Design Submittal (Revised)
Geopier Soil Reinforcement
AutoZone Store No. 3756
Tigard, Oregon
Dear Mr. Bramlitt:
This letter and the attached documents represent our design submittal for Geopier soil reinforcement at the
site of the proposed AutoZone retail store in Tigard, Oregon. The following paragraphs document our design
of the Geopier reinforcement system for support of spread footings and liquefaction mitigation at the site.
Geopier Reinforcement Design
Subsurface information as documented in the geotechnical report by Terracon (Project No. 82095068) has
been used as a basis for our design. Subsurface conditions generally consist of three to five feet of stiff
sandy silt fill, underlain by soft to stiff sandy silt and clayey silt. The silt layer is underlain by loose to very
loose, silty sand. Groundwater is present at about 12 feet below grade.
Geopier reinforcement has been designed to support spread footing foundations proportioned for a
maximum allowable bearing pressure of 4,000 pounds per square foot. We understand that column loads
range from 30 to 55 kips and wall loads range from 1.8 to 2.4 kips per lineal foot. The structural support will
be provided by installing 20 -inch diameter Geopier displacement elements at the locations shown on the
attached Geopier Foundation Plan. All piers will extend to a depth of 30 feet from original grade or to
penetration refusal if encountered in dense sand at shallower depths.
Geopier reinforcement has been designed to mitigate the potential for liquefaction within the depth of
improvement, 30 feet. Our design for liquefaction mitigation addresses two seismic conditions; an
earthquake magnitude of 6.8 and peak ground acceleration of 0.27g, and an earthquake magnitude of 9.0
and peak ground acceleration of 0.10g.
Based on our analyses a Geopier spacing of about 8 -feet on- centers is required to mitigate site liquefaction
under the design earthquake. A grid pattern of Geopier elements is placed throughout the building footprint
at about an 8 -foot spacing to mitigate site liquefaction throughout the building area. In addition, a row of
Geopier elements is placed outside of the building footprint to protect the perimeter foundation. The soil
reinforcement will be installed using the Impact Pier approach. This is a displacement method (does not
generate drill spoils) and results in about a 20 -inch diameter element. We estimate that liquefaction
induced settlements would be less than 1 -inch under the design earthquakes.
Geopier Northwest • 40 lake Bellevue, Suite 100 • Bellevue, WA 98005 • 425/646-2995 • Fax: 425/646 -3118
GE ®PIER Nor Inc. j aclopier
"The Alternative to Deep Foundations
We understand the building floor slab is designed as a slab on grade. Geopier reinforcement will provide
additional settlement control for the building floor slab and support the static floor slab loads. The floor slab
section has been designed by Wallace Engineering. We recommend that the slab control joints be aligned
with the Geopier elements.
Settlement
For our analysis, static foundation settlements are first calculated for a zone extending from the bottom of the
footing to the depth of pier penetration. The weighted modulus method (Bowles 1988) is used to estimate
settlement in the reinforced zone. This method is described in the Geotechnical Engineering Division /ASCE
publication "Control of Settlement and Uplift of Structures Using Short Aggregate Piers) by Dr. Evert C.
Lawton, Dr. Nathanial Fox, and Dr. Richard L. Handy. A Geopier modulus or stiffness of 125 pounds per
cubic inch (pci) was estimated for use in these calculations. The Geopier modulus will be verified by a load
test.
Additional settlement may occur in the "lower zone" or in the unimproved soil beneath the reinforced zone.
The lower zone settlement is calculated using an elastic approach. Based on our analyses, we estimate that
total static settlement will be less than 1 inch. Differential static settlement most likely will be less than Y
inch.
Geopier Installation
The Geopier reinforcement will be installed in accordance with the attached Specification for Displacement
Rammed Aggregate Pier Soil reinforcement, including a downward load test as outlined in Section 5.02 of
the specification. An experienced geotechnical engineer with Geopier Northwest will supervise the
installation and conduct the load test. We recommend that Terracon be retained to provide third -party
special inspection /monitoring services during installation of the Geopier reinforcement.
