Report 12/07/98 MON 18:14 FAX 1 001
,
GEODESIGN, INC_ 002 -6)
GEOTECHN1CAL , IENviRONMii'sNTAL. AND GEOLOGICAL CONSULTANTS
17400 S. W. Upper boons Ferry Rd., Suite 230
Porttdnd, Oregon 97224
Phone (503) 968 -8787
Fax (503) 968 -3068 rtsiggc
FAX TRANSMITTAL
L
To: Mr. John Miller : Pacific Realty Ventures, Inc.
Fax: 670-9400 Phone: 6705416
From: Mr. George Saunders Date: December 7, 1998
Job #: PacificRealty -4
RE: Creekview
0 Urgent ❑ For Review ❑ Please Comment 0 Please Reply
Pages: Description:
1 Fax Transmittal
3 Field Reports •
•
8 Total Pages
John,
Here is a copy of our December 4 and 7, 1998 field reports. Please call if you have
questions.
cc: John Brooks, VLMK Consulting Engineers, 248 -9263
John van Staveren, Pacific Habitat Services, inc. 570 -0855
Nick Duerr, Grigsby Construction, 643 -7916
Tom Plescher. City of Tigard Building Inspector, 6243681
•
CONRDENTIAL NOTICE: the Infomxition contained In this fawm0e is confidential and may also be subject to the attorney - Client
privilege. The information is intended only for the use of the Individual or entity to whom It Is addressed. tf the reader of this
message is not the intended redpient. this services as notification that any reading, disclosure, copying, distiibutlon. or the taking of
any action in reliance an the contents of this communication is strictly prohibited. If this transmission was received in error, please
Immediately notify us at (5W) 960 -8787 and return the original message to me of the adCress above via the U.S. Postal Service_
•
12/07/98 MON 18:16 FAX e004
•
GEODESIGN, INC. Page it of 1
¢EQTEGNNICAL, ENVIRONMENTAL, AND GEOLOGICAL CONSULTANTS
17400 S.W. Upper Boones Ferry Rd.
Suite 230
Portland, Oregon 97224
Phone (503) 968-8787
Fax (503) 968 -3068
FIELD REPORT
GDI Project: Prepared by: Ryan White
Project Name: Creekview Date; 07 DEC 98
Location: Tigard .__ ._... Report #
Arrival: 1525 Departure: 1610
Weather: Overcast, raining Permit #: SIT 98 - 0020 _
Purpose: Geotechnical Construction Monitofin .,.,_,._
I conducted this site visit at the request of Mr. Nick Duerr of Grigsby Construction. I met with Mr.
Duerr at the site_
The purpose of this site visit was to observe the rock pad which will support a 6 -inch reinforced
concrete section on the north side of Building B. According to a member of the Grigsby crew,
the area consisted of 8- inches of crushed rock underlain by silt. The rock was compacted with
''whackers" and a vibratory plate. The earthwork contractor stated that some pumping of the
subgrade was observed during the compacting of the base rock and some soft spots were
removed.
I observed a proofroll of the area using a loaded front -end loader. I observed deflection of the
subgrade under the loader, which left 1 to 2 -inch ruts. Using a 1/2-inch diameter steel probe I
probed the rock. Penetrations with the probe indicated that the consistency of the underlying
subgrade was soft to medium stiff.
It is our opinion that the underlying silt was disturbed during the compaction of the rock pad and
will gain strength if disturbance to the area is prevented. After discussing the situation with
George Saunders of our office, we recommended reducing the disturbance to the area by
preventing concrete truck traffic in this area.
Distribution:
John Miller, Pacific Realty Ventures, inc.. 670 - 9400
John Brooks, VUNK Consulting Engineers, 248 -9263
Nick Duerr, Grigsby Construction, 643 -7916
Tom Plescher, City of Tigard Building inspector, 684 -7297
This report presents opinions formed as o result of our observation of activities r elating to geotechnIml engineering or environmental services. We rely on the
contractor to comply with the ptare ono spwrIcattorn throughout the duration of the protect impactive of tl'o pnsence of our representorlve. Our work does
not Include supervision or direction df the contractor, the contractor's employees or agents. Our firm Is not responsible for site safety.
Signature; r�
Field Report Muster .tune 1998
12/07/98 MON 18:15 FAX t1003
GEODESIGN, INC. Page 2of
GEOTECHNIGAL, ENVIRONMENTAL- AND GEOLOGICAL CONSULTANTS
17400 S.W. Upper 600nes Ferry Rd.
Suite 230
Portland, Oregon 97224
Phone (503) 968 -8787
Fax (503) 968 -3068
FIELD REPORT
GD1 Project: PacificRealty -4 Prepared by. Geor a Saunders
Project Name: Creekview __ — Date: 12/04/98
Location; Tigard Report #:
Arrival: 9:30 Departure: 10:30
Weather: overcast Permit #: r SJT 98 -0020
Purpose: Geotechnical Construction Monitoring
values may be less than the specified requirement, the gravel should provided adequate
support of the floor slab.
Distribution:
John Miller, Pacific Realty Ventures. Inc., 670 -9400
John Brooks, VLMK Consulting Engineers, 248 -9263
Nick Duerr, Grigsby Construction, 643-7916
Tom Plescher, City of Tigard Building Inspector, 684 -7297
This report presents opinions formed as a result of our observation or activities relating to geotechnieel engineering or environmental service. We rey en the
contractor to comply with the plans and specifications throughout rho duration of the protect Irrespective of the presence of our representative. Our work does
not Include supervtlon or direction of the contractor. the contractor's employees or agents. Our firm Is not responsible for site safety.
