November 5, 2002 NEI #: 02 -0217
City of Tigard
ATTN: Engineering Department
13125 SW Hall Blvd
Tigard, OR 97223
Project: Building Permit: 2002 -00107
Site Permit: 1999 -00013
Meyer Sign
15205 SW 74 Avenue
Tigard, OR 97224
RE: Confirmation of water quality facility at Meyer Sign
To Whom It May Concern:
A representative of Nicoli Engineering, Inc. inspected the constructed vegetated swale
for the above noted project. To the best of our knowledge, the constructed facility
meets the design intent of the approved design documents and calculations prepared
by this office.
If you have any further questions regarding this matter please do not hesitate to contact
our office at your earliest convenience.
`cc
Sincerely,
1 S, c07
i
44i
O i
l?i� 41 ' 18 , * ` Z '
James Andrews E.N. Ketchum,
Project Manager Professional Engineer
jda /hmb
X:U -0202171LettersWWater Quality Facility.doc
9025 SW Center Street Tigard, OR 97223 — www.nicoliengineering.com
Main Office Salem Office Bend Office
,'•.O..Box 23814 4060 Hudson Ave., NE P.O. Box 7918
Tigard, Oregon 97281 Salem, OR 97301 Bend, OR 97708
Carlson Testing Inc • Phone (503) 684-3460 (503) 589-1252 Phone (541) 330-9155
FAX (503) 684 -0954 FAX (503) 589 -1309 FAX (541) 330 -9163
Special Inspection
FINAL SUMMARY LETTER
November 13, 2002
T0201013
City of Tigard
13125 SW Hall Blvd.,
Tigard, OR 97223 -8199
Attn: Building Department
Re: Meyer Sign Company — New Building •
15205 SW 74 — Tigard, OR •
Permit No.: BUP2002 -00107
Dear Sir or Madam:
This is to certify that in accordance with Section 1701 of the Uniform Building Code and Chapter 24.20,
Title 24, we have performed special inspection of the following item(s) per our inspection reports only:
Reinforcing Steel
Concrete — Compressive Strength Testing •
Installation of Cast -in -place & Epoxy Anchors
Structural Steel — Field, Includes Verification of Welder Certifications, Material Certifications and Weld Procedures
Installation of High Strength Bolts
. All inspections and tests were performed and reported according to the requirements of Project
Documents and, to the best of our knowledge, the work was in conformance with the approved plans and
specifications, approved change orders and applicable workmanship provisions of the State Building Code
and Standards, as well as the structural engineer's design changes, approvals and verbal instructions.
Our reports pertain to the material tested /inspected only. Information contained herein.is not to be _ r. . N .._ .
reproduced, except in full, without prior authorization from this office.
If there are any further questions regarding this matter, please do not hesitate to contact this office.
Respectfully Il bmitted,
CARLSON STING, INC.
•
Ja Hietpas
ii , ity Assurance Manager
/Is
cc: Meyer Sign Company of Oregon — Steve Murphy •
Silco Construction Co.
Nicoli Engineering — Jim Andrews .
P:\ WORDREPORTSVINLTRNT0201013