Report 03/30/09 MON 13:32 FAX 503 670 9147 CARLSON TESTING 1i002
t /arl►- )milnJIestlii �nc. Rl u,i U.(J"a .Sarmr Office BmJO�n
R97t]J'7 OR :IAYI 4060 Hudmn.St, NR GrU13 US HilcrRJ �Jf
4V�ar.t, OR 5 Sulam OR 97301 Urml, UH !1770:
P4nn.; 00.940 -.,16U P■unr: (503)SR0 -1:51 !'lunge, r .ti)33U -'l1SS
Rn.• nuli 0xr 141+4 Frv: (503) SR9 -1404 lull.'(. +9 - - ?1(i
Construction Materials Testing & Inspection
Special Inspection h'" OQA3
FINAL SUMMARY LETTER
March 30, 2009
CTI Job #T0705635C
City of Tigard Building Division
13125 SW Hall Blvd
Tigard, OR 97223 -8199
Attn: Building Department
Re: Mountain View Estates — Lot 14
12420 SW St. Andrews Lane — Tigard, OR
Permit No: MST2006 -00328
Dear Sir or Madam:
This is to certify that in accordance with Section 1704A.2 of the International Building Code, we have performed special
inspection of the following item(s) per our inspection reports only:
Installation of Adhesive Anchors
All inspections and tests were performed and reported according to the requirements of Project Documents and, to the
best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders
and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's
design changes, approvals and verbal instructions.
Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in
full, without prior authorization from this office. Under all circumstances, the information contained in this report is
provided subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No
party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information
contained in this document.
If there are any further questions regarding this matter, please do not hesitate to contact this office.
Respectfully submitted,
CARLSON TESTING, I , C.
Neil S. Sha non
Project Manager
NSS /Ih
cc: City of Tigard Building Division
John Finklea Architects — John Finklea