Report , I . , , _ eop2a-10— oo34-1
City of Tigard Building Department
13125 SW Hall Blvd., Tigard, OR 97223 Phone: (503) 639 -4171
Re -Roof Pre -Ins ection. Re ort Form A. .
� a ,
Requested by 9 ' ( Telephone( )
Job Address 1 ( 9 S# c (�1 PC. -- Permit #:
Roof Access Location r i l C312
Date Requested 6 6,, Time Requested i
.0
Type of Existing Roof On LT l5P 0 C -t��s� v „47- I 1 . Slope of roof deck rt ( \ `-�
2. Roof/Penetrations /General Conditions air '\
❑Poor
3. Are there blisters? es ❑ No
4. Are there cracks? ^� 2 7
cks . ❑ Yes LSO >
5. Is there evidence of water ponding? es ❑ 6V1 No / l l'A f ) 6. Is moisture present under roofing (leak)? ❑ Yes to
7. Is roof insulation existing? ❑ Yes No
8. Is roof insulation wet? ❑ Yes to
9. Property line setbacks on all sides > 10 feet es ❑ No
10. Building size _ 30 . ft ❑ < 6000 sq. ft ❑> 6000 sq. ft.
11. Building height 0-("2 vies ❑ > 2 Stories
12. Class of roof required on -rated Q A. ❑ B. ❑ C.
13. Type roof deck ombustible ❑ Non -Co buslible _
f
14. Roof drains ❑ Provided equ red dequate
15. Overflow drains ❑ Provided equired ❑ Adequate
i
16. Attic ventilation ❑ Provided ❑ R uired Ade
17. Roof listing ❑ Provided D R ired
18. Installation Ins ions ❑ Provided Required
To re -roof tbis tyr,icture the following conditions must be met:
3r 6()E f ((7v) k$ 70 F— � 1QS )k)
v L
r -5 f PC�Z�I 7 i Ike
�� --
'��'
•
The re -roof proposal Val _ .. roved for permit issuance if the conditions listed above are met. After obtaining ,. i r permit you must contact the
Building Division for inspection when the roof deck is ready for the first inspection. The first inspection for a complete tear off is the deck
inspection. For a built -up roofing system (overlay), the first inspection is at the pt.eklie-ie% ' � After the re -roof is complete, a final inspection is
required. t-e-� ti �
Inspector Ext.2-ka3 Date 7(/ j /.4'