FIELD OBSERVATION REPORT N0. 1
Project: Engineer: Contractor:.
Canterbury Woods Repair Bldg 6 Douglas S. Meltzer P,E. Horizon Restoration
Location: Date: Time:
a SW 109' Ave., Tigard, OR 3 -2 -07 9:30 am
Client: � �G��b Engineering Inspector: Job supt.
Horizon Restoration Cameron T. Carroll F,E. Bill Stevens
CONTRACT ITEM;
{A) SITE WORK {D) GENERAL BLDG CONSTRUCTION (G) FINISHES
(B} FOUNDATIONS (E) GENERAL MECH CONSTRUCTION (H) CLEAN -UP
(C) CONCRETE {F) ELECTRIC (J) GENERAL REMARKS
D: Onsite to observe the installation of a sister truss to a fire damaged truss at Canterbury Woods
Condominiums Building #6. It was requested by the City of Tigard that continuous inspection of
the application of the liquid nails LN601 be performed by our office.
Our observations noted the following;
o (2) beads of liquid nails LN &01 with 10d common nails at 6 inches on center were
used to sister the new manufactured truss to the existing fire damaged manufactured
truss. The fire damaged truss had been sanded prior to the application of adhesive,
The adhesive beads were applied continuous and all work observed appeared to be
in accordance with the construction documents.
If you have any questions or comments about the information provided in this report please feel free to
contact our office at 503 - 399 -1399.
Sinc -' I ' /
Cameron T. Carroll F.E.
BMGP Engineers, Inc
CC: Mark VanDomelen City of Tigard Building Department