Loading...
Report ���� r ., • � Cify of '!°igard building Depar�rt'ent 13 SW Hall Blvd., Tigard, OR 97223 Phone: (503) 639 -4171 Re -Roof i're- [nspection� Report dorm ,_._.i;� �''��1�1'��� ��V Requested by Telephone J ) � Job Address Permit #: Roof Access Location Date Requested Time Requested Type of ErisGng Roof �� �,(�� 1. Slope of roof deck S � J � U � ; 2. Roof/Penetrations /General Conditions it ❑Poor 3. Are there blisters? �s ❑ No 4. Are there cracks? , �� es ❑ No ' 5. Is there evidence of water ponding? es ❑ No 6. Is moisture present under roofing (leak)? ❑Yes 7. Is roof insulation existing? Yes ❑ No 8. Is roof insulation wet? ❑Yes �Alo 9. Property line setbacks on all sides > 10 feet Yes ❑ No 10. Building size ❑ < 3000 sq. ft ,6000 sq. ft ❑> 6000 sq. ft. 11. Building height �< 2 Stories ❑ > 2 Stories 12. Class of roof requirQd '❑ N -rated ❑ A. ❑ g. �; C� 13. Type roof deck -/ `�: Combustible ❑Non - Combustible 14. Roof drains �► Provided ❑Required, ❑Adequate 15. Overflow drains 1 � • � vided ❑Required � ❑Adequate 16. Attic ventilation ❑Provided ❑Required ❑Adequate 17..Roof listing �i: 'rovided ❑Required 18. Installation Instructions �' 'rovided ❑Required T�� � oof this structure the following con ' 'ons m t f;e met: � s �? The re -roof proposal is c pproved for permit issuance if the conditions listed above are met After obtaining your permit you must contact the Building Division for an inspection when the roof deck is ready for the first inspecfion. The first inspection for a complete tear off is the deck inspection. For abuilt -up roofing system (overlay), the first inspection is at the start of the job. After the re -roof is complete, a final inspection is required. /���� �. Inspector �'� (�. G� Ext. ?i`��'f Date ��l � �� ��