Report (35) Carlson Testing, Inc. - constructio I & Related Tests
9 Geotechnical Consulting
Main Office Salem Office Bend Office
P.O. Box 23814 4060 Hudson Ave.. NE P.O. Box 7918
Tigard, Oregon 97281 Salem, Oregon 97301 Bend, Oregon 97708
Phone(503)684 -3460 Phone(503)589 -1252 Phone (541) 330 -9155
Fax (503) 684 -0954 Fax (503) 589 -1309 Fax (541) 330 -9163
REPORT OF 4 X 8 CONCRETE TEST SPECIMENS 5/'- ,26U -
Test Methods: ASTM C31 /C172/C192/C39/C1064/C231/C143
Date Molded: 01/20/2009 Job Number: T0807926.A
Permit #: SIT2008 -00004 (SITEWORK)
Client: PFAFFLE OFFICE LLC & PCCC LLC — ROGER STALICK
Project: PACIFIC CROSSROADS CORPORATE CENTER — BUILDING A
Address: 7920 SW PFAFFLE STREET TIGARD OR Jurisdiction: TIGARD
Contractor: COMMERCIAL CONTRACTORS INC — ERIC MONEY
Subcontractor: SHARP & ASSOCIATES Cast By: J. BLACK
Concrete Supplier: GLACIER NORTHWEST
Truck #: 7400 Load #: 1 Ticket#: 205724
Weather: SUNNY Test Time: 11:20 Air Temp. at Sampling Time: 43
Cylinders were cast for the following locations:
EAST END OF WORK
Total Concrete Placement Location:
CURB AND GUTTER ON SOUTH SIDE OF PFAFFLE STREET. 240' SEGMENT ADJACENT TO
BUILDINGS A & B.
Strength Requirement: 3000 psi fc @ 28 Days Slump: 3.250" % Air: 6. 40 %
Mix Number: 08805 (3.3K) Conc. Temp: 6 5 Cement Type: 1/11 Max Agg: 1 "
Admix/Amt: 92 OZ /CUBIC YARDS CALCIUM CHLORIDE 9 OF 12
Cubic Yards:
Register Number: 0089360 Lab Location: TIGARD
Set Test @ Date Test Total A rea Unit Type Of Tested
No. Days Rec'd Date Load PSI Fracture By
1A 7 01/21/2009 01/27/2009 48911 12.57 3890 2 WR
1B 28 01/21/2009 02/17/2009
1C 28 01/21/2009 02/17/2009
1D 28 01/21/2009 02/17/2009
❑ Distribute attachments. Average f c @ 28 days
Please see reverse side for additional information.
Job Number: T0807926.A Register Number: 0089360 Date Molded: 01/20/2009
Project: PACIFIC CROSSROADS CORPORATE CENTER — BUILDING A
7
< 1 in. [25 mm]
x , ,
1 1
Type 1 Type 2 Type 3
Reasonable well - formed Well- Formed cone on one Columnar vertical cracking
cones on both ends, less end, vertical cracks running through both ends, no
than 1 in. [25 mm] of through caps, no well - defined well - formed cones
cracking through caps cone on other end
/
Type 4 Type 5 Type 6
Diagonal fracture with Side fractures at top or Similar to Type 5 but
no cracking through bottom (occur commonly end of cylinder is pointed
ends; tap with hammer to with unbonded caps)
distinguish from Type 1
Asterisked ( *) average unit PSI test results did not meet listed acceptance criteria.
Remarks:
•
PFAFFLE OFFICE LLC & PCCC LLC - ROGER STALICK STALICKCO @EARTHLINK.NET
TO: CITY OF TIGARD BUILDING DIVISION
AFGHAN ASSOCIATES INC - CRAIG HARRIS CRAIGH @AAIENG.COM
MILDREN DESIGN GROUP - BETTY SHEPPARD BETTY @MDGPC.COM
COMMERCIAL CONTRACTORS INC - ERIC MONEY ERIC @CCIGC.COM
Project Manager: STEVEN W. LEACH
Reviewed By: Ty Toller On 01/28/2009
Our report pertains to the material tested only. The information contained in this report is provided subject to all terms and
conditions of CTI's General Conditions in effect at the time this report is prepared. No party other than those to whom
CTI has distributed this report shall be entitled to use or rely upon the information contained in this document.
Main Office Salem Office Bend Office
P.O. Box 23814 4060 Hudson Ave., NE P.O. Box 7918
Carls Tigard, Oregon 97281 Salem, OR 97301 Bend, OR 97708
®� ���iLLL ������ 1J� T}� �� Phone (503) 684 -3460 P9 -122 P41) 330 155
FAX (503) 684 0954 FAX (503) 589 -1309 FAX (541) 330 -9163
January 22, 2009
T0807926.B
Permit No. BUP2008 -00004
FIELD INSPECTION REPORT
DATES COVERED: January 20, 2009
PROJECT: Pacific Crossroads Corporate Center — Building B
ADDRESS: 8020 SW Pfaffle Street — Tigard, OR
INSPECTOR: J. Black — COP #708, WABO #BLA644018, OBOA #392, ICBO #1071296 -88
01- 20 -09: CTI representative was on site & met with John Sproull of Commercial Contractors
Inc & left a copy of this report on site at the conclusion of the inspection.