Signature: [Y+r
Field Report Master June 1998
12/07/98 MON 18:15 FAX (it 002
GEODEsIGN, INC. Page 1 oft
GEOTECHNICAL. ENVIRONMENTAL AND GEOLOGICAL, CONSULTANTS
17400 S.W. Upper BoQnss Ferry Rd.
Suite 230
Portland. Oregon 97224
Phone (503) 968 -8787
Fax (503) 968 -3068
FIELD REPORT
GDI Project: PocificRealty -4 Prepared by: George Saunders
Projeca Narrre: Creekview Date: 12/04/98 _ W_
Location: Tigard Report #:
Arrival: 9:30 Departure: 10:30
Weather: overcast Permit #: SIT 98 -0020
Purpose: Geotechnical Construction Monitoring _—
I conducted this site visit (it the request of Mr. John Miller of Pacific Realty Ventures, Inc. and Mr.
John Brooks of VLMK Consulting Engineers. I met with Mr. Nick Duerr of Grigsby Construction at
the site.
Mr. Duerr requested that I observed the condition of the subgrade along the storm sewer being
installed at the western edge of SW 74'" Avenue. The concrete pipe had been installed, the
initial lift of backfill placed, and some of the compaction completed by the time of this site visit.
Based on my discussions with members of the design /construction team, we understand that
approximately 1 foot of stabilization /bedding rock was placed at the base of the trench
excavation prior to placing the pipe and sand backfill.
The storm sewer being installed is part of the half - street improvement associated with project
and an extension of the existing piping coming from the east and north. Approximately 5 to 10
gallons per minute of runoff from the existing storm sewer system were present during this site
visit.
I was able to probe through the sand backfill in areas that had not been compacted and to
observe the stabilization /bedding rock in areas where backfill had not been placed. In the
areas where I could probe, I found the stabilization /bedding rock and subgrade to be relatively
firm. However, it should be understood that compaction of the stabilization /bedding rock to 95
percent of ASTM D 1557 (os required by specifications) would likely not have been possible
because of the runoff in the trench. Our overall opinion is that while The stabilization /bedding
rock likely was not installed per specifications, the subgrade and bedding as installed will
provide adequate support for the storm sewer being installed at the site. Ultimately, the
contractor is responsible for the installation of the storm sewer, with the City of Tigard's final
evaluation based on the TV results.
At the request of Mr. Duerr, l evaluated the granular backfill along the closure strips of Building A.
We understand that Carlson Testing, Inc. has completed compaction tests of the granular
backfill, with Tess than 95 percent compaction relative to ASTM D 1557. I probed the surface of
the gravel using a footing probe. I observed minimal penetration of the probe under my full
body weight. Based on the results of my probing, it is our opinion that while the compaction
Field Report Master June 1998
;;i1/25/99 MON 18:42 FAX 45X6.5 sw 7(7 r__..) LA 001
?c.e
GEODESIGN, INC 5 > ik %%600 Za
GEOTECHNICAL, ENVIRONMENTAL, AND GEOLOGICAL, CONSULTANTS
17400 S.W. Upper Boones Ferry Rd., Suite 230
Portland, Oregon 97224
Phone (503) 968 -8787
Fax (503) 968 - 3068
FAX TRANSMITTAL
To: Mr. John Miller Company: Pacific Realty Ventures, Inc.
Fax: 670 - 9400 Phone: 670 -5416 _
From: Mr. George Saunders Date: January 25, 1999
Job #: PacificRealty -4
RE: Creekview
0 Urgent 0 For Review 0 Please Comment 0 Please Reply
Pages: Description:
1 Fax Transmittal
1 Feld Report
2 Total Pages
John,
Here is a copy of our January 25, 1999 field report. Please call if you have questions.
cc: John Brooks, VLMK Consulting Engineers, 248 -9263
Bill Ward, Grigsby Construction, 643 -7916
Nick Duerr, Grigsby Construction, 670 -7910
Tom Plescher, City of Tigard Building inspector, 684 -7297
CONFIDENTIAL NOTICE: the information contained In this facsimile is confidential and may also be subject to the attorney -client
privilege. The information is intended only for the use of the individual or entity to whom it is addressed. If the reader of this
message is not the Intended recipient. this services as notification that any reading, disclosure, copying, distribution. or the taking of
any action in reliance on the contents of this communication is strictly prohibited. If this transmission was received in error, please
immediately notify us at (S03) 968 -8787 and return the original message to me at the address above via the u.S. Postal Service.
X4/.25/99 MON 18:42 FAX 002
GEODESIGN, INC. Page 1
GEOTECNNIcAL, ENVIRONMENTAL, AND GEOLOGICAL CONSULTANTS
17400 S.W. Upper Boones Ferry Rd.
Suite 230
Portland, Oregon 97224
Phone (503) 968 -8787
Fax (503j 968 -3068
FIELD REPORT
GDl Project: PacificRealty -4 Prepared by George Saunders
Project Name: Creekview Date: 01/25/99 W
Location: Tigard Report #:
Arrival: 3:45 Departure: 4:15
Weather: Overcast Permit #: SIT 98 -0020
Purpose: Geotechnical Construction Monitoring
I conducted this site visit at the request of Mr. Nick Duerr of Grigsby Construction_ I met with Mr.
