Loading...
Report 08/14/09 FRI 12:15 FAX 503 670 9147 CARLSON TESTING ea x 002 1. i; . • I Motu Met GLm 011ie, 19 M One Carlson Testing, Inc. lZounLOR 97223 40M' Mdmn 00.930 317 630.`.i 109770 kdill TipenL OR 9T.� GJmt 0077301 Ur>wl. (41 97707 Awn, (3031 r8J. 4(0 Mnv 6031)8Y-1W i0wnr. 13411330.9133 Few I(041 6114091e ten•naD '1391.1119 lu IUD 330-9143 Construction Materials Testing & Inspection Special Inspection FINAL SUMMARY LETTER August 14, 2009 T0909656 City of Tigard 13125 SW Hall Blvd Tigard, OR 97223 -8199 • Attn: Building Department Il Re: Westside Academy — Tumbling Pit 11632 SW Pacific Hwy — Tigard, OR Permit No.: BUP2009 -0008A Dear Sir or Madam: • • This is to certify that in accordance with Section 1,7.04.1.2 of the International Building Code, we have performed special inspection of the following item(s) per our inspection reports only: Reinforced Concrete • All inspections and tests were performed and reported according to the requirements of Project Documents and, to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING, INC. • • Keith R. Gauvin • • Project Manager REC FIVFr KRG /rb • AUG 2 7 2009 • CITY OF TIGARD cc: Exceed Builders — Mike Brandis BUILDING DIVIS�Of' City of Tigard Building Division Delson Design & Engineering Inc — John Delson Bear Creek Design — Wade McGilvra • • • • Main Office Salrn, Offer Rend Office Carlson Testing Inc. Ileumker 4060 Hudson Sl_ Ali 630150 /1 Riley Rd =11 7ignrd. OR 97213 Snleni, ON 97301 Rend, OR 77701 Plume: G039 l,3d -34611 Phony /5037 539 -/151 Moll, (541133(1-9155 Fe, ii Od1684 -0954 Far- (5031589 -1309 4ac r41/ 330 -9163 Construction Materials Testing & Inspection ‘ a . ,102Od vvoc� Special Inspection FINAL SUMMARY LETTER August 14, 2009 T0909656 City of Tigard 13125 SW Hall Blvd Tigard, OR 97223 -8199 Attn: Building Department Re: Westside Academy — Tumbling Pit 11632 SW Pacific Hwy — Tigard, OR Permit No.: BUP2009-0008X !� Dear Sir or Madam: This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special inspection of the following item(s) per our inspection reports only: Reinforced Concrete All inspections and tests were performed and reported according to the requirements of Project Documents and, to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING, INC. Keith Gauvin Project Manager KRG /rb cc: Exceed Builders — Mike Brandis City of Tigard Building Division Delson Design & Engineering Inc — John Delson Bear Creek Design — Wade McGilvra