Report FIRE ALARM SYSTEM FF 2 /o oc
RECORD OF COMPLETION
Name of protected property: Scholls Business Center - Building NPR
Address: 10340 SW Nimbus Ave, Portland OR 97223
Representative of protected property (name /phone): Laura Barry (503) 598 - 9980
Authority having jurisdiction: City of Tigard
Address /telephone number: 503 - 639 - 4171
1. Type(s) of System or Service
NFPA 72, Chapter 3 — Local
If alarm is transmitted to location(s) off premises, list where received:
NFPA 72, Chapter 3 — Emergency Voice /Alarm Service
Quantity of voice /alarm channels: Single: Multiple:
Quantity of speakers installed: Quantity of speaker zones:
Quantity of telephones or telephone jacks included in system:
NFPA 72, Chapter 6 — Auxillary
Indicate type of connection:
Local energy Shunt Parallel telephone
Location of telephone number for receipt of signals:
NFPA 72, Chapter 5 — Remote Station
Alarm:
Supervisory:
NFPA 72, Chapter 5 — Proprietary
If alarms are retransmitted to public fire service communications centers or others, indicate location and
telephone numbers of the organization receiving alarm:
Indicate how alarm is retransmitted:
NFPA 72, Chapter 5 — Central Station
Prime contractor: Action Technology Systems LLC
Central station location: Central Station Monitoring 503 - 231 -6625
Means of transmission of signals from the protected premises to the central station:
McCulloh Multiplex One -way radio
Digital alarm communicator ✓ Two -way radio Others
Means of transmission of alarms to the public fire service communications center:
(a)
(b)
System location:
(NFPA Record of Completion 1 of 4)
Organization name /phone Representative name /phone
Installer Action Technology Systems Steven A. Barry 503 - 231 -1992
Supplier AES Intellinet 1- 800 - 237 -6387
Service organization Action Technology Systems 503 - 231 -1992
Location of record (as- built) drawings: Action Tech Office
Location of owners manuals: N/A
Location of test reports: KG Office
A contract, dated 5 - - 2007 , for test and inspection in accordance with NFPA standard(s)
No(s). , dated , is in effect.
2. Record of System Installation
(Fill out after installation is complete and wiring checked for opens, shorts, ground faults, and improper
branching, but prior to conducting operational acceptance tests.)
This system has been installed in accordance with the NFPA standards as shown below, was inspected
b Charlie Hoglund on 10 - - , includes the devices shown below, and has been in service
since 10 - -
✓ NFPA 72, Chapters 1 2 3 4 5 6 7 (circle all that apply)
✓ NFPA 70, National Electrical Code, Article 760
V Manufacturer's instructions
_ Other (specify):
Signed: � � Date: 10 - - 2010
Organization: ion t Systems LLC
3. Record of System Operation
All operational features and functions of this system were tested by'alevir on 10 - -
and found to be operating properly in accordance with the requirements of:
✓ NFPA 72, Chapters 1 2 3 4 5 6 7 (circle all that apply)
NFPA 70, National Electrical Code, Article 760
✓ Manufacturer's instructions
Other (specify):
Signed: Date: 10 - - 2010
Organization: Action Technology Systems LLC
4. Alarm - Initiating Devices and Circuits
Quantity and class of initiating device circuits (see NFPA 72, Table 3 -5) Quantity: Style: Class:
MANUAL
(a) Manual stations Noncoded, activating Transmitters Coded
(b) Combination manual fire alarm and guard's tour coded stations
AUTOMATIC
Coverage: Complete: Partial:
(a) 3 Smoke detectors Ion X Photo
(b) Duct detectors Ion Photo
(c) Heat detectors FT RR FT/RR RC
(NFPA Record of Completion 2 of 4)
icf
(d) 3 Sprinkler waterflow switches: Transmitters Noncoded, activating Coded
(e) Other (list):
5. Supervisory Signal- Initiating Devices and Circuits (use blanks to indicate quantity of devices)
GUARD'S TOUR
(a) Coded stations
(b) Noncoded stations, activating transmitters
(c) Compulsory guard tour system comprised of transmitter stations and
intermediate stations
Note: Combination devices are recorded under 4(b) and 5(a).
SPRINKLER SYSTEM
(a) Coded valve supervisory signaling attachments
Value supervisory switches, activating transmitters
(b) Building temperature points
(c) Site water temperature points
(d) Site water supply level points
Electric fire pump:
(e) Fire pump power
(f) Fire pump running
(g) Phase reversal
Engine - driven fire pump:
(h) Selector in auto position
(i) Engine or control panel trouble
(j) Fire pump running
Engine - driven generator:
(k) Selector in auto position
(1) Control panel trouble
(m) Transfer switches
(n) Engine running
Other supervisory function(s) (specify):
6. Alarm Notification Appliances and Circuits
Quantity and class (see NFPA 72, Table 3 - 7) of notification appliance circuits connected to the system:
Types and quantities of notification appliances installed: Quantity: Style: Class:
(a) Bells Inch
(b) Speakers
(c) Horns
(d) Chimes
(e) Other:
(NFPA Record of Completion 3 of 4)
(0 Visual signals Type:
with audible w/o audible
(g) Local annunciator
7. Signaling Line Circuits
Quantity and class (see NFPA 72, Table 3 - 6) of signaling line circuits connected to system:
Quantity: Style: Class:
8. System Power Supplies
(a) Primary (main): Nominal voltage: Current rating:
Overcurrent protection: Type: Fused Current rating:
Location:
(b) Secondary (standby):
Storage battery: Amp -hour rating:
Calculated capacity to drive system, in hours: 24 60
Engine- driven generator dedicated to fire alarm system:
Location of fuel storage:
(c) Emergency or standby system used as backup to primary power supply, instead of using a secondary
power supply:
Emergency system described in NFPA 70, Article 700
Legally required standby system described in NFPA 70, Article 701
Optional standby system described in NFPA 70, Article 702, which also meets the performance
requirements of Article 700 or 701
9. System Software
(a) Operating system software revision level(s):
(b) Application software revision level(s):
(c) Revision completed by:
(name) (firm)
•
10. Comments:
�� u r�rl �� -y 10 -21 -2010
(signed) foreentr s tion or alarm service company or installation contractor /supplier (title) (date)
Frequency of routine tests and inspections, if other than in accordance with the referenced NFPA standard(s):
System deviations from the referenced NFPA standard(s) are:
r7
(signed) o r -astral station or alarm service company or installation contractor /supplier (title) (date)
Upon co etion of (s) satisfactory test(s) witnessed (if required by the authority having jurisdiction):
� 10 -21 -2010
(signed) repres••.tati of the authority having jurisdiction (title) (date)
(NFPA Record of Completion 4 of 4)