Loading...
Correspondence 0,2038 - MAYES TESTING ENGINEERS, INC Lynnwood Office 20225 Cedar Valley Road Suite 110 Lynnwood, WA 98036 ph 425.742.9360 fax 425.745.1737 Tacoma Office MTE No: P08227 10029 S. Tacoma Way Suite E-2 Project: Costco- Tigard #111 Racking Installation Tacoma, WA 98499 Address: 7850 SW Dartmouth, Tigard, OR ph 253.584.3720 Permit No.: BUP 2008 -00314 City of Tigard fax 253.584.3707 Portland Office 7911 NE 33rd Drive Suite 190 Portland, OR 97211 Owner: Costco #111 ph 503.281.7515 Engineer: fax 503.281.7579 Architect: Contractor: Key Mechanical Page: 15 Date: March 17, 2009 Weather: Indoors Inspection: Adhesive Anchor, Expansion Anchor Samples: none MTE inspector arrived on site for the epoxy dowels placement for the existing freezer thermal break removal trench patch slab on grade at G- J/10 -11. The contractor placed #4 rebar into 4 minimum embedment by 5/8" diameter properly cleaned holes using sufficient Hilti HIT HY 150 epoxy, ICC #1593, lot #095622L2, expiration 7/08. Dowels in place prior to placement of approximately 12 cubic yards of concrete. MTE inspector also performed inspection of wedge anchor placement for the racking systems placed at lines 9.5, 10, 10.5 & 11 /G -J (10.5 line not done). The contractor placed Hilti KB-TZ % x 5 %" bolts, Model #387S14, ICC EST 1917, Lot #000010981938 per rack manufacturer's instructions ((2) per base post on alternate sides) and torqued to the anchor manufacturer's specification of 40 ft -Ibs using MTE torque wrench #P267. Holes were drilled %" diameter by 4" minimum embedment and vacuumed out sufficiently for anchor placement. To the best of our knowledge, items inspected this date are in accordance with approved plans and specifications. INSPECTOR: Philip Lundberg OBOA # 399 ro REVIEWED BY: ‘ff..„,/ w Mark A. alusha, P.E. c: Bill Zorn-s — Key Mech/nical Building • icial —City of Tigard MAYES TESTING ENGINEERS, INC. Lynnwood Office 20225 Cedar Valley Road Suite 110 �F. Lynnwood, WA 98036 ph 425.742.9360 fax 425.745.1737 Tacoma Office MTE No: P08227 1oo2ss. Tacoma Way Suite E -2 Project: Costco- Tigard #111 Racking Installation Tacoma, WA 98499 Address: 7850 SW Dartmouth, Tigard, OR ph 253.584.3720 fax 253.584.3707 Permit No.: BUP 2008 -00314 City of Tigard Portland Office 7911 NE 33rd Drive Suite 190 Portland, OR 97211 Owner: Costco #111 ph 503.281.7515 fax 503.281.7579 Engineer: Architect: Contractor: Key Mechanical Page: 14 Date: March 12, 2009 Weather: Clear Inspection: Expansion Anchors Samples: none MTE inspector arrived on site for the scheduled wedge anchor placement for the new P.O.S. freezer racking system hold downs, Hilti KB -TZ 1 /2" x 512 ", model #387S14, ICC ESR 1917, lot #000010981938. Wedge anchors were placed per the rack manufacturer's instructions (2) per base post on alternate sides and torqued to the anchors manufacturer's specification of 40 ft -Ibs using MTE torque wrench #P267. Holes were drilled 1 /2" diameter by 4" minimum embedment and vacuumed out sufficiently for anchor placement. To the best of our knowledge, items inspected this date are in accordance with approved plans and specifications. INSPECTOR: Philip Lundberg OBOA # 399 REVIEWED BY: Mark A. Ga sha, P.E. c: Bill Zorne. — y Mechan .I Building "flip al —City of T .ard