Loading...
Report e up21- 0 02-'-/( 4060 linear SC, NE Bend OR Carlson Testing, Inc. �68� BR1157 6 Office 0-9155 Fa (503) 684-0954 Far. (5031589 -1309 Fat (5411 330-9163 Construction Materials Testing & Inspection Special Inspection FINAL SUMMARY LETTER November 12, 2010 TI003132A City of Tigard 13125 SW Hall Blvd Tigard, OR 97223 -8199 Attn: Building Department Re: Triangle Pointe — Generator Attachment 13333 SW 68 Parkway — Tigard, OR Permit# BUP2010 -00240 Dear Sir or Madam: This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special inspection of the following item(s) per our inspection reports only: Installation of Expansion Anchors All inspections and tests were performed and reported according to the requirements of Project Documents and, to the best of our knowledge, the work was in conformance w ith the approved plans and specifications, approved change orders _ and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. Under all circumstances, the information contained in this report is provided subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information contained in this document. If there ar= any further questions regarding this matter, please do not hesitate to contact this office. Respec ly submitted, CARLS TESTING, INC. Jame- - : ietpas Proj- Manager J s c Deacon Development Group — Kendra Howell kendra.howell @deacon.com