Tested portion of 12 cubic yards of Glacier mix #0885 (3300 /psi f'c) was placed by chute at the
following area for a 3000 /psi spec.
• Curb & gutter on south side of Pfaffle St, 240' segment adjacent Buildings A & B.
Cast (1) set of (4) 4" x 8" cylinders. Slump spec was 4" max & Air spec was 4 -7 %. Test results
on break sheet.
** *CHECK ONE BOX ONLY * ** YES NO
1. This is a preliminary inspection only. — OR — ❑
2. The work inspected conforms to acceptance criteria listed above. If "No," the portions of the
work that are non - conforming items are dearly stated above and will be added to the NCL.
Remaining portions of the work, which are not preliminary in nature, are to be considered as ® ❑
conforming.
Our reports pertain to the material tested /inspected only. Information contained herein is not to
be reproduced, except in full, without prior authorization from this office.
If there are any further questions regarding this matter, please do not hesitate to contact this
office.
Respectfully submitted,
CARLSON TESTING, INC.
teven W
Project Manager
JB /ja
cc: Pfaffle Office LLC & PCCC LLC — Roger Stalick stalickco @earthlink.ne[
City of Tigard Building Division
Afghan Associates Inc — Craig Harris cr,mffi@a,,enn.com
Mildren Design Group — Betty Sheppard hetty@mdgpc.com
• Commercial Contractors Inc — Eric Money eric @ccigc.com
Bend Office (541) 330 -9155
Geotechnical Office (503) 601 -8250
Carls ssi�1L �}+�pp Testing- Eugene Office (541) 345 -0289
on �es��Ilg Inc Salem Office (503) 589 -1252
�9 Tigard Office (503) 684 -3460
all- 2c6 S -' 9 cam
REPORT OF 4 X 8 CONCRETE TEST SPECIMENS
Test Methods: ASTM C31/ C172 /C192/C39/C1064/C231/C143/C1231
Date Molded: 01/20/2009 Job Number: T0807926.A
Permit #: SIT2008 -00004 (SITEWORK)
Client: PFAFFLE OFFICE LLC & PCCC LLC — ROGER STALICK
Project: PACIFIC CROSSROADS CORPORATE CENTER — BUILDING A
Address: 8020 SW PFAFFLE STREET TIGARD OR Jurisdiction: TIGARD
Contractor: COMMERCIAL CONTRACTORS INC — ERIC MONEY
Subcontractor: SHARP & ASSOCIATES Cast By: J. BLACK
Concrete Supplier: GLACIER NORTHWEST
Truck #: 7400 Load #: 1 Ticket#: 205724
Weather: SUNNY Test Time: 11:20 Air Temp. at Sampling Time: 43
Cylinders were cast for the following locations:
EAST END OF WORK
Total Concrete Placement Location:
CURB AND GUTTER ON SOUTH SIDE OF PFAFFLE STREET. 240' SEGMENT ADJACENT TO
BUILDINGS A & B.
Strength Requirement: 3000 psi f c@ 28 Days Slump: 3.250" °/u Air: 6.40%
Mix Number: 08805 (3.3K) Conc. Temp: 65 Cement Type: i /II Max Agg: 1"
Admix/Amt: • 92 OZ /CUBIC YARDS CALCIUM CHLORIDE 9 OF 12
Cubic Yards:
Register Number: 0089360 Lab Location: TIGARD
Set Test @ Date Test Total Area Unit Type Of Cap Tested
No. Days Rec'd Date Load PSI Fracture Type By
1A 7 01/21/2009 01/27/2009 48911 12.57 3890 2 WR
1B 28 01/21/2009 02/17 /2009 64400 12.60 5110 3 PAD 60 MEM
1C 28 01/21/2009 02/17/2009 66800 12.60 5300 4 PAD 60 MEM
1D 28 01/21/2009 02/17 /2009 66400 12.60 5270 3 PAD 60 MEM
❑ Distribute attachments. Average f c @ 28 days 5230
Please see reverse side for additional information.
Job Number: T0807926.A Register Number: 0089360 Date Molded: 01/20/2009
Project: PACIFIC CROSSROADS CORPORATE CENTER — BUILDING A
< 1 in. [25 mm]
) \
Type 1 Type 2 Type 3
Reasonable well - formed Well- Formed cone on one Columnar vertical cracking
cones on both ends, less end. vertical cracks running through both ends, no
than 1 in. [25 mm] of through caps, no well - defined well- formed cones
cracking through caps cone on other end
Type 4 Type 5 Type 6
Diagonal fracture with Side fractures at top or Similar to Type 5 but
no cracking through bottom (occur commonly :nd of cylinder is pointed
ends: tap with hammer to with unbonded caps)
distinguish from Type 1
Asterisked ( *) average unit PSI test results did not meet listed acceptance criteria.
