Loading...
Report 11/05/10 FRI 08:18 FAX 503 670 9147 CARLSON TESTING 2002 SnieMOlike Roes I Off... C arison Tes , I nc. B < l .S NE G303 nBRilryRdG11 n (503) & a 3 F S 060Ma i S s OR 9nrc Pirate: 7o3J ae.�.,6o PAW., (Se) PO■1752 Phunc (SO 330.9155 Construction Materials Testin. & Ins.ection rrcrso3,aums< r aus)ra�139 Aar 15411330406 0 ()-00-20 Special Inspection FINAL SUMMARY LETTER November 4, 2010 T1003132 City of Tigard 13125 SW Hall Blvd Tigard, OR 97223 -8199 Attn: Building Department Re: Triangle Pointe 13333 SW 88 Parkway — Tigard, OR Permit# BUP2010 -00208 Dear Sir or Madam: This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special inspection of the following item(s) per our inspection reports only: Reinforced Concrete Structural Masonry All inspections and tests were performed and reported according to the requirements of Project Documents and, to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our reports pertain to the material tested /inspected only Information contained herein is not to be reproduced, except in full, without prior authorization from this office. Under all circumstances, the information contained in this report is provided subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information contained in this document If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING, INC. Mark R. Powlison Special Project Dept Manager MRP /ks cc: Deacon Development Group — Kendra Howell kendra.howellOdeacon.com •