Report csi..... DAILY FIELD REPO ' T I, 7 REDMOND F 4111 / GEOTECHNICAL CZ , 9 Permit # SIT2009_`0'0001 r 1 I SERVICES A O 7° JOB NO. /� PO Box 20547 • PORTLAND. OREGON 97294 APR G {� 1001.005 • li FAX 503/286-7176 • PHONE 503/285 -0598 n��1GPRD 6t, pgGE OF o`�D��� 1 PROJECT NAME CLIENT OR OWNER SEQUENCE NO. Dutch Brothers Multi /Tech Engineering 15 GENERAL LOCATION OF WORK OWNER OR CLIENTS REPRESENTATIVE DATE DAY OF WEEK 11746 SW Pac Hwy Ryan Hawkins 4/13/09 Monday GENERAL CONTRACTOR GRADING CONTRACTOR PROJECT ENGINEER Dalke C.G. Gredvig TYPE OF WORK GRADING CONTRACTOR'S SUPERENTENDANT OR FOREMAN SUPERVISOR Street Base Rock SOURCE AND DESCRIPTION OF FILL MATERIAL WEATHER TECHNICIAN Import 3/4 -inch minus crushed rock I Showers Daniel Redmond KEY PERSONS CONTACTED (Civil Engr.. Architect, Developer. etc.) FIELD TESTING REFERENCE CURVE TEST NUMBER ELEVATION MOISTURE DRY MAXIMUM COMP. M'°`DRYUM REMARKS TEST LOCATION CONTENT DENSITY DRY CURVE DENSITY Access Road ( %) (PCF) DENSITY NO' (PCF) 23 East End FBG 5.5 135.3 96.3 3 140.5 24 Middle 5.1 134.9 96.0 II 25 West End II 5.2 134.4 95.7 It It Drive Through 26 E. of Bldg Pad FBG 5.6 135.9 96.7 3 140.5 27 S. of Bldg Pad II 4.9 133.8 95.2 It II 28 W. of Bldg Pad II 5.1 134.9 96.0 II t, DESCRIBE EQUIPMENT USED FOR HAULING. SPREADING. WATERING. CONDITIONING. AND COMPACTING As requested, arrived on -site this morning to check the compaction of the aggregate base rock materials across the existing access road which is to be repaved as well as the main drive through lane for the coffee building pad area. All field density tests taken today were found to exceed 95 percent of D -1557 (T -180) test procedures. Paving is set for tomorrow morning. COPY GIVEN TO: City, ODOT, Contractor Engineer REPORTED BY: Daniel Redmond DAILY FIELD REPORT :mp REDIVI®NID Permit # SIT2009 -00001 GEOTECHNICAL SERVICES JOB NO. SERVICES 1001. 005. C PO BOX 20547 • PORTLAND. OREGON 97294 FAX 503/286 -7176 • PHONE 503/285 -0598 PAGE OF 1 1 PROJECT NAME CLIENT OR OWNER SEQUENCE NO. Dutch Brothers Multi /Tech Engineering 16 GENERAL LOCATION OF WORK OWNER OR CUENTS REPRESENTATIVE DATE DAY OF WEEK 11746 SW Pac Hwy Ryan Hawkins 4/14/09 _ Tuesday GENERAL CONTRACTOR GRADING CONTRACTOR PROJECT ENGINEER Dalke H & H Paving TYPE OF WORK GRADING CONTRACTOR'S SUPERENTENDANT OR FOREMAN SUPERVISOR Paving SOURCE AND DESCRIPTION OF FILL MATERIAL WEATHER TECHNICIAN Class "C" Asphalt (Knife River) _ Cloudy Daniel Redmond KEY PERSONS CONTACTED (Civil Engr.. Architect, Developer. etc.) FIELD TESTING REFERENCE CURVE TEST NUMBER ELEVATION MOISTURE DRY MAXIMUM DRY MAXIMUM REMARKS TEST LOCATION CONTENT DENSITY DRY CURVE DENSITY (%) (PCF) DENSITY NO. (PCF) 29 Hammer Head FG NA 140.1 92.2 "C "mix 152.0 30 Access Dr /West FG NA 140.9 92.7 " 't 31 Access Dr /North FG NA 141.5 93.1 " " 32 Access Dr /East FG NA 141.1 92.8 " 't DESCRIBE EQUIPMENT USED FOR HAULING, SPREADING, WATERING, CONDITIONING, AND COMPACTING As requested, arrived on -site today to check the compaction of the top lift of asphalt paving materials across the ODOT Right of Way areas along the existing access drive and hammer head entering into the coffee site. Field desnity tests taken today and compared to the Rice Gravity value provided by the oaving contractor were found to meet or exceed 92 percent as required. City, Contractor, Engineer, ODOT Daniel Redmond COPY GIVEN TO: REPORTED BY: