Plans 11/28/2006 15:42 5032911613 PAGE 02/02
f \� ~,\ S/ y o' (CO &)
v .: LANDTCH
INCORPORATED
LT 1 Engineering • 5urveyfng • Planning
and Environmental t:onauftfng
November 28, 2006
Mr. Hap Watkins FILE COPY
City of Tigard
13125 SW Hall Blvd.
Tigard, Or. 97223
Fax (503) 624 -3681
Re: Final acceptance letter — Hornet Building on 74` Ave. /u/775- ` >) 74/77-7
S i 1 ,:::; D L 0 (d 3 0
Dear Hap:
Land Tech, Tnc. has performed a final site inspection on the construction of the water
quality facility for the above referenced project.
Based on our visual site inspection it appears that this sites water quality facility has been
constructed in substantial conformance with the approved plans.
if you have any further questions please feel free to give me a call at (503) 291 -9398
Sincerely,
�� Ss
Vu H. Nguyen, P.E. �G / a2
c � t 55000PE
" � t7REGON o"' 15 �G F?Y 1
EXPIRATION DATE: 12131 0 -
visit u5 at: www.landtecheop.com
0035 SW Canyon Lane • Suite ■402 • Portland, OR 97225 • Phone: (503) 291 -9398 • FAX: (503) 291 -161