Duerr at the site. The purpose of this site visit was to observe the preparation of pavement
subgrade.
Mr. Duerr requested that [observe the subgrade along the west side of Building B. I observed an
approximately 8 -foot wide area with soft subgrade. Based an the exposed excavation at the
northwest corner of Building B and our prior observations, the footing excavation extended out
to approximately 8 feet, Based on my observations, the backfill above the footing drains consist
of on -site silty material. The backfill does not appear to have been compacted. Mr. Duerr
stated that a sidewalk would be constructed over the fill. As indicated in our geotechnical
engineering report, all backfill placed in building, pavement and sidewalk areas should be
compacted as structural fill. Accordingly, I recommended to Mr. Duerr that the soft,
uncompacted material be removed and replaced with structural fill. Base on the current wet
winter period, imported granular material will have be used for structural fill_
I observed two small (less than 5 feet in diameter) spots west of area where the prepared base
rock was pumping under the dump truck traffic. I recommended to the earthwork contractor
and Mr. Duerr that these areas be overexcavated to firm material, geotextile placed and
backfilled with imported granular material before the size of the areas increase from the truck
traffic.
Distribution:
John Miller, Pacific Realty Ventures, Inc., 670 -9400
John Brooks, VLMK Consulting Engineers, 248 -9263
Bill Ward, Grigsby Construction, 643 -7916
Nick Duerr, Grigsby Construction, 670 -7910
Tom Plescher, City of Tigard Building Inspector, 684 -7297
This report presents opinioru formed as a result of our observation of activities relating to geotechnlcol engineering a environmental services. We rely on the
contractor to comply with the plans and specifications throughout the duration of the prefect Irrespective of the presences of out representative. Our work does
not Indudo upervlslon or direction of 1ho contractor, the contractor's employees or agents. Our firm is not responsible for slfo safety.
Signature: tdiLe■ceS
Field Report Master June 1998
01/06/99 WED 12:51 FAX 00
•
•
GEODESIGN, INC. 6 o2C,�
GEOTECHNICAL, ENVIRONMENTAL, AND GEOLOGICAL CONSULTANTS
17400_S -W. Upper Boones Ferry Rd., Suite 230
Portland, Oregon 97224
Phone (503) 968 -8787
Fax (503) 968 -3068
•
FAX TRANSMITTAL
To: Mr: John Miller Company: Pacific Realty Ventures, Inc.
Fax: 670 -9400 Phone: 670 -5416
From: Mr. George Saunders Date: January 6, 1999
Job #: PacificRealty -4
RE: Creekview
❑ Urgent . ❑ For Review 0 Please Comment ❑ Please Reply
Pages: Description: —i-
1 Fax Transmittal
5 >K Field Report ��------- .__... - - -- — - --- - --
Iv X - -` Total Pages ,____..._---- ._.--- _.�_-- - - - - --
John,
•
Here is a copy of our January 6, 1999 field report. Please call if you have questions.
cc: John Brooks, VUv1K Consulting Engineers, 248 -9263 •
• 8i!! Ward, Grigsby Construction, 643 -7916
Nick Duerr, Grigsby Construction, 670 -7910
Tom Plescher, City of Tigard Building inspector, 684 -7297
•
Aar"-
CONFIDENTIAL NOTICE: the information contained in this facsimile is confidentiol and may also be subject to the attorney -client
privilege. The information is intended only for the use of the individual or entity to whom it is addressed. If the reader of this
message is not the intended recipient, this services as notification that any reading, disclosure, copying, distribution, or the taking of
any action in reliance on the contents, of this communication is strictly prohibited. If this transmission was received in error, please
immediately notify us at (503} 968 -8787 and return the original message to me at the address above via the U.S. Postal Service.
01/06/99 WED 12:52 FAX 002
GEODESIGN, INC. Page 1 of
GEOTECHNICAL. ENVIRONMENTAL, AND GEOLOGICAL CONSULTANTS
17400 S.W. Upper Boones Ferry Rd.
Suite 230
Portland, Oregon 97224
Phone (503) 968 -8787
Fax (503) 968 -3068
FIELD REPORT
GDI Project_ PacificRealty -4 Prepared by: George Saunders
Project Name: Creekview Date: 01 /06/99 _
Location: Tigard Report #:
Arrival: 8:30 Departure: 9:30
Weather: Overcast Permit #: SIT 98-0020
Purpose: Geotechnical Construction Monitoring
I visited the site at the request of Mr. Duerr of Grigsby Construction. 1 met with Mr. Duerr at the
site.
Mr. Duerr requested that we provide our recommendations on three topics. The topics as well as
our comments and recommendations follow.
1. Clackamas Construction, Inc. (CCI, the earthwork contractor) stated that they have
encountered soft subgrade in the pavement area north of Building 8. Mr. Duerr requested
that we observe the condition of the subgrade.
From the northeast corner of Building B, CCI had excavated for the pavements along the
north side of Building B approximately 170 feet. CCI personnel stated that the cut was left
between 4 and 6 inches high, with the final cut to design subgrade to be completed today.
Soft subgrade was observed at two areas, as shown on the attached site plan. Based on
probing, it is likely that firm material will not be encountered at design subgrade, but up to 6
inches below design subgrade. Mr. Duerr and CCI personnel requested that we evaluate
following final grading.
