Permit CITY OF TIGARD BUILDING INSPECTION DIVISION
24 -Hour Inspection Line: 639 -4175 Business Phone: 639 -4171
Date Requested: 3-)--91' A.M. P.M. MST: ,n'
Location: /57/7 !,) 7 BUP : .73 OO S/
Tenant: mot; C t � , ,d....0 > Suite: / Bldg: MEC:
Contractor: J ` ' '' C IF .1 Phone: PLM:
Owner: Phone: , ELC:
—'1a. �� .. �-. / i. _ _.-% ✓L. ./.0 _ Ara. _ g
1 �-� ` ./• o / /
BUILDING B 1 on't) PLUMBING MECHANICAL ELEC °I CAL SITE
Site Post/Beam Post/Beam Post/Beam Cover /Service Sewer /Storm
Footing Roof UndFl/Slab Rough -In Ceiling Water Line
Slab Framing Top Out Gas Line Rough -In UG Sprinkler
Foundation Insulation Sewer Hood/Duct Reconnect Vault
Bsmt Damp Drywall Storm Furnace Temp Service MISC.
Masonry Ceiling Rain Drain A/C UG Slab
Shear /Sheath Fire Stklr /Alm Crawl/Found Dr Heat Pump Low Volt
-. • .rov-, Approved Approved Approved Approved
Appr /Sdwlk pved Not Approved Not Approved Not Approved Not Approved
1 AL FINAL FINAL FINAL FINAL
11 Call for reins I c ction 11 Reinspection fee of $ requir befor ne inspection O Unable to inspect rig Inspector: r Date: e Page of