We appreciate the opportunity to work with you on this project. If you have any questions or require further
informa: please call.
: ' Sincerely,
eopier Northwest Inc.
Or
;� #_ I 4 G _ ---• -mes Joh son, P E.
' tV 0�
- tom` - O
Attachments: Geopier Foundation Plan, Sheet GP0.1- GP1.1
Specifications for Displacement Rammed Aggregate Pier Soil Reinforcement
cc: Mr. Brian Metcalfe, Geopier Foundation Company
Geopier Northwest • 40 Lake Bellevue, Suite 100 • Bellevue, WA 98005 • 425/646-2995 • Fax: 425/646 -3118
SPECIFICATIONS FOR DISPLACEMENT RAMMED AGGREGATE PIER SOIL
REINFORCEMENT
PART 1: GENERAL REQUIREMENTS
1.01 Description
Work shall consist of designing, furnishing and installing Displacement Rammed
Aggregate Pier elements to the lines and grades designated on the project
foundation plan and as specified herein. The Displacement Rammed Aggregate
Pier elements shall be constructed by driving a displacement mandrel to the
design depth and using the rammer head to ram thin lifts of aggregate into the
cavity created by the mandrel. The Displacement Rammed Aggregate Pier
elements shall be in a columnar -type configuration and shall be used to reinforce
soils for support for spread footing foundations.
1.02 Work Included
A. Provision of all equipment, material, labor, and supervision to design and
install Displacement Rammed Aggregate Pier elements. Design shall rely
on subsurface information presented in the project geotechnical report.
Layout of Displacement Rammed Aggregate Pier elements, footing
excavation, and subgrade preparation following Displacement Rammed
Aggregate Pier installation is not included.
B. Drawings and General Provisions of the Contract, including General and
Supplemental Conditions, and Division 1 Specifications, apply to the work
in this specification.
1.03 Approved Installers
A. Installers of Displacement Rammed Aggregate Pier Intermediate
Foundation Systems shall have a minimum of 5 years of experience with
the installation of Rammed Aggregate Pier and shall have completed at
least 50 projects.
B. Installers shall be licensed by Geopier Foundation Company, Inc. and
shall have demonstrated experience in the construction of similar size
and types of projects. The Displacement Rammed Aggregate Pier
Installer shall be approved by the Owner's Engineer and must be
approved two weeks prior to bid opening. The Installer shall adhere to all
methods and standards described in this Specification.
C. Installers currently approved for these works are:
1. Geopier Northwest, Inc. — Bellevue, WA
1.04 Related Work
A. Site Preparation
B. Foundations
C. Geotechnical Report and Recommendations
1.05 Reference Standards
A. Design
1. Lawton, E.C., Fox N.S. and Handy R.L. "Control of Settlement and
Uplift of Structures Using Short Aggregate Piers." ASCE.
Proceedings of In -Situ Deep Soil Improvement. ASCE National
Convention, Atlanta, Georgia. October 9 -13, 1994.
2. Lawton, E.C. and Fox N.S. "Settlement of Structures Supported on
Marginal or Inadequate Soils Stiffened with Short Aggregate Piers."
ASCE. Geotechnical Special Publication No. 40: Vertical and
Horizontal Deformations of Foundations and Embankments, ASCE 2,
962 -974.
3. Fox, N.S. and Cowell M. 1998. Geopier Reference Manual. Published
by Geopier Foundation Company, Inc., Scottsdale, AZ.
4. Wissmann, K.J., Lawton E.C. and Farrell T.M. 1999. "Behavior of
Geopier - Supported Foundation Systems During Seismic Events."
Technical Bulletin No. 1. Geopier Foundation Company, Inc.,
Scottsdale, AZ.
5. Wissmann, K.J. 1999. "Bearing Capacity of Geopier - Supported
Foundation Systems." Technical Bulletin No. 2. Geopier Foundation
Company, Inc., Scottsdale, AZ.
