Construction Materials Testing & Inspection
Special Inspection
FINAL SUMMARY LETTER
August 14, 2009
T0909656
City of Tigard
13125 SW Hall Blvd
Tigard, OR 97223 -8199
•
Attn: Building Department Il
Re: Westside Academy — Tumbling Pit
11632 SW Pacific Hwy — Tigard, OR
Permit No.: BUP2009 -0008A
Dear Sir or Madam:
•
•
This is to certify that in accordance with Section 1,7.04.1.2 of the International Building Code, we have performed special
inspection of the following item(s) per our inspection reports only:
Reinforced Concrete •
All inspections and tests were performed and reported according to the requirements of Project Documents and, to the
best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders
and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's
design changes, approvals and verbal instructions.
Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in
full, without prior authorization from this office.
If there are any further questions regarding this matter, please do not hesitate to contact this office.
Respectfully submitted,
CARLSON TESTING, INC.
•
•
Keith R. Gauvin • •
Project Manager
REC FIVFr
KRG /rb • AUG 2 7 2009
• CITY OF TIGARD
cc: Exceed Builders — Mike Brandis
BUILDING DIVIS�Of'
City of Tigard Building Division
Delson Design & Engineering Inc — John Delson
Bear Creek Design — Wade McGilvra
•
•
•
•
Main Office Salrn, Offer Rend Office
Carlson Testing Inc. Ileumker 4060 Hudson Sl_ Ali 630150 /1 Riley Rd =11
7ignrd. OR 97213 Snleni, ON 97301 Rend, OR 77701
Plume: G039 l,3d -34611 Phony /5037 539 -/151 Moll, (541133(1-9155
Fe, ii Od1684 -0954 Far- (5031589 -1309 4ac r41/ 330 -9163
Construction Materials Testing & Inspection
‘ a . ,102Od vvoc�
Special Inspection
FINAL SUMMARY LETTER
August 14, 2009
T0909656
City of Tigard
13125 SW Hall Blvd
Tigard, OR 97223 -8199
Attn: Building Department
Re: Westside Academy — Tumbling Pit
11632 SW Pacific Hwy — Tigard, OR
Permit No.: BUP2009-0008X !�
Dear Sir or Madam:
This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special
inspection of the following item(s) per our inspection reports only:
Reinforced Concrete
All inspections and tests were performed and reported according to the requirements of Project Documents and, to the
best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders
and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's
design changes, approvals and verbal instructions.
Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in
full, without prior authorization from this office.
If there are any further questions regarding this matter, please do not hesitate to contact this office.
Respectfully submitted,
CARLSON TESTING, INC.
Keith Gauvin
Project Manager
KRG /rb
cc: Exceed Builders — Mike Brandis
City of Tigard Building Division
Delson Design & Engineering Inc — John Delson
Bear Creek Design — Wade McGilvra