I recommended to Mr. Duerr and CCI personnel that the final subgrade not be trafficked by
construction equipment. Mr. Duerr stated that they would place a geotextile on the
exposed subgrade in drive isles prior to placing the base rock. The design section for the
pavement is 3 inches of asphalt underlain by 8 inches of base rock. I stated to Mr. Duerr and
CCI personnel that 8 inches of base rock will likely not provide adequate protection of the
subgrade given the wet subgrade conditions, the wet winter period, and the amount of
truck traffic required to export the cut and deliver base rock materials. I recommended that
the base rock be over -built to at least 18 inches in the drive isles during the mass export and
import to protect the subgrade.
Field Report Master June 1998
01/06/99 WED 12:53 FAX IA003
GEODES1GN, INC. Page2of3
GEOTECHNICAL, ENVIRONMENTAL, AND GEOLOGICAL CONSULTANTS
1 7400 S.W. Upper Boones Ferry Rd.
Suite 230
Portland, Oregon 97224
Phone (503) 968 -8787
Fax (503) 968 -3068
FIELD REPORT
_ GDI Project: PacificRealty -4 Prepared by: George Saunders
Projecf Name: Creekview Date: 01/06/99
Location: Tigard Report #:
Arrival: 8 :30 Departure: 9:30
Weather: Overcast Permit #: SIT 98 -0020 _
Purpose: Geotechriical Construction Monitoring
2. Mr. Duerr stated that CCI would continue the preparation of pavement areas around the
northern building this week. The majority of the area will be cuts; however some areas are
low and will require fill. Mr. Duerr requested our recommendations on the suitability to use
cut material as structural fill in the low areas.
I recommended to Mr. Duerr and CCI personnel that the on -site cut material is too wet to be
used for structural fill. Options for use of the on -site material include aeration, or lime or
cement amendment. Given the winter period, aeration will not be possible. Lime of cement
amendment may be possible; however, the quantities are too small to make this a viable
option. Therefore, and as recommended in our geotechnical engineering report, imported
granular material is required to complete structural fills if the on -site materials can not be
moisture conditioned for adequate compaction.
CCI personnel asked if reject gravel could be used to fill in the low areas. I stated that this
approach typically does not work. This depends on the amount of fill required to reach
subgrade elevation. Typically, and as appears to be the case at this site, the amount of fill to
achieve final subgrade elevation is relatively small. Placing thin lifts of reject material over
wet, sensitive, silt subgrade results in a high risk of damaging the subgrade. As stated in our
geotechnical engineering report, the initial lift should be placed thick (up to 18 inches) in the
effort to protect the subgrade. Accordingly, it is our opinion that placing thin lifts of reject
material is not appropriate for this site given the soil conditions and time of year.
3. Mr. Duerr stated that the electricians completed installation of electrical lines in the
pavement areas between the two buildings. Trench spoils were placed on the base rock,
resulting in silt- contaminated base rock. Mr. Duerr requested our opinion on the condition of
the base rock in this area.
Stockpiled silt was present on the base rock. In addition, the top of the base rock was mud -
coated over the majority of the area. Mr. Duerr was not sure of the existing grades relative
to the final base rock grades. I recommended to Mr. Duerr that two issues exist: a) if the
base rock provides adequate support for the pavement, and b) if some of the silt -
Field Report Master June 1998
04/06/99 WED 12:54 FAX • l� 004
GEODESIGN, INC. Page3of3
GEOTECHNICAL, ENVIRONMENTAL, AND GEOLOGICAL CONSULTANTS
17400 S.W. Upper Boones Ferry Rd.
Suite 230
Portland, Oregon 97224
Phone (503) 968 -8787
Fax (503) 968 -3068
FIELD REPORT
•
GDI Project: PacificRealty -4 Prepared by: George Saunders •
Project Name: Creekview Date: 01 /06/99
Location: Tigard Report #: _ �^
Arrival: 8:30 Departure 9:30
Weather: Overcast Permit #: SIT 98 -0020
Purpose: Geotechnical Construction Monitoring
contaminated rock needs to be removed. I recommended to Mr. Duerr that the area is
cleaned up and stockpiles removed so that we could complete a proof roll. Our
recommendations on both (a) and (b) will be provided following the proof roll and
evaluation of the base rock following cleanup and Grigsby- provided grades.
•
•
•
Distribution:
John Miller, Pacific Realty Ventures, Inc., 670 -9400
John Brooks, VLMK Consulting Engineers, 248 -9263
Bill Ward, Grigsby Construction, 643 -7916
• Nick Duerr, Grigsby Construction, 670 -7910
Tom Plescher, City of Tigard Building Inspector, 684 -7297
•
This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services. We rely on the
contractor to comply with the plans and specifications throughout the duration of the project irrespective of the presence of our representative. Our work does
not Include supervision or direction of the contractor, the contractor's employees or agents. Our firm Is not responsible for site safety.
•
Signature: A V4 S
Field Report Master June 1998
- —
Li_ocrow3r E . •
:
-1---------- _-
. •
c,
,
o
-. °2
•
_ 2'
.„--- _..,
......„--
/ EXPLANATION:
..- ,
----- ---- -
,------- --------A z ,' 8-1
0 BORINGS BY GEODESIGN, INC. co
0.
