Permit 1...11,p .
CITY OF TIGARD BUILDING INSPECTION DIVISION
24 -Hour Inspection Line: 639 -4175 Business Phone: 639 -4171
Date Requested: /— ) • - 9 A.M. P.M. MST: j�
Location: /5 /5 5� , BUP: ` 8 - V /�V i9
Tenant: ( 1 . Suite: 190 Bldg: „ MEC:
Contractor: / F. .) Phone: 6 (7,5 PLM:
Owner: Phone:
ELC:
*IA / ` 1 ) )11 t 4elib ELR:
SIT:
BUILDING /: LD con't) PLUMBING MECHANICAL ELE 2 RICAL SITE
Site P.:. :eam Post/Beam Post/Beam Cover /Service Sewer /Storm
Footing Roof UndFl/Slab Rough -In Ceiling Water Line
Slab Framing Top Out Gas Line Rough -In UG Sprinkler
Foundation Insulation Sewer Hood/Duct Reconnect. Vault
Bsmt Damp Drywall Storm Furnace Temp Service MISC.
Masonry Ceiling Rain Drain A/C UG Slab
Shear /Sheath _ Crawl/Found Dr Heat Pump Low Volt
Approved Approved Approved Approved Approved
Appr /Sdwlk of • _.:.. ved Not Approved Not Approved Not Approved Not Approved
i i" FINAL FINAL FINAL FINAL
•
O Call for rein .. ctio, /O ' einspection fee of $ required before next inspection O Unable to inspect
Inspector: �` _ Date: /— /7 Page of