Loading...
Correspondence =� �i •k 9,57-o oo 35 :-1 iti y . October 13, 1995 F Cm Nicoli Engineering s. :MIEGO .. 7) PO Box 23784 Tigard, OR 97281 Re: John Duncan Site 61615 -5- SW 74th PC9 -77C SIT95 -0.035 The plans and specifications have been reviewed for conformity to applicable codes. Please submit three (3) sets of revised plans and specifications incorporating the following requirements: 2te Provide existing grades and areas of proposed fill. A storm water drainage plan for both parking lots must be 0 submitted for review and approval. Show size and location of catch basin(s), pipe size, and type of materials [Section 1408 and 1410(b)]. A. Sizing of all storm drain piping shall be determined by UPSC Table 14 -2. If an engineered system is to be used in lieu of Table 14 -2, two sets of stamped plans and the hydrodynamic calculation must be submitted for review and approval. Cleanouts are required on all storm and sanitary sewer drain piping every 100 lineal feet and at each aggregate change of direction exceeding 135 degrees [Section 140(b) (1) (B)]. 4 Please supply catch basin detail for the Engineering Department. If you have any questions regarding this issue, please contact their office 434 -7312. A. Catch basins shall be trapped by using an inverted one - quarter bend or welded baffle. Provide catch basins constructed to OSPC Section 1408 specifications. Provide an erosion control plan showing locate of sediment fences, etc. for both parking areas. • 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 Nicoli Engineering October 13, 1995 pg. 2 Provide a grading and drainage plan illustrating grade breaks and control elevation. Accessibility 1. Provide a route connecting the van accessible parking aisle to the buildings. In accordance to OSSC, ADAAG Figure 9. If you wish to discuss any of these items, please give me a call. Sincerely, James Funk Plans Examiner sit95- 0035 \pc9 -77c •■■ •• ■ ■■•■o■■■■__ ••■∎ i • I = v ME ■•••••••••••■•••••••■•• ■■ ■■■■■■■ ■E■■ ■ ■ ■ ■ ■•=1■ ■ ■ ■ •••••• I •• ••••••••••=1 •11••••••••••••••••••111•••• I •••••••••••■ • ■• ■E■ • •• • •� •�■�• ■■■ MIME N ,r �. ■■ ■M■ •••• III hV II■f ■ 1 II • • ■ 11. D I `U1 WA ■N E■E ■■E s i� , r EEEE E20 on co p :A ii ' .�� 1 ■I■■ Nn■ iY` °iii I.iiiliiii7Y and Construction Services, Inc. 8 / 9 00Q 5s �, 9025 Southwest Center Street 1 P.O. Box 23784•Tigard, Oregon 97223 (503) 620 - 2086 • FAX (503) 684 -3636 January 3, 1996 Mr. Jim Funk Plans Examiner City of Tigard Building Department 13125 S. W. Hall Blvd. Tigard, Oregon 97223 RE: JOHN DUNCAN PROJECT 159K SW 74TH PC9 -77C SIT 95 -0035 JOB NO. 950110 Dear Mr. Funk: Please find enclosed revised Site Drawings for the Duncan Project (Revision date 12/29/95). Our numbered responses correspond to your plan review letter dated December 22, 1995). Per the Planning Department's review, two of the existing driveways /access ways are to be closed. I have noted this on the Site Dr.wings for your information. A more detailed Plan will be provided to the Planning Department at a later date. 4 01! The path of travel from the accessible parking stall adjacent to SW 74th has been revised (Sheet 1.1). A curb ramp to the sidewalk replaces the access aisle which ran behind the accessible parking stall. (See 9 /C -1 for the curb ramp detail. 2. The Storm Drainage (Sheet 1.3) Plan has been revised using table 14 -2, using the 3" rainfall category. The pipe slope has been . noted also. Please note that the west catch basin has been relocated approximately 60' to the east. This was done at the request of the contractor and owner. Sincerely, .3ckevv‘L.././17-2? an....cLust)./u/ James D. Andrews Project Manager JDA;jr i CITY OF TIGARD December 22, 1995 OREGON Nicoli Engineering 9025 SW Center Street P.O. Box 23784 Tigard, OR 97223 Re: JOHN DUNCAN "SITE" Isere _ SW 74th PC9 -77C Sit95 -0035 I have completed review of the materials submitted in response to our plan review letter of October 13, 1995. Please submit a ditional information for the following: The path of travel from the access aisle to the accessible parking stall adjacent to S.W. 74th cannot pass behind the parking stall as illustrated on Sheet 1.1. Submit three (3) copies of revised Sheet 1.1. showing conformance to OSSC, ADAAG Figure 9. /1( The storm drainage piping shall be sized in accordance with OSPC, Table 14 -2 using 3 -inch rainfall categories. Provide the correct size and slope specifications on Sheet 1.3 and submit three (3) copies. If you wish to discuss any of these items, please give me a call. Since ly, ?/ 7 " - , yj Z James Funk Plans Examiner sit95- 0035 \pc9 -77ca 13125 SW Nall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772