Loading...
Plans OCT 20 '99 05 :21PM BMGP ENGINEERS, INC. P.2 /8 ,' UP C fi CO 37r3 1045 13th Street SE — Salem, Oregon 97302 -- (503) 399-1399 ` ? MEMORANDUM 399 -8259 ENGINEERS, T N • C. . BMGPS @aol.COm CONSULTING STRUCTURAL ENGINEERS Date: Ortnhpr 7C); 1(199 To: Nelco, Inc_ Re: Fanno Acres Bus Park .. . Job # 990573_,S Attn: Gale Nelson From: Williarp R Pease, P.F_ Reference: Tigard Building Permit No BUP 1999 -00383 • Fanno Acres Business Park 14865 SW 74 Tigard, Oregon In response to our recent conversation, we offer the following Clarifications /Alterations to the construction plans. 1) CMU Reinforcing (Details [4/6], [5/6], [9/6], [10/6] & [11/6]) Vertical reinforcement of #5 @ 40" o.c. is correct, however Bond Beams with a minimum of (1) #5 or.(2) #4's should be placed at top, bottom and mid height. 2) Grade beam reinforcing (same details). Longitudinal grade beam #4 bars May be placed either outboard or inside of #5 wall verticals. 3) Perimeter Grade Beam under entry door (not detailed). Minimum depth of this 5 foot ± long grade beam should be 12" minimum, with a typical 8" width. 4) Demising wall construction (see Enclosures). Alternate framing with steel studs is provided for demising walls. (see Alt -1, Alt -2, 7/6, 15/6, 18/6). This includes new framed opening between back -to -back units. We believe the above addresses issues raised to date. If you have any questions or additional comments, please let us know. CITY OF TIGARD Approved Conditionally Approved (� For only the work as described in: 1 j PERMIT NO. e _ PRQF See Letter to: Follow . N Attach ' 8110 Job Add r ` ess: [ �-924s �� ��z� l` �s T 21• �\ Cc: Robert Poskin, CBO (City of Tigard) ' R. PS -, 4) •