6. Wissmann, K.J., Caskey J.M. and FitzPatrick B.T. 2001. "Geopier
Uplift Resistance." Technical Bulletin No. 3. Geopier Foundation
Company, Inc., Scottsdale, AZ.
7. Wissmann, K.J., FitzPatrick B.T., and Lawton E.C. 2001. "Geopier
Lateral Resistance." Technical Bulletin No. 4. Geopier Foundation
Company, Inc., Scottsdale, AZ.
8. FitzPatrick, B.T. and Wissmann K.J. 2002. "Geopier Shear
Reinforcement for Global Stability and Slope Stability." Technical
Bulletin No. 5. Geopier Foundation Company, Inc., Scottsdale, AZ.
9. FitzPatrick, B.T., Wissmann, K.J. and White, D.J. 2003. "Geopier
Lateral Resistance" Technical Bulletin No. 6. Geopier Foundation
Company, Inc., Blacksburg, VA.
10. Miller, J., FitzPatrick, B.T. and Wissmann, K.J. 2003. "Seismic Site
Classification Improvement Using Geopier Soil Reinforcement"
Technical Bulletin No. 7. Geopier Foundation Company, Inc.,
Blacksburg, VA.
B. Modulus and Uplift Testing
1. ASTM D -1143 — Pile Load Test Procedures
2. ASTM D -1194 — Spread Footing Load Test
C. Materials and Inspection
1. ASTM D -1241 — Aggregate Quality
2. ASTM D -422 — Gradation Soils
1.06 Conflicts in Specifications /References
Where specifications and reference documents conflict, the Architect/Engineer
shall make the final determination of the applicable document.
1.07 Certifications and Submittals
A. The Installer shall submit construction drawings prepared by the
Displacement Rammed Aggregate Pier Designer (the Designer) to the
Owner or Owner's Engineer for approval at least one week(s) prior to the
start of construction. All plans shall be sealed by a Professional Engineer
in the State in which the project is constructed.
B. The Displacement Rammed Aggregate Pier Designer shall have Errors
and Omissions design insurance for the work. The insurance policy
should provide a minimum coverage of $2 million per occurrence.
C. Modulus test data - The Installer shall furnish the General Contractor a
description of the installation equipment, installation records, complete
test data, analysis of the test data and recommended design parameter
values based on the modulus test results. The report shall be prepared
under supervision of a registered professional engineer.
D. Daily Displacement Rammed Aggregate Pier Progress Reports — The
Installer shall furnish a complete and accurate record of Displacement
Rammed Aggregate Pier installation to the General Contractor. The
record shall indicate the pier location, length, volume of aggregate used,
densification forces during installation, and final elevations or depths of
the base and top of piers. The record shall also indicate the type and size
of the installation equipment used, and the type of aggregate used. The
Installer shall immediately report any unusual conditions encountered
during installation to the General Contractor, to the Designer and to the
Testing Agency.
1.08 Method of Measurement
A. Measurement of the Displacement Rammed Aggregate Pier elements is
on a per -pier basis.
B. Payment shall cover design and installation of the Displacement Rammed
Aggregate Pier Intermediate Foundation system. Excavation of
unsuitable materials, drilling obstructions, delays, and remobilization as
documented and approved by the Owner or Owner's Engineer shall be
paid for under separate pay items.
C. Quantities of piers, as shown on plans, may be increased or decreased at
the direction of the Owner or Owner's Engineer, based on construction
procedures and actual site conditions.
PART 2: PRODUCTS
2.01 Materials
A. Aggregate used for Displacement Rammed Aggregate Pier construction
shall be #57 stone, or shall be other open - graded aggregate with a
maximum nominal particle size of 1.5- inches and minimum nominal
particle size of 0.5- inches selected by the Installer and successfully used
in the modulus test. The aggregate must pass the flow rate tests
described in section 4.01 below.
B. The General Contractor will provide adequate and suitable marshalling
areas on the project site for the use of the Installer for the storage of
aggregate and equipment.
PART 3: DESIGN REQUIREMENTS
3.01 Displacement Rammed Aggregate Pier Design
A. The Displacement Rammed Aggregate Pier elements shall be designed
for a Displacement Rammed Aggregate Pier stiffness modulus of 125 pci.