6.
to co
__----- a 4 0 ..... i , r / •
(MARCH 1998)/FILL DEPTH (FEET) -
1
..' • oT 7 .-/ / /
U
- k ,,, ,, TP-1 ot
to r. u .0 TEST PITS BY CARLSON TESTING, INC. z -4
(APRIL 1997)/FILL DEPTH (FEET)
- - ri ,' / /
0_ "/"-- ---- -------
1---
•
,• j / •
‘...1 .
/ 0
i / / / N 00
____ . ........or. • - - .. ..........
77 1,2..,;;...,,,,4,...,...74:,.....,.... ..... ,_. :? . „.... 1 .. _ l ii ; : :7 • 7: 51::_-1.7 1 . !:.:: : : : :-:- : ::• : , . - --- .
i - - --- %:••••0E- • - Za• ---;----- 1 :•: - :••\ -
4 7 - -•
_)
cc
„ . 6 . ;-4 ; , „,
.., , , ..m
,, •-- ,,,,, -:-:-=•, ',V.:\ : 6.
..,:::„,c., , L . •-----,,A.. 1 ..-.,i. :!\'..
. . . ,.
41 ,--- ',%.•.; .
•
••..._.
, /
NE \ Fs
.,
,
,
‘ - 7
'. ' •,'
„-,-• ...5
-'' /,',/,'
s .
AV ,,.. ...... ,, ...-,,,
,. ,. • ....,4.,... ..,„,- : , 7. s, ..• 111 In ' ,\ \'
1 '- _____. .• :•;;;- -i --,-;;--- mil 0 / BUILDING B I '
0
/ /---- ------ ' "-,---/ . -.: : --- \ NEIL) ,
, 7P-5 1N
• :11,0- ........-- Ca \ ENEN
-+ Mk TAT • l•
2: •••••:`....1 •
- , -oi 1M ot •
• —• -....„,-: : '
••••■•.--_ ----- 7 -- ---:-%-•••--.•----- ---. : .• . • - ;
11115 .
.
.......-... ,
' • '. • ' '' , 1 -- \ • 1 ‘‘, '., , .
. .
.
, Il• :
Z
. ,-'' . .114.46 '13-5 %. EIC4 ; lia , , .'s• .•`.
” ./- V "A. 1 • '•
■ 4 ;MI 1.??,---- BUILDING A , 1 --- :•-•-
•.-:-.,... :. ..---% MI: 0/ ', TP-4 I ‘s: %•• \
• :---, ,-"•• **-----.._ ) : ... 1111 142 1 111 ': IN: 5.0. DI I
• ‘% U \ ... MI '.' V.)
. -
m a
- •tt.,..„ ' : '-..'"•:.-..,:, . •k_ .
• .■ •••ri •,.. I 8-2 \ . •
Ompoji---omem.
'•-•..-.,........... , .• ...3- - N- s ---...,_ .... ;.• ar _ .., ,...,,, , ii. . => il.I
,r4,„Ininamiermi.,,,,,,,,,..,.:Inassissimmosissanuel 5.° Ce' \'-
0
0
......„.....„.........: ........ _ - •--...1-, - • 1.5 7 ------
"-----------.. "------ -' I a ; i ii i i'l - .7* - 1 ' '. .4 ------- ________ --------- TP- '' '' ''.. 0 60 )20 FT L.LI
1=1Nemonommod
' ..,
; ., _
. , III 5 - 41 •
0
........
cee''''ae ' ' it ,......_ . 1 1 I'
-........_ .,_ ........2. .......4.„-,
-, ---......._,. --------_______ si eio N .. .----.2-_ .._--__ _ _ _. '..■•■„,,,,- .," ..-LIP.' - .
Gr.
----_________t,„)._ _____...„...x.s.....- - ----L0000moormoopoomp000ceilm■losuma -. -- .-
________ — _____.______.„...s o --•_____ \ . • ss----ssi----
OD . SITE PLAN FROM DRAWING PROVIDED BY VLMK CONSULTING ENGINEERS. ---. , ,
. . . . I - . '''• '''-
_
c•I
,-1
C.1
T.4 .
•
co
• .
o
. •
o
•
0.1/06/99 WED 12:55 FAX IA 006
u
/ , o
- // 4 /
/ /
-, EXPLANATION: —
z 1
' ' BB — a
/ ® 8 . 0 BORINGS BY GEODESIGN, INC. g
o i (MARCH 1998) /FILL DEPTH (FEET) _
C
c' , ' , '- - TEST PITS BY CARLSON TESTING, INC. Z
lc 11.0
' (APRIL 1997) /FILL DEPTH (FEET) `
m 1 Q
41 / / ___I
C —
,
W
/ / _ I_-
/ , _ r ^
1/ -
' / , . N 00-09'38' ____.,,,:.. ___-_,-, ---= == --- - -- = -- _oc
2
U.
C.
' IF
8 .6_
a.
ti, •
8.0 °S
,� O
® B - 3 ...\ s0r � � � m Q
ME ; BUILDING 8 Ali Al //P /k ' •
■L 1 ' I/ TP -5 a kJ
ti■ •. .� x Z
■� " UN
,■ 1
e
■
i TP -6 MI N
• 5.0 ® .\� = ° o_ V
EL ,, x vI
■ 5.0 ® - ........ •
,-. .1 N
0
------ TP -7 _ x 0 60 120 FT
1 [ I 1 ' 1 I I .
i N : ... ,
....
