Loading...
Specifications A Certification Project - Location: Pac Sun @ Washington Square - Tigard, Oregon aD0 -d4 6 - So age The data presented in this report is a record of system measurements and final adjustments that have been obtained in accordance with the current edition of the NEBB Procedural Standards for Testing, Adjusting, and Balancing of Environmental Systems. Any variances from design quantities, which exceed NEBB tolerances, are noted in the Test- Adjust - Balance Report Project Summary. Significant or noteworthy remarks are noted on the General Remarks or on individual test reports. Noted deficiencies are not the TAB firms responsibility to repair. Prior to issuance of this report, Deficiency Reports are forwarded to our contracted agent. Warranty is limited to one year from date of this report. Within that time, any descrepancies, ambiguities, or omissions found in this report will be retested, adjusted, or balanced as needed. A written notification will be required. Submitted and Certified by NEBB TAB Firm: Accurate Balancing Agency, Inc. Certification: 3177 Expiration Date: March 31, 2011 Certification Date: March 30, 2010 Signed and Sealed by NEBB Supervisor: Edward M. May Jr. le Q ' q � nVrk ` • A4 I 3177 14: Exp 131/11 / 'rtrnn --- Accurate Balancing Agency, Inc. Page 2 of 9 Supervisor. Edward M. May Jr. A : A Terms and Abbreviations Project - Location: Pac Sun @ Washington Square - Tigard, Oregon AC Air Conditioning Unit AH Air Handler AHU Air Handling Unit BHP Brake Horsepower BMS Building Management System BTUH British Thermal Units per Hour CEF Ceiling Exhaust Fan CFM Cubic Feet per Minute CRU Computer Room Unit DB Dry Bulb DDC Direct Digital Control EAT Entering Air Temperature EWT Entering Water Temperature EF Exhaust Fan EG Exhaust Grille (Shown as Triangled number on indexed plans) ERU Energy Recovery Unit FPB Fan Powered Box (Terminal Unit which incorporates a fan) FSD Fire / Smoke Damper GPM Gallons per Minute Head Pressure Difference across the entering and leaving side of a pump HRU Heat Recovery Unit HVAC Heating Ventilation and Air Conditioning HZ Hertz Inches( ") Inches of water gauge K Correction factor to the free area needed to calculate CFM LAT Leaving Air Temperature LWT Leaving Water Temperature N/A Not Applicable N/L Note Listed OBD Opposed Blade Damper OAD Outside Air Damper OD Outside Diameter OSA Outside Air Damper PSI Pounds per Square Inch RA Return Air RG Return Grille (Shown as a Circled number on indexed plans) RPM Revolutions Per Minute RTU Roof Top Unit SA Supply Air SG Supply Grille (Shown as a Standard number on indexed plans) SFA Service Factor Amperage TAB Test; Adjust; and Balance VAV Variable Air Volume (Terminal Unit which regulates airflow) VEL Velocity WB Web Bulb Accurate Balancing Agency, Inc. Page 3 of 9 Supervisor Edward M. May Jr. ABIA Instrument Calibration Report Project - Location: Pac Sun @ Washington Square - Tigard, Oregon Instrument Manufacturer 1 Model # 1 Serial # _ I Calibrated I, Cal. Due Type Tachometer UEI DPM5 21109672 I 10/16/2009 I 10/16/2010 Rotation Thermometer UEI 550B N/A I 10/16/2009 1 10/16/2010 Immersion Thermometer UEI 550E N/A I 10/16/2009 I 10/16/2010 Air Temp Electrical UEI I DL389 I 90501731 I 10/16/2009 I 10/16/2010 Multimeter Manometer Shortridge I ADM -860 I M91491 I 10/14/2009 I 10/14/2010 Air Pressure Hygro - Thermometer Extech RH490 I 8089524 I 10/30/2009 I 10/30/2010 Humidity Anemometer UEI I DAFM2 I 8810692 I 10/16/2009 I 10/16/2010 Air Velocity Flowhood Shortridge I ADM -860 I M91491 I 10/14/2009 I 10/14/2010 Air Volume Thermometer UEI ATT47 probe 90501731 I 10/16/2009 I 10/16/2010 Contact Hydrometer Alnor / TSI