The stiffness modulus value shall be verified by the results of the
Displacement Rammed Aggregate Pier modulus test, described in this
specification, and is based on a 20 -inch constructed diameter.
B. The Displacement Rammed Aggregate Pier Intermediate Foundation
system shall be designed in accordance with generally- accepted
engineering practice and the methods described in Section 1 of these
Specifications. The design shall meet the following criteria.
Maximum Allowable Bearing Pressure for Displacement
Rammed Aggregate Pier Reinforced Soils 4,000 psf
C. The design submitted by the Installer shall consider the bearing capacity
and settlement of all footings supported by Displacement Rammed
Aggregate Piers, and shall be in accordance with acceptable engineering
practice and these specifications. Total and differential settlement shall
be considered. The design life of the structure shall be 50 years.
D. The Displacement Rammed Aggregate Pier system shall be designed to
preclude plastic bulging deformations at the top -of —pier design stress.
The results of the modulus test shall be used to verify the design
assumptions.
PART 4: CONSTRUCTION
4.01 Installation of Demonstration Piers and Flow Test
The installer shall install a minimum of two initial "demonstration piers" to provide
project- specific construction procedures prior to installing production piers. The
demonstration pier installation shall be used to determine driving depths, the
thickness of the initial bottom lift, and procedures used to place the aggregate.
The results of the demonstration program shall be used to establish the site -
specific installation criteria for the installation of production piers.
If the Two -Step method is used, a Flow Test shall be performed to establish
mandrel extraction times. The Flow Test shall be performed as follows:
- The mandrel shall be installed to the design depth. A sacrificial or removable
tip shall be used at the bottom of the mandrel to facilitate penetration.
- The mandrel shall be filled with aggregate.
- The mandrel shall be lifted out of the ground quickly and moved so that the
aggregate may form a cone - shaped pile on the ground as the aggregate exits
the mandrel bottom.
- The flow of aggregate through bottom of the tamper head shall be observed
and timed. The aggregate flow rate shall be computed where flow rate =
volume /time.
- The aggregate flow rate observed during the Flow Rate test shall be used by
the installer to determine the appropriate mandrel lifting rate during initial
aggregate placement.
- Hammer impact operations and flow enhancers (compressed air or water)
within the mandrel may be used during the flow test, if necessary, to provide
a constant, uniform flow of aggregate. If used, the rate of water flow or
compressed air pressure shall be noted for implementation during production
pier installation. The production piers shall be installed using methods that
are consistent with the demonstration pier procedures.
The installation of the Demonstration Piers shall be observed and the details
recorded by the Installer's Control Technician.
4.02 Installation Procedures
A. A sacrificial or removable tip shall be installed at the bottom of the
mandrel prior to penetrating the mandrel into the ground.
B. The mandrel (and sacrificial tip) shall be pushed to the design depth using
crowd force and impact energy.
C. Aggregate shall be placed in the cavity. If the sidewalls of the cavity
remain stable when the mandrel is lifted, the aggregate may be placed by
pouring into the cavity from the ground surface. If the sidewalls of the
cavity cave during mandrel extraction, then the first lift of aggregate (to
the design installation depth) shall be placed through an opening at the
bottom of the mandrel.
D. The pier shall be constructed by placing aggregate in lifts that average
one foot in compacted thickness. A larger lift may be placed at the
bottom of the piers in caving soils provided that this construction
technique is verified by the results of the full scale modulus load test.
E. Each lift shall be compacted by driving the blunt bottom edge of the
mandrel downward using static crowd and vertical dynamic impact
energy.
F. If a hollow mandrel is used to place the aggregate, the mandrel shall be
lifted at a rate no faster than determined from the flow test.
G. Subsequent lifts shall be constructed following the same procedure
described above until the pier is constructed to the top of pier elevation.
H. Alternative lift heights and lowering depth, may be used as appropriate for
the project site upon approval by the Designer.
