Loading...
Plans • s - ., 1 Nicoli Engir , ring, Inc. 'V 4' ct, '4:-A% PO Box 23784 Tigard, Oregon 97281 • Phone: (503) 620 -2086 • Fax: (503) 684 -3636 2covvo /U November 5, 2002 NEI #: 02 -0217 City of Tigard ATTN: Engineering Department 13125 SW Hall Blvd Tigard, OR 97223 Project: Building Permit: 2002 -00107 Site Permit: 1999 -00013 Meyer Sign 15205 SW 74 Avenue Tigard, OR 97224 RE: Confirmation of water quality facility at Meyer Sign To Whom It May Concern: A representative of Nicoli Engineering, Inc. inspected the constructed vegetated swale for the above noted project. To the best of our knowledge, the constructed facility meets the design intent of the approved design documents and calculations prepared by this office. If you have any further questions regarding this matter please do not hesitate to contact our office at your earliest convenience. `cc Sincerely, 1 S, c07 i 44i O i l?i� 41 ' 18 , * ` Z ' James Andrews E.N. Ketchum, Project Manager Professional Engineer jda /hmb X:U -0202171LettersWWater Quality Facility.doc 9025 SW Center Street Tigard, OR 97223 — www.nicoliengineering.com Main Office Salem Office Bend Office ,'•.O..Box 23814 4060 Hudson Ave., NE P.O. Box 7918 Tigard, Oregon 97281 Salem, OR 97301 Bend, OR 97708 Carlson Testing Inc • Phone (503) 684-3460 (503) 589-1252 Phone (541) 330-9155 FAX (503) 684 -0954 FAX (503) 589 -1309 FAX (541) 330 -9163 Special Inspection FINAL SUMMARY LETTER November 13, 2002 T0201013 City of Tigard 13125 SW Hall Blvd., Tigard, OR 97223 -8199 Attn: Building Department Re: Meyer Sign Company — New Building • 15205 SW 74 — Tigard, OR • Permit No.: BUP2002 -00107 Dear Sir or Madam: This is to certify that in accordance with Section 1701 of the Uniform Building Code and Chapter 24.20, Title 24, we have performed special inspection of the following item(s) per our inspection reports only: Reinforcing Steel Concrete — Compressive Strength Testing • Installation of Cast -in -place & Epoxy Anchors Structural Steel — Field, Includes Verification of Welder Certifications, Material Certifications and Weld Procedures Installation of High Strength Bolts . All inspections and tests were performed and reported according to the requirements of Project Documents and, to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our reports pertain to the material tested /inspected only. Information contained herein.is not to be _ r. . N .._ . reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully Il bmitted, CARLSON STING, INC. • Ja Hietpas ii , ity Assurance Manager /Is cc: Meyer Sign Company of Oregon — Steve Murphy • Silco Construction Co. Nicoli Engineering — Jim Andrews . P:\ WORDREPORTSVINLTRNT0201013