Plans OCT 20 '99 05 :21PM BMGP ENGINEERS, INC. P.2 /8
,' UP C fi CO 37r3
1045 13th Street SE
— Salem, Oregon 97302
-- (503) 399-1399
` ? MEMORANDUM 399 -8259
ENGINEERS, T N • C. . BMGPS @aol.COm
CONSULTING STRUCTURAL ENGINEERS
Date: Ortnhpr 7C); 1(199
To: Nelco, Inc_ Re: Fanno Acres Bus Park .. . Job # 990573_,S
Attn: Gale Nelson From: Williarp R Pease, P.F_
Reference: Tigard Building Permit No BUP 1999 -00383
• Fanno Acres Business Park
14865 SW 74 Tigard, Oregon
In response to our recent conversation, we offer the following Clarifications /Alterations to
the construction plans.
1) CMU Reinforcing (Details [4/6], [5/6], [9/6], [10/6] & [11/6]) Vertical reinforcement
of #5 @ 40" o.c. is correct, however Bond Beams with a minimum of (1) #5 or.(2)
#4's should be placed at top, bottom and mid height.
2) Grade beam reinforcing (same details). Longitudinal grade beam #4 bars May be
placed either outboard or inside of #5 wall verticals.
3) Perimeter Grade Beam under entry door (not detailed). Minimum depth of this 5
foot ± long grade beam should be 12" minimum, with a typical 8" width.
4) Demising wall construction (see Enclosures). Alternate framing with steel studs is
provided for demising walls. (see Alt -1, Alt -2, 7/6, 15/6, 18/6). This includes new
framed opening between back -to -back units.
We believe the above addresses issues raised to date. If you have any questions or
additional comments, please let us know.
CITY OF TIGARD
Approved
Conditionally Approved (�
For only the work as described in: 1 j
PERMIT NO. e _ PRQF
See Letter to: Follow .
N
Attach ' 8110
Job Add r `
ess: [ �-924s �� ��z�
l` �s T 21• �\
Cc: Robert Poskin, CBO (City of Tigard) ' R. PS -, 4)
•