, i : in '',
197.40' .immillow■■soine
(..)
- - wo. �; _
• 12/~7/98 THU 16:05 FAX . _loo
/55.//. f7S
5W /7# -h
S- /K COO Z�
GEODESIGN, INC- Page 1 of 1
GEOTECMNICAL, ENVIRONMENTAL, AND GEOLOGICAL CONSULTANTS
17400 S,W, Upper Boones Ferry Rd.
Suite 230
Portland, Oregon 97224
Phone (503) 968 - 8787
Fax (503) 968 -3068
FIELD REPORT
_._. _-._... ._.._..___._.,_._.._...._..._..._.. .........., :,....... - -
GDl Project: Pacifiickealt a Prepared • Don .,, Rond„w.. , ,.,, y_._.._......_._ ............... .__....._.- .._._._..._._._.._._
Project Name: Creekview Date: 12/17/98
Location: Tigard Report #:
Arrival: 12:00 Departure:
Weather: dear and cold Permit #: SIT 98 -0020
Purpose: Geotechnical Construction Monitoring
conducted this site visit at the request of Mr. George Saunders of GeoDesign, Inc. as
coordinated with Mr. Nick Duerr of Grigsby Construction.
observed the storm connection excavation between the 2 buildings. Caving has resulted in
the sidewall being 6 to 8 feet from the footing_ I recommended that the footing be surveyed in
3 points now and during open excavation. Backfill is to occur tomorrow and I recommended
backfill be expedited. If material sloughs near footing we should be alerted immediately and
lean mix backfill would likely be required in undermined areas. Backfill should consist of clean
granular structural fill. The base of the excavation is wet, very soft silt fill. 3 -4 feet of
overexcavation and stabilization with pit run rock is recommended.
We should be contacted to observe excavation conditions at the building sewer connection
west of the current excavation to evaluate sloughing and foundation support conditions.
Distribution: ,
John Miller, Pacific Realty Ventures, Inc., 670 -9400
John Brooks, VLMK Consulting Engineers, 248 -9263
Nick Duerr, Grigsby Construction, 643 -7916 and 675 -8181
Tom Plescher, City of Tigard Building inspector, 684 -7297
This report presents opinions formed as a result of our observotIon or actMties relating to geolochnicol engineering or environmental serviens. Wm rely on the
contractor to comply with the pions and spccfflcotions throughput the duro lion of the project Irrespective of the presence of our opresen •live, Our work does
not include supervision or direction of the contractor, tho contractor : employees or agents. Our firm Is n• responsible for site sof • .
Signature: 1
Field Report Master June 1998
stabilization with pit run rock is recommended. Also requests
observation of sewer lateral placement to evaluate sloughing and
foundation support conditions." Don Randema, PE /GeoDesign, Inc.
968 -8787. Nick Duer /Grigsby to coordinate, 312 -0893. (rec'd /jmh 122198)
C702 Excavation 12/17/98 TLP NOTE M
I I
Press F10 when done...
HISTORY: View Add Mult -case Update Delete List Print Insp Es <insert>
Update action dates, notes for selected item
—SITE WORK PERMIT
:SIT98 -0020: PROJECT:CREEKVIEW INDUSTRIAL: STATUS:I : UPD:10/24/98: :J *H:
PERMITTEE:LOY CLARK PIPELINE PRIM..:SDR97 -0009:
SITE ADDRESS:15865 SW 74TH AVE Unit: A &B JUR...:TIG:
CASE HISTORY
- -All Actions Req /Sent Schd /Due End /Done By Stat M
C005 Application received 06/09/98 BON PASS M
C008 Permit Created 06/09/98 JSD PASS
C010 Check for prcl. restrict. 06/09/98 JSD PASS M
— UPDATE ACTION NOTE
Rec'd field report for excavation observation w /noted undermined areas.
See entire report in file. "... 3 -4 feet of overexcavation and
stabilization with pit run rock is recommended. Also requests
observation of sewer lateral placement to evaluate sloughing and
foundation support conditions." Don Randema, PE /GeoDesign, Inc.
968 -8787. Nick Duer /Grigsby to coordinate, 312 -0893. (rec'd /jmh 122198)
C702 Excavation 12/17/98 TLP NOTE M
I I
Press F10 when done...
•
12/18/98 FRI 14:55 FAX /ri�� �(�� � 4,001
• P- L
1 ' /4/4— v 2)
GEODESIGN, INC. Page 1 of 1
CEOTECHNICAL, ENVIRONMENTAL, AND GEOLOGICAL CONSULTANTS
17400 S.W. Upper Boones Ferry Rd.
Suite 230
Portland, Oregon 97224
Phone (503) 968 -8787
Fax (503) 96 8-3068
FIELD REPORT
GO! Project: P acificRealty -4 Prepared by: Jeanne Niemer, PE
Project Name: Creekview Date: 12/18/98 �- -�
_Location: Tigard Report #:
Arrival: 1300 De • arture: -1345
Weather: clear and cold Permit #: SIT 98 -0020
Purpose : Geotechnical Construction Monitoring_
I conducted this site visit at the request of Mr. George Saunders of GeoDesign, Inc. Upon arrival
I met with Mr. Nick Duerr of Grigsby Construction.
The purpose of my visit was to observe the storm sewer excavation between buildings A and B.