Remarks:
PFAFFLE OFFICE LLC & PCCC LLC - ROGER STALICK STALICKCO @EARTHLINK.NET
TO: CITY OF TIGARD BUILDING DIVISION
AFGHAN ASSOCIATES INC - CRAIG HARRIS CRAIGH @AAIENG.COM
MILDREN DESIGN GROUP - BETTY SHEPPARD BETTY @MDGPC.COM
COMMERCIAL CONTRACTORS INC - ERIC MONEY ERIC @CCIGC.COM
Project Manager: STEVEN W. LEACH
Reviewed By: Ty Toller On 02/18/2009
Our report pertains to the material tested only. The information contained in this report is provided subject to all terms and
conditions of CTI's General Conditions in effect at the time this report is prepared. No party other than those to whom
CTI has distributed this report shall be entitled to use or rely upon the information contained in this document.
Bend Office (541) 330 -9155
Geotechnical Office (503) 601 -8250
Carls
y� Testing; Inc Eugene Office (541) 345 -0289
on Tes ing 9 1 0.• Salem Office (503) 589 -1252
Tigard Office (503) 684 -3460
REPORT OF 4 X 8 CONCRETE TEST SPECIMENS
Test Methods: ASTM C31/ C172 /C192/C39/C1064/C231/C143/C1231
Date Molded: 02/11/2009 Job Number: T0807926.A
Permit #: BUP2008 -00004
Client: PFAFFLE OFFICE LLC & PCCC LLC — ROGER STALICK
Project: PACIFIC CROSSROADS CORPORATE CENTER — BUILDING A
Address: 8020 SW PFAFFLE STREET TIGARD OR Jurisdiction: TIGARD
Contractor: COMMERCIAL CONTRACTORS INC — ERIC MONEY
Subcontractor: SHARP Cast By: J. BLACK
Concrete Supplier: GLACIER NORTHWEST
Truck #: 7355 Load #: 1 Ticket#: 208257
Weather: OVERCAST Test Time: 11:05 Air Temp. at Sampling Time: 45
Cylinders were cast for the following locations:
SAME AS BELOW _
Total Concrete Placement Location:
CURB AND GUTTER ON SOUTH SIDE OF PFAFFLE ST ADJECENT BUILDING A —B FROM 15' TO
150' WEST OF EAST END REPLACES PORTION OF CURB AND GUTTER PLACED ON 1/20/09
Strength Requirement: 3000 psi f c@ 28 Days Slump: 2.750" % Air: 5.80%
Mix Number: 08805 ( Conc. Temp: 56 Cement Type: I /11 Max Agg: 3/
Admix/Amt: 80 OZ /YD CALCIUM CHLORIDE 7.5
Cubic Yards:
Register Number: 0089678 Lab Location: TIGARD
Set Test @ Date Test Total Area Unit Type Of Cap Tested
No. Days Rec'd Date Load PSI Fracture Type By
I 7 02/12/2009 02/18/2009 46385 12.60 3680 2 PAD 60 WR
28 02/12/2009 03/11/2009
28 02/12/2009 03/11/2009
28 02/12/2009 03/11/2009
Distribute attachments. Average f c @ 2 8 days
Please see reverse side for additional information.
Job Number: T0807926.A Register Number: 0089678 Date Molded: 02/11/2009
Project: PACIFIC CROSSROADS CORPORATE CENTER — BUILDING A
< 1 in. [25 mm]
12 \ f
Type 1 Type 2 Type 3
Reasonable well - formed Well- Formed cone on one Columnar vertical cracking
cones on both ends, less end, vertical cracks running through both ends, no
than 1 in. [25 mm] of through caps, no well - defined well - formed cones
cracking through caps cone on other end
\ .
Type 4 Type 5 Type 6
Diagonal fracture with Side fractures at top or Similar to Type 5 but
no cracking through bottom (occur commonly 2nd of cylinder is pointed
ends; tap with hammer to with unbonded caps)
distinguish from Type 1
Asterisked ( *) average unit PSI test results did not meet listed acceptance criteria.
Remarks:
PFAFFLE OFFICE LLC & PCCC LLC - ROGER STALICK STALICKCO @EARTHLINK.NET
TO: CITY OF TIGARD BUILDING DIVISION
AFGHAN ASSOCIATES INC - CRAIG HARRIS CRAIGH @AAIENG.COM
MILDREN DESIGN GROUP - BETTY SHEPPARD BETTY @MDGPC.COM
COMMERCIAL CONTRACTORS INC - ERIC MONEY ERIC @CCIGC.COM
Project Manager: STEVEN W. LEACH ,.
Reviewed By: Ty Toller On 02/19/2009
Our report pertains to the material tested only. The information contained in this report is provided subject to all terns and
conditions of CTI's General Conditions in effect at the time this report is prepared. No party other than those to whom
CTI has distributed this report shall be entitled to use or rely upon the information contained in this document.