Plans 1 1 I I I I I I I I I l u l l
1 1 II 1
1 1
_ 1 1
l
1
1 i t 1 ., 1 LI . , 1
1 .
. . _
INQ N - .
and Construction Services, Inc. opq,---O7
9025 Southwest Center Street
P.O. Box 23784 •Tigard, Oregon 97223
(503) 620 -2086 • FAX (503) 684 - 3636
March.1.8, 1997
Mr, Robert POSkin, CBQ
City of Tigard -Plans Examiner
13125 SW HaII Blvd,
Tigard, OR 97223
RE: NW Auction Gallery/Plan Review
• 15995 SW 74t Avenue
Tigard,, OR 97223
PC #1 -116c BUP #97 -0067
Job #97 -0105
Dear Mr. Poskin:
The following comments are in response to your plan review. My number responses
correlate to. your numerical. listing under each. category.
�
BUILDING VALUATION:
1. Mr. Duncan the. owner /contractor for the project isper .t ling the. tenant
improvement work. There are no si e b d.docu 0. _ t ,)for the proposed to be
performed, under this. application. T e - stimate, as. noted, on the. permit
application is the estimated as d termined-by Mr Duncan. If you would-like to
review the receipts for the materials. purchased'Mr.. Duncan does. have some of them.
available for your review: -
ENERGY COMPLIANCE:
1. The energy calculations have been resubmitted for your review.
u■■ ■ � u 1i■u • i�iiiiiii °iii�i
■ ■ ■ ■u
•••• I •■••••••••••••••
■ ■■ •••••••••••••••■• I
•••• emu■ ••■ ••••••••••••• �
■u ■ •■•••••••u •u •
■■■ rierr� orfir
■ ■u 101111 1 ■ ■f ■11 I= ■ I I 10.11 IL?Vio■►.1 Eft 1
■■ : i t ur 1101 MN WI 1:1111011111
INNE■ f i01`ii111liiiiiiiW%
and Construction Services, Inc. eve ° C2(X/7
9025 Southwest Center Street
P.O. Box 23784 .Tigard, Oregon 97223
(503) 620 -2086 • FAX (503) 684 -3636
March 28, 1997
Mr. Robert Poskin, CBO
City of Tigard -Plans Examiner
13125 SW Hall Blvd.
Tigard, OR 97223
RE: NW Auction Gallery/Plan Review
15995 SW 74 Avenue
Tigard, OR 97223
PC #1 -116c BUP #97 -0067
Dear Mr. Poskin:
Please find enclosed the information you requested, per our phone conversation regarding
NW Auction Gallery tenant work.
ELECTRICAL:
<L�' 1. The electrician has completed the interior lighting energy forms and they have been
3' enclosed for your review.
0 FLOOR PLAN:
1. Sheet TI -2 has been revised (removed "long term storage" note) and enclosed.
BARRIER REMOVAL:
1. A sidewalk along the east elevation will be constructed for access to /from the auction
room to an existing sidewalk which connects to the public sidewalk.
2. The interior ramp in the staging room was revised to meet accessibility requirements
(slope 1/12.)
If you have any questions please feel free to call me.
Sincerely,
si llvtev■-e4:1 - Cz dv ., c a ...A.d1/44
James D. Andrews
Project Manager
JDA:jh