I HM680 I 70552168 I 10/22/2009 I 10/22/2010 Differential Pressure 1 1 1 Accurate Balancing Agency, Inc. Page 4 of 9 Supervisor: Edward M. May Jr. AS A General Remarks and Summary • Project - Location: Pac Sun @ Washington Square - Tigard, Oregon 1) See specific remarks on forms within. Accurate Balancing Agency, Inc. Page 5 of 9 Supervisor: Edward M. May Jr. FAN POWERED TERMINAL TEST REPORT Project Pac Sun @ Washington Square - Tigard, Oregon Date 3/2612010 Submittal Test Data FPB Terminal Terminal Type FPB Size DDC Address Cal. Factor Fan Speed VAV -1 Parallel 12 "R N/A N/A Potentiometer VAV -2 Parallel 12 "R N/A N/A Potentiometer VAV -3 Parallel 12 "R N/A N/A Potentiometer I Remarks I Accurate Balancing Agency, Inc. Page 6 of 9 Supervisor: Edward M. May Jr. AB A Air Outlet Test Report Project - Location: Pac Sun @ Washington Square - Tigard, Oregon Technician: Jonathan Rehm Test Date: 3/26/2010 System / Unit Design Preliminary Final Test Area Served # Size Type I AK VEL I CFM y_Eld CFM VEL CFM VAV -1 Maximum West Side Retail 1 6 "R SG 1.00 50 50 125 125 50 50 100% West Side Retail 2 6 "R SG 1.00 50 50 80 80 50 50 100% West Side Retail 3 6 "R SG 1.00 50 50 120 120 50 50 100% West Side Retail 4 10"R SG 1.00 350 350 310 310 360 360 103% West Side Retail 5 10"R SG 1.00 350 350 370 370 360 360 103% West Side Retail 6 10'R SG 1.00 350 350 390 390 375 375 107% West Side Retail 7 10"R SG 1.00 400 400 270 270 375 375 94% Total 1600 1665 1620 101% VAV -1 1 Total - -- 1.00 470 470 455 455 455 455 97% Minimum Total 470 455 455 97% VAV -1 1 Total -- 1.00 1100 1100 1030 1030 1030 1030 94% Fan Total 1100 1030 1030 ` 94% Remarks: I Accurate Balancing Agency, Inc. Page 7 of 9 Supervisor: Edward M. May Jr. ABA Air Outlet Test Report Project - Location: Pac Sun @ Washington Square - Tigard, Oregon Technician: Jonathan Rehm Test Date: 3/26/2010 System / Unit Design Preliminary Final Test Area Served # Size Type AK VEL CFM VEL CFM VEL CFM VAV -2 Maximum East Side Retail 1 6 "R SG 1.00 50 50 85 85 50 50 100% East Side Retail 2 6 "R SG 1.00 50 50 125 125 50 50 100% East Side Retail 3 6 "R SG 1.00 50 50 75 75 50 50 100% East Side Retail 4 10 "R SG 1.00 350 350 380 380 325 325 93% East Side Retail 5 10 "R SG 1.00 350 350 400 400 330 330 94% East Side Retail 6 10 "R SG 1.00 350 350 365 365 315 315 90% East Side Retail 7 10 "R SG 1.00 400 400 415 415 365 365 91% Total 1600 1845 1485 93% VAV -2 1 Total - -- 1.00 470 470 500 500 500 500 106% Minimum Total 470 500 500 106% VAV -2 1 Total - -- 1.00 1100 1100 1142 1142 1142 1142 104% Fan Total 1100 '1142 1142 104% Remarks: I Accurate Balancing Agency, Inc. Page 8 of 9 Supervisor: Edward M. May Jr. A :6I A Air Outlet Test Report Project - Location: Pac Sun @ Washington Square - Tigard, Oregon Technician: Jonathan Rehm Test Date: 3/26/2010 System / Unit Design Preliminary Final Test Area Served # Size Type AK VEL CFM VEL CFM VEL CFM % VAV -3 Maximum Hallway 1 6 "R SG 1.00 100 100 110 110 110 110 110% Back Room 2 12x6 SG 0.31 645 200 701 217 669 207 104% Back Room 3 12x6 SG 0.31 645 200 600 186 711 220 110% Back Room 4 12x6 SG 0.31 484 150 233 72 524 162 108% Back Room 5 12x6 SG 0.31 645 200 701 217 612 190 95% Back Room 6 12x6 SG 0.31 484 150 114 35 465 144 96% Back Room 7 12x6 SG 0.31 645 200 472 146 631 196 98% Back Room 8 12x6 SG 0.31 645 200 643 199 646 200 100% Back Room 9 12x6 SG 0.31 645 200 548 170 669 207 104% Total 1600 1354 1637 102% VAV -3 1 Total -- 1.00 470 470 505 505 505 505 107% Minimum Total 470 505 505 107% VAV -3 1 Total — 1.00 1100 1100 1156 1156 1156 1156 105% Fan Total 1100 1156 1156 105% Remarks: 1 Accurate Balancing Agency, Inc. Page 9 of 9 Supervisor: Edward M. May Jr.