Loading...
Specifications • ••••••••11111•11•11•1 •MIII • 1 I • •••• NEN■ ■v.• •v_•. ■ ■ •_■ •• • 1111111111111•••• I MUM • VI q t r MI I ■M 1•11 ■ M • I UL ITEM •l 1•• IN I ■ ■■ i.. Giii ME■ • and Construction Services, Inc: S71-42S" ;v0GS--- 9025 Southwest Center Street P.O. Box 23784•Tigard, Oregon 97223 (503) 620 - 2086 • FAX (503) 684 -3636 December 18, 1995 Mr. Jim Funk Plans Examiner City of Tigard Building Department 13125 SW Hall Blvd. Tigard, OR 97223 RE: SITE PERMIT JOHN DUNCAN PROJECT 1591 144&& S.W. 74th Tigard, Oregon 97224 PC9 -77C SIT95 -0035 PROJECT NO. 950110 Dear Mr. Funk: The following comments are in response to your plan check for the John Duncan Project. All numbered comments are in response and correlate with your numbered comments in the plan review. I have upgraded the Engineer's Estimate to incorporate the facilities /utilities items. SITE f. Grades have been noted on Grading Plan, Sheet 1.2 V' See Sheet 1.3 for Storm Water Drainage Plan. The eastern parking lot (East of 74th) drains to the existing ditch along 74th, which M Q empties into the "pond ", which will be utilized as a water quality 1 treatment facility. The storm drainage piping size and type of / �! materials are noted on Sheet 1.3. The piping has been sized per U.P.S.C. table 14 -2. V3. Clean -outs every 100 lineal feet have been noted on Sheet 1.3. 4. See Sheet C.1, Detail 1 for catch basin information. Mr. Jim Funk December 18, 1995 Page. 2- 1* 5. See Sheet 1y for the Erosion Control Plan for both parking areas. 6. See Grading Plan for grade breaks and control elevation. ACCESSIBILITY: 1. A connecting route from the van accessible parking aisle to the building has been noted on Sheet 1.1. If you have any questions or comments, please do not hesitate to give me a call. Sincerely, Jim Andrews Enclosure JA:jr ••••••••■■■■•■U• ■■■ i ■■u•i■■•i•••i■■i■■i■ii■in■■■■i■ ■■■■ nu■ u■■■■■■ m■■ ■■■■■ ■■u ■n■u■u■■n■■■u■ ■■■n■■ ■■■ 1 ■■■ n■ n■■■■ nn■■ n■ ■■■n■■m ■nn■■ ■m■■■■■m■un■■■■■m ■u■ I I ■■■■ n■■■ un ■m■m■■unn■nu ■■■ ■ ■ ■ ■■nu■■ ■■■■n ■■ n■ n■■■ n■■■■■■■■■■ n ■n ■nn■■ ■■ ■ ■ ■u ■n ■W ■ ■ ■ ■■ ■■■ ■ ■ ■ ■■■ ••••■n■■••••••m • ••••■■•••m■•••••••■■■•••••n■ ■mn ■■■ •••••n■ ■■ NC � . p nnn ■■n ■■ ■ ■ ■ ■■ ■ ■ ■ ■ ■u ■ ■n ■ ■ ■ ■ ■ ■ ■nn mom 1 m U 1■i 1 Es u■nn■■■m■■■■■ ■n■ n ■■■n■■u•■m ■n■■■ I I∎. ii 'UrL'We 1n■■■ ■■■■■•••■■■•■ I ■■■■■n■mu■n■■■ _. ■, _ ,_ . _ m■■■■■■m■n ■n■■m■■■u■uu■n■i ►. ■ 1 �yi II - ie� ° ° ■ ■ ■■■ ■■m■ ■ ■ ■n ■■■■■■■■■■■■■■■■■■■■■61iiY ` i imLliiimbiwai ■■■■■■■■■■■■■■■■■■■■ and Construction Services, Inc. oco 9025 Southwest Center Street P.O. Box 23784 •Tigard, Oregon 97223 7 - i' • (503) 620 -2086 • FAX (503) 684 -3636 —r1 September 26, 1995 REVISED 12/12/95 ENGINEER'S ESTIMATE RE: SITE PERMIT JOHN DUNCAN PROJECT 5ggc S.W. 74th Tigard, Oregon 97224 SDR -0014 PROJECT NO. 950110 EXCAVATION: $1,275.00 (Remove organic material & disposal, approx 550 Cu. Yd.) GRADING: 2,804.00 (General rough and fine grading) FILL: 6,720.00 (Parking /circulation = 340 Cu. Yd. of 2" minus at $10.50 yd. = $3,570.00) (Building Pad = 413 Cu. Yd. of 3/4" minus at $10.50 yd. = $3,150.00) EROSION CONTROL: 172.00 (Installation of 480 L.F. of sediment fence at $.36 L.F.) BLOCK WALL: 4,000.00 (Installation of 800 S.F. @ $5.00 S.F.) SANITARY SEWER: 160 L.F. of pipe & trench @ $6.69/L.F. _ 1,070.40 Water tight connection @ existing manhole = 200.00 STORM SEWER: 460 L.F. of pipe & trench @ $6.80 /L.F. = 3,128.00 2 catch basins @ $226 ea. = 452.00 Engineer's Estimate John Duncan Project Project No. 950110 September 26, 1995 (Revised 12/12/95) Page 2 WATER LINE: Cut & tap into existing line = 100.00 55 L.F. of 2" dia. water line $4.30 /L.F. = 236.50 55 L.F. of 4" dia. sprinkler service line @ $5 /L.F. = 275.00 ASPHALTIC PAVING: 121 cubic yards (242 tons) @ $23 /ton = 5,566.00 CONCRETE SIDEWALK: 660 sq. ft. @ $2.50 /sq. ft. = 1,650.00 STRIPING IN PARKING LOT: 200.00 TOTAL $27,815,.00 •••••••••••• ••••••■••••••• �■� •••••••••••••� • • • •_ii••i••• rernuarrorrimrimommoom MIN Ir l ■r' IS 1 INN �� II Ih'Ulh'WA • ineretiermioi :�7\![:ui i 1 ■'1 II ■!I _ ��iY`iiili�i�tiiii � i ■ and Construction Services, Inc. i `,5". 0( .33' 9025 Southwest Center Street P.O. Box 23784•Tigard, Oregon 97223 (503) 620 - 2086 • FAX (503) 684 -3636 September 26, 1995 1 1,13 5 � A, .p' �° � `.' OREGON v ENGINEER'S ESTIMATE � itiS R. WC) . • ! EXPIRES: 12 - 31 - 96 Re: Grading Permit. John Duncan Project 11 is 1 S.w. 74th Tigard, Oregon 97224 SDR -0014 . Excavation: $1,275.00 (Remove organic mate is & lisp() .1, approx 550 Cu. Yd.) Grading: 2,804.00 (General rough and fi - grading) Fill: / 6,720.00 (Parking/circulation = 340 Cu. Yd. of 2" minus at $10.50 yd. = $3,570.00) (Building Pad = 413 Cu. Yd. of 3/4" minus at $10.50 yd. = $3,150.00) Erosion Control: 172.00 (Installation of 480 L.F. of sediment fence at $.36 L.F.) Block Wall: 4,000.00 (Installation of 800 S.F. @ $5.00 S.F.). TOTAL $14,971.00