RE: 15615 SW 74th (Bldg. A) Building Plan Review
15655 SW 74th (Bldg. B)
PC #: 8 -51c and 8 -52c BUP #: 97 -0407 & 97 -0408
Submittal documents for the above referenced project have been reviewed for conformance with
the applicable 1996 Oregon Specialty Codes and other applicable codes and standards. The
following comments are noted:
ENERG0,791.0P IAWC A ; fr 4 , A,, ' 4 4;:fta1
1. Submit Completed Energy Compliance Forms 5a through 5c, Oregon Non - Residential
Energy Code.
ACCES - $.16 I'II , f 4 g g, ; V;i AM, <„ „.. r .. .
1. Stairways to the second floor shall have handrails on both sides.
OSSC, Section 1109.8.6 in its entirety.
2. The environmental control (thermostat) and lighting controls shall not be located more
than 54" above finished floor for accessible side reach approach or 44" for forward
approach [OSSC, Section 1109.2.3.6].
3. Stair nosing shall be flush and rounded to a radius of 1/2 inch. Nosing shall project no
more than 1 1/2 inches. OSSC, Section 1109.8.3.
4. Stair nosings and treads shall have a slip resistant surface.
OSSC, Section 1109.8.4.
rx.,= ;r x ,f diSd ,'* ! y Z 7 ,y ,,rz° . `- b "RA
1. Provide Type 2 -A fire extinguishers throughout so that the travel distance to an
extinguisher does not exceed 75 feet [UFC Std. 10 -1 3.2.11
2. Fire block in compliance with OSSC, Section 708.2.
3. Draft stops shall be installed so that the area between draft stops does not exceed 3000
square feet, and the greatest horizontal dimension shall not exceed 60 feet. OSSC,
Section 708.3.1.2.2.
13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772
.
15615 SW 74th (Bldg. A) Building Plan Review
PC #: 8 - c and 8 BUP #: 97 - 0407 & 97 - 0408
Page #2
S�'RUGTUFA.. �y� c�a .v f�l
1. When special inspection is required by OSSC, Section 1701, the architect or engineer of
record shall prepare an inspection program which shall be submitted for approval prior to
a building permit being issued [OSSC, Section 106.3.5].
A. Submit an inspection program designating the work requiring special inspection,
and the agency who will be responsible for conducting the inspections [OSSC,
Section 106.3.5].
B. Complete the enclosed Structural Special Inspection form designating an
Approved Testing Laboratory [Line B] and signed by the owner of the project
[Line D].
The completed form must be returned to this office before a building
permit can be issued.
ii. Copies of all special inspection reports shall be filed with this office
continually during construction.
A final signed report must be on file before the occupancy permit
will be issued [OSSC, Section 1701.3).
2. Provide parapets as required by OSSC, Section 709.4.1. Show details on revised plans.
3. You are showing a shear design value for glu -lams of 190 psi. OSSC, Volume 2 allows
165. Provide revised calculations.
4. Provide a TJI layout and design for the second floor design Toad of 125 plf.
5. Shear panel analysis page C10 by Ask 4 Engineering does not correspond with your
drawings 1.2 and 5.2. Revise your drawings accordingly.
1. A separate application and plans will be required.
� ^°^ a*v :�* ar n rX`.5�' _�". ""�,�� f* ass ..:�
GENERAL NOT ; : 707x4 .n �" ,
1. The tenant improvements do not include the outline of optional second floor above.
Please submit three copies of revised submittal documents and a letter indicating your response
to the above comments for review. Please call me at (503) 639 -4171 if you have any questions.
Sincerely,
784
Ro rt Poskin, CBO
PLANS EXAMINER
nLw ' 7_ a.or4.45,. mo
IguP s CITY OF TIGARD
Date � �31g7 OREGON
Structural Special Inspections
The owner or architect or engineer of record shall complete Parts B & D of this form and then return it to the Building Division for
approval prior to issuance of a building permit. (Please note that a separate soils special inspection form may be required and
additional special inspections may be required for contractor design items.)
Project Address: l 5't N "A" Project Name: P-111;
Architect of Record (Firm): Phone No:
Engineer of Record (Firm): NI tCoc.‘ Phone No: t 2
The following special inspections and structural observations shall be performed according to the State Building Code and the
City of Tigard's Municipal Code Chapter 14.06.010 - 14.06.040 unless a schedule of inspections is submitted by the Engineer of
Record and approved by the Building Division.
A. ❑ Reinforced Concrete El Prestressed Concrete
❑ Structural Steel ❑Structural Masonry, fm =
Ig Field Welding ❑Fireproofing
❑ Shop Fabrication g! Other nnPAc -rior3
B. Indicate the special inspector or approved testing agency to perform the special inspections noted in Part A above,
including addresses and phone numbers. Submit names, qualifications and certifications of the special inspectors
assigned to the project. The special inspector or inspection agency shall submit a final signed report to the Building
Division stating that all items requiring special inspection and testing were fulfilled and reported and, to the best of his/her
knowledge, in conformance with the approved design drawings, specifications, approved change orders and the
applicable workmanship provisions of the U.B.C. (see U.B.C. 3318 for soils special inspection final report requirements).
Items not in conformance, unresolved items or any discrepancies in inspection coverage (Le., missed inspections,
periodic inspections when continuous was required, etc.) shall be specifically itemized in this report.
C. ❑ Structural Site Observation by Engineer of Record
D. The owner hereby agrees to employ the special inspector, approved testing agency and/or engineer for the above -noted
special inspections and/or structural observation.
Signature of Owner
-/-Print Name - -( Phone No.
4. Finn )(Date
Structural Plans Examiner signature ■&AO.,,,CAST, DOC
13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772
•
ui uuui itli lPll�i14Q��'
•
August 15, 1997 II
CITY OF TIG®
OREGON
Jim Castile
8100 SW Durham Road
Tigard, OR 97224
RE: Plans Check Number: 08 -39C
This letter is to confirm receipt of your building plans which have been routed to the plans
examiner.
As a reminder, the associated land use case(s) is /are: SDR97 -0002.
Please be aware you are responsible for satisfying the conditions of the land use case(s)
and must submit plans directly to the appropriate staff person(s) indicated on your final
order.
Your building plans are not routed to the planning or engineering departments; you must
satisfy the land use permit conditions independent of the building permit plans review
process.
After the building plans review process has been completed, your building permit will
not be issued without approval from the engineering and planning departments.
If you have any questions regarding this notice, please feel free to telephone me and I will
be happy to explain further.
//,
Geo Oberkamper,
• Development Services Technician
cc: Building file
cc: Planning Department
cc: Engineering Department
I: \DSTS \BUPLUC.DOT
13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772