At the completion of the pier installation, the hammer shall be turned off
and the mandrel pushed downward applying crowd pressure on the top of
the pier to provide preloading.
4.03 Densification
A. Special high- energy impact densification apparatus shall be employed to
densify the Displacement Rammed Aggregate Pier elements during
installation. The apparatus shall apply direct vertical impact energy to
each constructed lift of aggregate.
B. Densification shall be performed using a blunt -ended and beveled
(tapered) tamper. The beveled tamper foot is required to adequately
increase the lateral earth pressure in the matrix soil during installation.
C. Downward crowd pressure shall be constantly applied to the tamper shaft
during tamping.
4.04 Plan Location and Elevation of Displacement Rammed Aggregate Pier
Elements
The center of each pier shall be within six inches of the locations indicated on the
plans. Piers installed outside of the above tolerances and deemed not
acceptable shall be rebuilt at no additional expense to the Owner, unless
mislocated by the General Contractor.
4.05 Rejected Displacement Rammed Aggregate Pier Elements
Displacement Rammed Aggregate Pier elements improperly located or installed
beyond the maximum allowable tolerances shall be abandoned or reinstalled with
new piers, unless the Designer approves other remedial measures. All material
and labor required to replace rejected piers shall be provided at no additional
cost to the Owner, unless the cause of the rejection is due to an obstruction or
mislocation.
PART 5: QUALITY CONTROL
5.01 Control Technician
The Installer shall have a full -time Control Technician to verify and report all
installation procedures. The Installer shall immediately report any unusual
conditions encountered during installation to the Design Engineer, the General
Contractor, and to the Testing Agency. The quality procedures shall include the
preparation of Displacement Rammed Aggregate Pier progress reports
completed during each day of installation and containing the following
information:
A. Footing and Displacement Rammed Aggregate Pier location.
B. Volume of aggregate used to form each pier (number of buckets)
C. Displacement Rammed Aggregate Pier installation depth.
D. Number of lifts.
E. Procedure to construct each lift
F. Planned and actual Displacement Rammed Aggregate Pier elevations at
the top and bottom of the element (based on installation depth).
G. Documentation of any unusual conditions encountered.
H. Aggregate description.
5.02 Modulus Test
A modulus test shall be performed to verify the parameter values selected for
design. The modulus tests shall be of the type and installed in a manner
specified herein.
A. Prior to or after the installation of the modulus test pier, a concrete cap
shall be placed over the test pier and embedded at the depth consistent
with the bottoms of the footings specified for the structure.
B. ASTM D -1143 general test procedures shall be used as a guide to
establishing load increments, load increment duration, and load
decrements.
C. With the exception of the load increment representing approximately
115% of the design maximum top of Displacement Rammed Aggregate
Pier stress, all load increments shall be held for a minimum of 15 minutes,
a maximum of 1 hour, and until the rate of deflection reduces to 0.01 inch
per hour, or less.
D. The load increment that represents approximately 115% of the design
maximum stress on the Displacement Rammed Aggregate Pier shall be
held for a minimum of 15 minutes, a maximum of 4 hours and until the
rate of deflection reduces to 0.01 inches per hour or less.
E. A seating load equal to 5 percent of the total load shall be applied to the
loaded steel plate prior to application of load increments and prior to
measurement of deflections to compensate for surficial disturbance.
F. Displacement Rammed Aggregate Pier modulus testing shall be
performed in accordance with the requirements outlined in the Design
Submittal.
G. The location of the Displacement Rammed Aggregate Pier modulus test
should be coordinated with the project Geotechnical Engineer of record.
H. The Displacement Rammed Aggregate Pier shall be installed in a manner
that will be consistently used throughout the project. The details of the
installation procedure shall be recorded by the Quality Control
representative as described above.
PART 6: QUALITY ASSURANCE
6.01 Independent Engineering Testing Agency
The Owner or General Contractor is responsible for retaining an independent
engineering testing firm to provide Quality Assurance services. The Testing
Agency should be the Geotechnical Engineer of Record, if possible.