I observed the storm connection excavation between the 2 buildings. The excavation, which
was perpendicular to the two buildings, extended to about 5 fo 6 feet from the northern
building. During my visit the contractor completed the excavation, with minor to moderate
sloughing occurring within the bottom five feet of the excavation and moderate ground water
seepage occurring at the base. They installed shoring in the excavation while I was on site
According to Mr. Duerr, after installation of the utility, the excavation will be backfilled with
granular, structural fill. Mr. Duerr will phone our office for additional observation as needed.
•
•
•
This roport presents opinions forted as d result of our observation of activities relating to geafechnlcol engineering or environmental services. We rely on the
contractor to comply with the pions and spodficatioru throughout the duration of tho protect irccpective of the presence of our representative. Our work does
not Include supervision or dUeetlon or the contractor, the contractor's employees or ogents. Our f k m Is not responsible for site safety.
Distribution:John Miller, Pacific Realty Ventures, Inc.. 670 -9400
John Brooks, VLMK Consulting Engineers, 248 -9263
Nick Duerr, Grigsby Construction, 643-7916 and 675 -8181
Tom Plescher, City of Tigard Building Inspector, 684-7297
Signature:
Page No. 1 CASE HISTORY FOR CASE NO.: SIT98 -0020
LOY CLARK PIPELINE
15865 SW 74TH AVE Unit: A &B
12/21/98 •
Action Description Req/ Schd/ End/ Action Notes Disp By Update Upd
Code Sent Done Done Date By
SITC005 Application received 06/09/98 / / 06/09/98 Per Bonnie, they had a copy of the final PASS BON 06/09/98 JSD
order. jsd
SITC008 Permit Created 06/09/98 / / 06/09/98 PASS JSD 06/09/98 JSD
SITCO10 Check for prcl. restrict. /' / / / 06/09/98 Per Bonnie, applicant had a copy of the PASS JSD 06/09/98 JSD
final order.
SITC011 DST /mail Land Use Condition Lt / / / / 06/09/98 Mailed on 06/10/98, due to printing PASS JSD 06/09/98 JSD
after 4pm. jsd
SITC013 Plans Routed to Plans Examiner 06/09/98 / / 06/09/98 PASS JSD 06/09/98 JSD
SITCO30 Reviewed plans routed to DSTS 06/09/98 / / 07/16/98 APPR RDP 07/15/98 RDP
SITCO32 DST Post Review Completed / / / / 07/15/98 Needs contractor identified. DONE B 07/15/98 BON
SITCO50 Hold for / / / / 07/15/98 SDR97 -0009 conditions of approval not HOLD B 07/15/98 BON
signed off. Also needs contractor
identified.
SITC092 (F) Issue permit / / / / 09/14/98 PASS GEO 09/14/98 GEO
SITC201 Hold Release to Ready Status / / / / 09/09/98 PASS B 09/09/98 BON
SITC700 Erosion Control Insp 844 -8444 07/09/98 / / / / 07/09/98 RDP
SITC702 Excavation 07/09/98 / / 12/17/98 Rec'd field report for excavation NOTE TLP 12/21/98 J *H
observation w /noted undermined areas.
See entire report in file. "... 3 -4 feet
•
of overexcavation and stabilization with
pit run rock is recommended. Also •
requests observation of sewer lateral
placement to evaluate sloughing and
foundation support conditions." Don
Randema, PE /GeoDesign, Inc. 968 -8787.
Nick Duer /Grigsby to coordinate,
312 -0893. (rec'd /jmh 122198)
SITC710 Fill 07/09/98 / / / / 07/09/98 RDP
SITC720 Grading 07/09/98 / / / / Site Work observation by the Geo -Tech is 07/15/98 RDP
required - Ensure you get them to
approve.
•
SITC740 Strm Drain Insp 07/09/98 / / 10/22/98 6" storm from co at ne corner of bld a PART GS 10/23/98 GES
so & w to wtr qual pond, including cth
bsn [2) and 3 cleanouts
SITC744 Culvert /Catch Basin 07/09/98 / / 10/23/98 Building A, Catch Basin & 250 -feet of PASS TLP 10/24/98 J *H
8 -inch storm drain line.
SITC750 San Sewer Insp 07/09/98 / / / / 07/09/98 RDP
SITC755 Sprinkler supply lines 07/09/98 / / / / 07/09/98 RDP
Page No. 2 CASE HISTORY FOR CASE NO.: SIT98 -0020
LOY CLARK PIPELINE
15865 SW 74TH AVE Unit: A &B
12/21/98
Action Description Req/ Schd/ End/ Action Notes Disp By Update Upd
Code Sent Done Done Date By
SITC757 Domestic water line inspect. 07/09/98 / / 10/12/98 Building A only. this inspection. PART TLP 10/24/98 J•H
SITC770 Misc. Inspection 07/09/98 / / / / 07/09/98 RDP
SITC775 Final Report Eng'd Grading 07/09/98 / / / / 07/09/98 RDP
SITC799 Final Inspection 07/09/98 / / / / 07/09/98 RDP
•
•
•
0;./07/99 THU 17: 33 FAX /5 7(771L ,4-7/E, a 001
GEODESIGN, INC.
GEOTECHNIcAL, ENVIRONMI=NTAL, AND GEOLoGIcAL CONSULTANTS
17400 S.W- Upper Boones Ferry Rd., Suite 230
Portland, Oregon 97224
Phone (503) 968-8787
Fax (503] 968 -3068
FAX TRANSMITTAL
To Mr. John Miller • Company: Pacific Realty Ventures, Inc.
