Correspondence adp 26oZ -" 2 • 4461 "it CITY OF TIG June 13, 2002 OREG Jim Andrews Nicoli Engineering P.O. Box 23784 Tigard,Or. 97281 �j 5 RE: Jim Castile @ y7( SW 74 Ave The City of Tigard Building Division has reviewed the submitted building plans for the above referenced address in accordance with the Oregon Structural Specialty Code (OSSC), 1998 edition and the Uniform Fire Code, 1997 edition as amended by Tualatin Valley Fire & Rescue. The following items need to be addressed and are not in compliance with the above mentioned Codes: 1) The Accessible walk from the parking stall to the building and the remote restroom shall be in compliance with OSSC sections 1103.2.4 (walk and slope), 1103.2.4.4 (passing space), and 1103.2.4.7 (separation from vehicular path) 2) Separate permits are required for the office /warehouse and the restroom addition due to the work being performed on two separate structures and possible different addresses. Please separate the plans.. a,ppfra.1 -*T s 3) Provide heat in the restroom to protect plumbing from freezing. 4) Re- submit (4) sets of each project for final review and approval. Due to the items identified as noted above the plan review has been terminated until the items have been properly addressed. In no way should this partial review be considered as a complete review. If you have any questions regarding this review, please contact me at (503) 369 -4171 ext. 392. S If, Daryl ones Plans Examiner Cc.Hap Watkins, Supervising Inspector Building Inspectors, file 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 Nicoli Engineering, Inc. ® 620-2086 _ PO Box 23784 Tigard, Oregon 97281 Pho�e� (503) 620 2086 Fax: (503) 684 3636 June 26, 2002 \` —11 : _. NEI #: 02 -0408 Daryl Jones 10 City of Tigard 13125 SW Hall Blvd Tigard, OR 97223 1 RE: BUP #: 2002 -0220, Jim Castile at 1 SW 74 Avenue Tigard, Oregon Dear Mr. Jones: The following numbered responses correspond to you letter dated June 13, 2002: 1. Our original intent was to use the accessible rout.exception at 1103.1. After further review, we have incorporated a ramp at the south edge of the project - area. 2. We have separated into 2 submittals, the original BUP submittal will only incorporate information regarding the structural upgrade to the existing structure . and associated walkways and the ramp for accessibility access to the remote restroom. The restroom has been submitted under a new application. 3. This information has been incorporated into the present submittal for the • restroom. 4. Done. If you have any further questions regarding this matter please do not hesitate to contact .• our office at your earliest convenience. Sincerely, • James Andrews, Project Manager • jda /hmb .enclosures • • X:1,1- 020408 \Letters\Response to Building Deptdoc Pa!;e 1 of t 9025 SW Center Street Tigard, OR 97223 — www.nicoiiengineering.com •