Loading...
Correspondence (625) September 20, 1999"' CIT1( OF Carlson Testing GREG ®N PO 23814 Tigard, Oregon 97223 PERMIT NO: BUP 1999 -00383 OWNER: Gale Nelson PROJECT ADDRESS: 14865 SW 74th PROJECT DESCRIPTION: Flex Office, warehouse and or manufacturing TYPES OF SPECIAL INSPECTION: As per Program attached The owner has notified us that he /she will retain your services to perform Special Inspections in accordance with the provisions of the State Building Code, permit documents and special inspection requirements. The owner or the owner's agent must also confirm with you that they have authorized you to do the special inspection work. As the regulatory agency, the City requires that you do the following: 1. Submit copies of all inspection reports promptly to the building division, Architect, engineer, and the contractor. 2. Maintain one copy of each field report at the job site. 3. Submit a final report at the completion of each category of work that you Inspect. (See UBC Appendix Chapter 13 for soils special inspection final report requirements.) If you fail to comply with the above requirements, there may be cause for the City to • revoke your authority as special inspector for this job. Should you have any questions, please call me at (503) 639 -4171 X 392. Sincerely, Ro ert D. Poskin, C.B.O. Senior Plans Examiner 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 4 . I � 0dl1j�p I F September 1, 1999 ' " CITY OF TIGAR Nelco Inc. OREGON 26262 S Meridian Rd Aurora, OR 97002 RE: Fanno Acres Business Park Building Plan Review 14865 SW 74th PC #: 7 -76c BUP #: 99 -00383 Submittal documents for the above referenced project have been reviewed for conformance with the applicable 1998 Oregon Specialty Codes and other applicable codes and standards. The following comments are noted: . =yr a:dr.„ �. .�eE>. 3,upu .:"t T .rliti LME2 •, 5° l ;;AIM Submit completed Energy Compliance Forms 2a, 3a, 3b, and 5a through 5c from Q ` 3° the April 1, 1996 Revised Oregon Energy Code. FIRE AND LIFE SAFETY r Ft " * t rte : /. t:`.nuW/ia„ ' -�3 �.. � . 4,lN Z . Provide exit illumination having an intensity of not less than 1 foot - candle at floor level with an automatic emergency power system, such as an on -site power ® o a generator or storage batteries, to operate the lighting system in the event the G,1 o1 premises wiring system fails [OSSC, Section 1003.2.9]. . Provide Type 2 -A fire extinguishers throughout so that the travel distance to an jr / .9 extinguisher does not exceed 75 feet [UFC Std. 10 -1]. .3 ?.tJ 0i Jt, ". /(u:''..U„l„ l.� .J.a < . , :9. a ., ,a-, -_ . Z r 1. UFC (TVFR) Appendix III.F — A building survey and plans shall be provided to the fire department. Forward the attached survey when completed to include a site plan and one set of architectural drawings to: Plans Examiner, City of Tigard, 13125 SW Hall Blvd., Tigard, OR 97223. The installation of piping from the city vault, and the backflow device shall be SIG installed by a licensed plumber. Installation, inspection and test shall be in �F accordance with NFPA 13. 3. ACCESS AND FIRE FIGHTING WATER SUPPLY DURING CONSTRUCTION: Approved fire apparatus access roadways and fire fighting water supplies shall be installed and operational prior to any other construction on the site or subdivision. (UFC Sec. 8704) 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 Fanno Acres Business Park Building Plan Review PC #: 7 -76c BUP #: 99 -003B3 Page #2 . STR CTURALto 1. We are unable to ascertain whether the roof structural elements have been designed to include the additional weight of the HVAC units. A. Submit the engineer's analysis of the roof structural members supporting the HVAC [OSSC, Section 106.3.2]. 2. When special inspection is required by OSSC, Section 1701, the architect or • engineer of record shall prepare an inspection program which shall be submitted for approval prior to a building permit being issued [OSSC, Section 106.3.5]. A. Submit an inspection program designating the work requiring special inspection, and the agency who will be responsible for conducting the inspections [OSSC, Section 106.3.5]. B. Complete the enclosed Structural Special Inspection form designating an Approved Testing Laboratory [Line B] and signed by the owner of the project [Line D]. The completed form must be returned to this office before a building permit can be issued. ii. Copies of all special inspection reports shall be filed with this office continually during construction. iii. A final signed report must be on file before the occupancy permit will be issued [OSSC, Section 1701.3]. 3. Your structural calculations appear not to have considered deformation compatibility. Provide details. OSSC, Section 1633.2.4. L i4`L INSPECTION REQUREMENTS . ` � , �a1i.. scnzair lit ar„�i, u�; �'a i r I �..,.:.. .re - ,,.0 , , �t.,'' � ., ��a ��. ..... _a .,l -mss;. You will be required to apply for a separate Certificate of Occupancy permit for each tenant space. The fee for this requirement is $25.00 for each Certificate of Occupancy. All tenant spaces must be finaled and signed off prior to any lessee moving in. Please submit three copies of revised submittal documents and a letter indicating your response to the above comments for review. Please call me at (503) 639 -4171 if you have any questions. Sincerely, 4 R o ert Poskin, CBO SENIOR PLANS EXAMINER I:1b ldg\p rm syslb u p99383. doc