Fax: 670 -9400 Phone: , 670 -5416
From: Mr. George Saunders Date: January 7, 1999 W�
Job #: PacificRealty -4
RE: Creekview
❑ Urgent ❑ For Review 0 Please Comment ❑ Please Reply
Pages: Description:
1 Fax Transmittal
2 Field Report
3 Total Pages
John,
Here is a copy of our January 6, 1999 PM field report. Please call if you have questions.
cc: John Brooks, VLMK Consulting Engineers, 248 -9263
Bill Ward, Grigsby Construction, 643 -7916
Nick Duerr, Grigsby Construction, 670 -79J0
Torn Plescher, City of Tigard Building Inspector, 684 -7297
•
CONFIDENTIAL NOTICE: the information contained in this facsimile Is confidential and may also a subject to the attorney - client
privilege. The information Is Intended only for the use of the Individual or entity to Whom it is addressed, If the reader of this
message Is not the intended recipient, this services as notification thoi any reading. disclosure. copying, distribution, or the taking of
any action In reliance on the contents of this communication is strictly prohibited. If this transmission Was received in error, please
immediately notiy us at (503) 968 -8787 and return the original message to me at the address above via the U.S, Postal Service.
01/07/99 THU 17:33 FAX 002
GEODESIGN, INC. Page 1 of 1
GEOr cHNICAL, ENVIRONM ENTAL.ANDGE0LOGICALCONSULTAN
17400 S.W. Upper Boones Fe rry Rd.
Suite 230
Portland, Oregon 97224
Phone (503) 968 -8787
Fax (503) 968 -3068
FIELD REPORT
GDI Pject: PacificRealt
...,.,,,.,w „.. r of `(- 4 ,,,,,_ -.,,,, Prepared ay: George Saunders
eekvi
----- ... Date. 01 /06/99
Project Name: Cr.... .__._..____. -- ._.._._.._......,..,.,. '
Location: Tigard Report #:
Arrival: . 3:30 De • arture: 4:30
Weather: Overcast Permit #: SIT 98 -0020
Purpose: Geotechnical Construction Monitoring — -
I returned to the site (prior visit this morning) at the request of Mr. Duerr of Grigsby Construction. I
met with Mr. Duerr at the site. Our recommendations associated with our morning site visit were
previously presented in a field report. This site visit involves soft subgrade in the pavement area
north of Building B, as identified in item No. 1 of our prior field report. At the time of our morning
visit, the area was between 4 and 6 inches high. Indications of soft subgrade were observed at
that time: however, the extent could not be determined until the cut was completed to final
grade and stockpile material removed. I probed the area using a 1 /2- inch - diameter foundation
probe. Given the time of the year, all subgrade is relatively wet. The combination of wet
subgrade and relatively soft subgrade was observed at three locations, as identified on the
attached site plan. Areas 1 and 2 contain loose material to depths of approximately 4 inches.
The material below this is medium stiff_ The combination of removing 4 inches and increasing the
base rock section from 8 to 12 inches should provided adequate support for the pavement. As
noted to the contractor, this section will not provide adequate support for repeated
construction traffic.
Area 3 consists of up to 1 foot of soft subgrade in the pattern of tire ruts. I recommended that
this area be overexcavated to a depth of 12 inches below the ground surface and backfilled
with base rock material. I recommended that all base rock for the pavement areas be placed
in a single lift to reduce the potential for damaging the silt subgrade. 1 understand that a
geofextile fabric will be placed between the base rock and the silt subgrade in all pavement
areas.
Distribution:
John Miller, Pacific Realty Ventures, Inc., 670 -9400
John Brooks, VLMK Consulting Engineers, 248 -9263
8111 Ward, Grigsby Construction, 643.7916
Nick Duerr, Grigsby Construction, 670.7910
Tom Plescher, City of Tigard Building Inspector, 684 -7297
Thls report presents opinions formed as o result of our observation of activities rotating to geotechnicol onglneering or environmental services. We rely on the
contractor to comply with the pions and specifications throughout the duration of the project irrespective of the presence pf our representative. Our work does
not include sUpoMsion or direction of the contractor, the contractor's employees or agents. Our firm Is not responsible for site safoty.
Signature: S ozA•r•
Field Report Master June 1998
-• 01/07/99 THU 17:34 FAX VI 003
N
, J
EXPLANATION:
% B ®BORINGS BY GEODESIGN, I C. a 4 ., : , / (MARCH 1998) /FILL DEPTH (FEET) _ , U
6 Y ® TEST PITS BY CARLSON TESTING, INC. z
J (APRIL 1997) /FILL DEPTH (FEET) r*f Q
J
/ ,
, , LL ' vi
;' / ; N oo ;.,: - -..;, _ y _ - _ _ __ - - ; . -
41,: :-. ,'•I'•_ _ � 1:.'= _ ------ . = - - - -- - "` -
8.0 �' (00 X l $
■
BUILDING B + j , ,
+ 1 L'i
, f
-,
iii' 1t�_•` Z
N cn
-6 'N
TP Q V •
5.0 ® MI o
x 0
B =� '' W
usimmioi. assumes ' .. ,
Q ,`' N 0
TP 7 ' = 0 60 120 FT
— 1___. -
i 9740 ■,r:.
ss Ss 53 • ...._1 Ss' f ss
Acsts