Report 06/02/2000 Activities for Case #: SIT97 -00030 11:52:39 AM Assigned Hold Updated Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes SITC005 Application received 08/15/1997 08/15/1997 JSD RECD GEO 08/15/1997 SITC008 Permit Created 08/15/1997 08/15/1997 GEO PASS GEO 08/15/1997 SITC750 San Sewer Insp 08/15/1997 10/20/1997 TLP PART J *H 10/29/1997 Check with Bob P to see if they have submitted revised San specs. I'm advised they changed from an 8" to a 6 ", and moved same 50' from approved drawings. I caaled Castille 10/20/97 requesting revised plans. No Inspection if no revised plans. 10- 20 -97: 100 feet of 6 -inch sewer line installed parallel to 74th Street. -TLP SITC013 Plans Routed to Plans Examiner 08/15/1997 GEO PASS GEO 08/15/1997 SITC011 DST /mail Land Use Condition Lt 08/15/1997 GEO PASS GEO 08/15/1997 SITCO30 Reviewed plans routed to DSTS 08/20/1997 09/13/1997 RDP APPR RDP 09/12/1997 SITC744 Culvert/Catch Basin 09/12/1997 11/10/1997 TLP PASS J *H 11/12/1997 catch basin and 50 -ft of 6 -inch storm drain ok SITC740 Strm Drain lnsp 09/12/1997 11/04/1997 TLP PART J *H 11/05/1997 Rain drains approved. SITC757 Domestic water line inspect. 09/12/1997 01/26/1998 TLP PASS • J *H 01/27/1998 Water service to building D approved. SITC799 Final Inspection 09/12/1997 01/14/1998 TLP PART J *H 01/14/1998 Building A....Per David Scott (re conv Brian R) a 30 day temp occ is approvable as of 1615 hours 1 -13 -98 if no outstanding corrections on permit BLD97 -0407 other than knox box(es) / / /// /hap / / / /// 011498 - Site work adjacent to building A approved. SITCO32 DST Post - Review Completed 09/15/1997 JSD PASS JDA 10/02/1997 On hold pending authorization from Brian/Will to release permits. Need contractor identified. On my desk 09/15/97. 10/1/97: Per Hap, working w /out permit; double fee this permit: permit and erosion contol; SITC080 (F) Ready to issue 10/03/1997 JDA PASS JDA 10/03/1997 Need General Contractor identified and CCB current prior to issuance. If questioned about balance, the increased fees for site permit fee and erosion control permit fee is due to work without a permit. SITC092 (F) Issue permit 10/03/1997 JSD PASS DST 10/03/1997 Page 1 of 2 06/02/2000 Activities for Case #: SIT97 -00030 11:52:39 AM Assigned Hold Updated Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes SITC755 Sprinkler supply lines 11/04/1997 TLP PASS J *H 11/05/1997 Main fire line supply approved SITC750 San Sewer Insp 10/24/1997 MS PASS J *H 11/06/1997 160 feet of 6 -inch 30 -34 approved. SITC755 Sprinkler supply lines 11/07/1997 TLP PASS J *H 11/07/1997 Fire supply lines & vault 200# test. SITC740 Strm Drain Insp 12/12/1997 TLP PASS J *H 12/12/1997 100 ft ADS SITC740 Strm Drain Insp 12/19/1997 TLP PASS TLP 12/19/1997 100 FT. BLD C SITC720 Grading Insp 01/01/1998 J *H 01/01/1998 SITC799 Final Inspection 03/02/1998 TLP PASS AKJ 06/29/1999 Requires documentation of an approved flow test. See address file. Site observed 030298 by TLP, striping not yet complete. Per engineering, public improvements completed; still requires receipt of mylars, maintenance bond certificate or compliance has yet to be received (011398) Note: Per Mike W, mylars received. SITC744 Culvert/Catch Basin 01/26/1998 TLP PASS J *H 01/27/1998 Catch basin at bldg D approved. SITC799 Final Inspection 06/29/1999 06/29/1999 06/29/1999 TLP PASS No Hold AKJ 06/29/1999 SITC800 Case Finaled 06/29/1999 AKJ DONE No Hold AKJ 06/29/1999 Page 2 of 2