Report •
CITY OF TIGARD BUILDING INSPECTION DIVISION
r 24 -Hour Inspection Line: 639 -4175 Business Phone: 639 -4171
Date Requested: " ' 7 r r
1 - 30i -q A.M. P.M. MST:
Location: 15 & ST 5 1w / '�" i-7-..._ C.Lu �- BUP: g () p - CJ U /��
/
Tenant: Suite: B1 : 6:
Contractor: Phone: �y PLM:
Owner: Phone: ELC:
T) oe 0 e / c.-- / ELR:
./�1 -C. __ w a INF SIT:
BUILDING BLDG •on't) PLUMBING MECHANICAL ELECTRICAL SITE
Site • . i : eam Post/Beam Post/Beam Cover /Service Sewer /Storm
Footing Roof UndFl/Slab Rough -In Ceiling Water Line
Slab Framing Top Out Gas Line Rough -In UG Sprinkler
Foundation Insulation Sewer Hood/Duct Reconnect Vault
Bsmt Damp Drywall Storm Furnace Temp Service MISC.
Masonry Ceiling Rain Drain A/C UG Slab
Shear /Sheath Fire Spklr /Alm Crawl/Found Dr Heat Pump Low Volt
- Approve Approved Approved Approved Approved
Appr /Sdwlk . - -- • .. - • Not Approved Not Approved Not Approved Not Approved
FINAL FINAL FINAL FINAL ' FINAL
O Call for rei - spectio1 O Reinspection fee of $ required before next inspection O Unable to inspect
Inspector: A - Date: / 30 ---�' Page of