Loading...
Permit 1...11,p . CITY OF TIGARD BUILDING INSPECTION DIVISION 24 -Hour Inspection Line: 639 -4175 Business Phone: 639 -4171 Date Requested: /— ) • - 9 A.M. P.M. MST: j� Location: /5 /5 5� , BUP: ` 8 - V /�V i9 Tenant: ( 1 . Suite: 190 Bldg: „ MEC: Contractor: / F. .) Phone: 6 (7,5 PLM: Owner: Phone: ELC: *IA / ` 1 ) )11 t 4elib ELR: SIT: BUILDING /: LD con't) PLUMBING MECHANICAL ELE 2 RICAL SITE Site P.:. :eam Post/Beam Post/Beam Cover /Service Sewer /Storm Footing Roof UndFl/Slab Rough -In Ceiling Water Line Slab Framing Top Out Gas Line Rough -In UG Sprinkler Foundation Insulation Sewer Hood/Duct Reconnect. Vault Bsmt Damp Drywall Storm Furnace Temp Service MISC. Masonry Ceiling Rain Drain A/C UG Slab Shear /Sheath _ Crawl/Found Dr Heat Pump Low Volt Approved Approved Approved Approved Approved Appr /Sdwlk of • _.:.. ved Not Approved Not Approved Not Approved Not Approved i i" FINAL FINAL FINAL FINAL • O Call for rein .. ctio, /O ' einspection fee of $ required before next inspection O Unable to inspect Inspector: �` _ Date: /— /7 Page of