Report (36) VLMK Consulting Engineers - ;f (5 -
- max? 2 c)
3933 SW KELLY AVENUE, PORTLAND, OREGON 97201 -4393 c�
_ (503) 222-4453 / FAX (503) 248-9263 / vlmk @ vimk.com ili tO 7 C�
PRINCIPALS
ALFRED H. VAN DOMELEN, P.E.
JAMES E. KNAUF, P.E.
GREGORY J. BLEFGEN, P.E.
JOHN T. BROOKS
FIELD REPORT HAVLIN G. KEMP, P.E.
KIMBERLY A. SCHOENFELDER
Date: December 10, 1998 Job No: 98073
Project: Creekview — 74 Avenue,- Permit No: SIT -98 -0020
Address: SW 74 Avenue _7 Contractor: Grigsby
Location: Tigard, Oregon / Owner: Pacific Realty
Weather: Clear Temp/Time: 55° at 11:30 a.m.
Present at Site: Jason Sahlin, VLMK Engineers
Items Noted:
I inspected the roof nailing at building `B" which appears to be per plans and specifications.
Strapping was installed using Simpson LSTA30 straps. Tension ties were being installed during
inspection. In addition, all girder blocking was in place, but drag struts had not been installed at this
time.
General Notes
1. Clean roof of all loose debris prior to roofing.
Other Notes
1. Incorrect joist seats noticed on building "A" at 63' joist spans. Correct joist seats must be
installed, see detail (9/S -4).
2. After roofing inspection a roofer informed me that one of his cartwheels had punched through
the roof deck. I informed Stellar Structures of the discrepancy.
Submitted by: _
Jason Sahlin, Structural Designer
Copy: John Miller, Pacific Realty Ventures
Nick Duerr, Grigsby Construction
Tom Plescher, City of Tigard Building Inspector
JTB:tdc
J`` p6 [N
c
A
co u N C \Field Reports \Creekview 74th 12- 10.Doc