6.02 Responsibilities of Independent Engineering Testing Agency
A. The Testing Agency shall monitor the modulus when modulus tests are to
be performed. The Installer shall provide and install all dial indicators and
other measuring devices.
B. The Testing Agency shall monitor the installation of Displacement
Rammed Aggregate Pier elements to verify that the production installation
practices are similar to those used during the installation of the modulus
test elements.
C. The Testing Agency shall report any discrepancies to the Installer
and General Contractor immediately.
PART 7: RESPONSIBILITIES OF GENERAL CONTRACTOR
7.01 Preparation
A. The General Contractor shall locate and protect underground and
aboveground utilities and other structures from damage during installation
of the Displacement Rammed Aggregate Pier elements.
B. The General Contractor will provide site access to the Installer, after
earthwork in the area has been completed.
C. Site subgrade shall be established by the General Contractor within 6
inches of final design subgrade, as approved by the Design Engineer.
D. A working surface will be established and maintained by the General
Contractor to provide wet weather protection of the subgrade and to
provide access for efficient operation of the Displacement Rammed
Aggregate Pier installation.
7.02 Layout of the Displacement Rammed Aggregate Pier Elements
The General Contractor shall provide layout (construction staking) of the
Displacement Rammed Aggregate Pier. The General Contractor shall provide
ground elevations in sufficient detail to estimate drilling depth elevations to within
2 inches.
7.03 Displacement Rammed Aggregate Pier Excavation
Should any obstruction be encountered during installation for Displacement
Rammed Aggregate Pier, the General Contractor shall be responsible for
removing such obstruction, or the pier shall be relocated or abandoned.
Obstructions include, but are not limited to, boulders, timbers, concrete, bricks,
utility lines, etc., that prevent installing the Displacement Rammed Aggregate
Piers to the required depth, or cause the Displacement Rammed Aggregate Pier
to drift from the required locations. Dense natural rock or weathered rock shall
not be deemed obstructions, and piers may be terminated short of design lengths
on such materials. If the General Contractor cannot or does not remove such
obstructions within one hour from the time the Installer reports the obstruction to
the General Contractor, the Installer may remove such obstructions with his own
means. Should this occur, the Installer shall receive an extra to the contract to
account for their additional expenses, including delay time involved to crew and
equipment.
7.04 Utility Excavations
The General Contractor shall coordinate all excavations made subsequent to
Displacement Rammed Aggregate Pier installations so that at least five feet of
horizontal distance remains between the edge of any installed Displacement
Rammed Aggregate Pier and the excavation. Protection of completed
Displacement Rammed Aggregate Pier elements is the responsibility of the
General Contractor. In the event that utility excavations are required at
horizontal distances of less than five feet from installed Displacement Rammed
Aggregate Piers, the General Contractor shall contact the Displacement
Rammed Aggregate Pier Designer to develop construction solutions to minimize
impacts on the installed Displacement Rammed Aggregate Piers.
Recommended procedures may include:
A. Replacing excavated soil with compacted crushed stone in the portions of
excavations where the Displacement Rammed Aggregate Pier have been
•
disturbed. The placement and compaction of the crushed stone shall
meet the following requirements.
1. The crushed stone shall meet the gradation specified by the Designer.
2. The crushed stone shall be placed in a controlled manner using
motorized impact compaction equipment.
3. The aggregate should be compacted to 95% of the maximum dry
density as determined by the modified Proctor method (ASTM D-
1557).
4. The Testing Agency shall be on site to observe placement,
compaction, and provide density testing. The test results shall be
submitted to the Designer and the General Contractor. The General
Contractor shall provide notification to the Testing Agency and the
Designer when excavation, placement, and compaction will occur and
arrange for construction observation and testing.
7.05 Footing Bottoms
A. Structural fill placed between the top of the Displacement Rammed
Aggregate Pier elements and the bottom of the footings shall be placed
and compacted in accordance with the Project Specifications for
structural fill. Observation and testing records by a third -party inspector
should be provided to Geopier Foundation Company.
B. Excavation and surface compaction of all footings shall be the
responsibility of the General Contractor.