeds set Reviewed mill certificates. G. Seamster 09 -16 -99 this date. Grade 60 not A706. 2 JH 08 -06 -99 Wall this date from 0' to top were _ not consolidated. 3 JH 08 -13 -99 Walls this date not inspected prior to grout. 4 JH 08 -25 -99 No paper work onsite for rebar inspection of walls from 4' to 18'. 5 JH 08 -25 -99 Contractor could not get vibrator into first grout lift. cc: John Duncan City of Tigard Building Department Nicoli Engineering & Consulting Services, Inc. November 12, 1999 To whom it may concern: The embedded beam seats, used at the jamb of each opening and building corner in the Duncan Building, were constructed with four #5 (A706) eighteen inch long pieces of rebar. Enclosed please see the specification sheets provided by Rose City Rebar Inc. Should you have any questions, please feel free to contact me at (503) 807 -1735. Thank you for your time and consideration. Sincerely, •hn A. Duncan '" « l . 4 ...; iJc. DI£+; rAn.nlo a- FABRICATION' Date: d (— REThFGRCE`tG STEEL CERTIFICATES I hereby certify that the material in this shipment, fabricated on run number t E.. is as shown on the Barlist and the Heat numbers represent materials found suitable for application to ASTM A 615 - 87 on the basis of certified test results. • BY: C� - -_ Charles Martin, Shop Superintendent Sold to: (j■piy-y) �.�e__#,, Job # 9q ‘ Release # / Shipped to: Ship Date Heat q a9 t /d c( � lid x,45 Grade Size Weight cP 3 F IS' 6 1 9 Affirmative Action Employer 5512A N E 105th Ave - Portland Or 97220 - (503)252 -4975 - (503)252 -9306 „ = Denote llhno,s CERTIFIED MILL TEST REPORT bill as.... 14.11r � s' 55 - Kankakee, Illinois Steel Division - 58 Birmingham, Alabama Steel Division 1.‘ ' a 70 - Seattle, Washington Steel Division SOLD • R S CITY RFBAR INC `� e TO 31 •Jackson, Mississi Steel Division DATE: 5 1 8 90q.W.1 1 • ...1512-A NE 105TH AV ...151E PORTLAND, OR 97220 -1113 BIRMINGHAM STEEL CORD SEATTLE, WA STEEL DIVISION B.L. NO. 70-W11488 2424 SW ANDOVER SHIP o ROSE CITY REBAR INC SEATTLE, WA. 98106- 1 1 00 LOAD NO 71700085773 TO • 5512 -A NE 105TH AVE (206) 933 -2222 e PORTLAND, OR 97220 -1113 ____� PHYSICAL TESTS CHEMICAL TESTS HEAT NQ,• DESCRIPTION YIELD TENSILE ELONG WTI° C Mn P S SI Cu — P.S.I. P.S.I. % IN 8” Bend DEF NI Cr /� Cb C.E. J# : R5820 Z19914072 * SEATTLE WA STEEL D I V I S I O N 63, 270 90, 030 19. 5/. OK - -5. 3% . 26 1.25 . 011 .038 . 18 . 36 _ . 49% 29 Rebar 60'(A706/ #9A706) 436MPa 621MPa .064 .11 .12 .03 .033 ASTM A70611-95b ?19914287 SEATTLE WA STEEL DIVISION 65, 550 103, 450 10.2 OK 1 -4. 2/ . 38 1. 121.018 .043 . 2 t . 39 60 % 13 Rebar 60' (Gr•420/ #4Gr60) 452MPa 713MPa .030 . 1 . 1 8 .02 ASTM A615/A615M -96a, GR 420 99I4288 SEATTLE WA STEEL DIVISION 66, 600 100, 000 1 1 0 . 2% OK ---4. 9% 38 1. 1 9 . 017 . 044 . 24 . 4 1 . 61% 13 Rebar 60' (Gr420 / #4Gr60) 459MPa 689MPa .029 . 12 . 19 .02 ASTM A615/A615M - -96a, GR 420 )99I 4 289 SEATTLE WA STEEL DIVISION 68,000 114,600 10.2 OK -4.2% .41 1.18 .017 .042 .23 .40 .64% 13 Rebar 60' (Gr4200/44Gr60) 469MPa 790MPa .032 .12 . 18 .02 ASTM A615/ A615M -96a, GR 420 IE I DENT I F : ED STEEL_ SHIPPED TS I N FACT COMPOSED F THE H _ATS INDICATED AND I') REP "ESEN ED D'- THE 1t(I L.-ES TES ED. THE TEST RESULTS INL'.ICATED ARE A TUOI.._ TE. T RESULTS OBTA- IN SA 1PI_E5 OF S - EEL "AT S TAKEN AND TESTED I N ACCORDANCE WITH S P E C I F I L A T I O N S , OR SAMPL _ NG, CHEM I C L RN LY S I , PHvS I CA STING AND MEASURING. IN REBAR MATERIAL, THE AVI_RAGE SPACING AND HEIGH OF IEFOR ATIONS HAtJE BE N ASURED AN I FOUND TO BE I N ACCORDANCE W I `H THE R I OU I REMENTS OF Ali - M A 6' 5. j . VERY CERTIFY THAT THE ABOVE FIGURES ARE CORRECT AS CONTAINED IN THE RECORDS OF THE CORPORATION, MANUFACTURING PROCESSES OF THE STEEL MATERIALS IN THIS PRODUCT, INCLUDING C" E . C7L� nil — L(ING. HAVE OCCURRED WITHIN THE UNITED STATES, IN COMPLIANCE WITH THE - ROY QUALITY ASSURANCE RICAN" PROVISION OF fHE SURFACE TRANSPORTATION ASSISTANCE ACT OF 198?.