Specifications A Certification
Project - Location: Pac Sun @ Washington Square - Tigard, Oregon aD0 -d4 6 - So
age
The data presented in this report is a record of system measurements and final
adjustments that have been obtained in accordance with the current edition of the NEBB
Procedural Standards for Testing, Adjusting, and Balancing of Environmental Systems.
Any variances from design quantities, which exceed NEBB tolerances, are noted in the
Test- Adjust - Balance Report Project Summary.
Significant or noteworthy remarks are noted on the General Remarks or on individual
test reports.
Noted deficiencies are not the TAB firms responsibility to repair. Prior to issuance of this
report, Deficiency Reports are forwarded to our contracted agent.
Warranty is limited to one year from date of this report. Within that time, any
descrepancies, ambiguities, or omissions found in this report will be retested, adjusted,
or balanced as needed. A written notification will be required.
Submitted and Certified by
NEBB TAB Firm: Accurate Balancing Agency, Inc.
Certification: 3177
Expiration Date: March 31, 2011
Certification Date: March 30, 2010
Signed and Sealed by
NEBB Supervisor: Edward M. May Jr.
le
Q '
q � nVrk ` • A4 I
3177
14: Exp 131/11 /
'rtrnn ---
Accurate Balancing Agency, Inc. Page 2 of 9 Supervisor. Edward M. May Jr.
A : A Terms and Abbreviations
Project - Location: Pac Sun @ Washington Square - Tigard, Oregon
AC Air Conditioning Unit
AH Air Handler
AHU Air Handling Unit
BHP Brake Horsepower
BMS Building Management System
BTUH British Thermal Units per Hour
CEF Ceiling Exhaust Fan
CFM Cubic Feet per Minute
CRU Computer Room Unit
DB Dry Bulb
DDC Direct Digital Control
EAT Entering Air Temperature
EWT Entering Water Temperature
EF Exhaust Fan
EG Exhaust Grille (Shown as Triangled number on indexed plans)
ERU Energy Recovery Unit
FPB Fan Powered Box (Terminal Unit which incorporates a fan)
FSD Fire / Smoke Damper
GPM Gallons per Minute
Head Pressure Difference across the entering and leaving side of a pump
HRU Heat Recovery Unit
HVAC Heating Ventilation and Air Conditioning
HZ Hertz
Inches( ") Inches of water gauge
K Correction factor to the free area needed to calculate CFM
LAT Leaving Air Temperature
LWT Leaving Water Temperature
N/A Not Applicable
N/L Note Listed
OBD Opposed Blade Damper
OAD Outside Air Damper
OD Outside Diameter
OSA Outside Air Damper
PSI Pounds per Square Inch
RA Return Air
RG Return Grille (Shown as a Circled number on indexed plans)
RPM Revolutions Per Minute
RTU Roof Top Unit
SA Supply Air
SG Supply Grille (Shown as a Standard number on indexed plans)
SFA Service Factor Amperage
TAB Test; Adjust; and Balance
VAV Variable Air Volume (Terminal Unit which regulates airflow)
VEL Velocity
WB Web Bulb
Accurate Balancing Agency, Inc. Page 3 of 9 Supervisor Edward M. May Jr.
ABIA Instrument Calibration Report
Project - Location: Pac Sun @ Washington Square - Tigard, Oregon
Instrument Manufacturer 1 Model # 1 Serial # _ I Calibrated I, Cal. Due
Type
Tachometer UEI DPM5 21109672 I 10/16/2009 I 10/16/2010
Rotation
Thermometer UEI 550B N/A I 10/16/2009 1 10/16/2010
Immersion
Thermometer UEI 550E N/A I 10/16/2009 I 10/16/2010
Air Temp
Electrical UEI I DL389 I 90501731 I 10/16/2009 I 10/16/2010
Multimeter
Manometer Shortridge I ADM -860 I M91491 I 10/14/2009 I 10/14/2010
Air Pressure
Hygro - Thermometer Extech RH490 I 8089524 I 10/30/2009 I 10/30/2010
Humidity
Anemometer UEI I DAFM2 I 8810692 I 10/16/2009 I 10/16/2010
Air Velocity
Flowhood Shortridge I ADM -860 I M91491 I 10/14/2009 I 10/14/2010
Air Volume
Thermometer UEI ATT47 probe 90501731 I 10/16/2009 I 10/16/2010
Contact
Hydrometer Alnor / TSI I HM680 I 70552168 I 10/22/2009 I 10/22/2010
Differential Pressure
1 1 1
Accurate Balancing Agency, Inc. Page 4 of 9 Supervisor: Edward M. May Jr.
AS A General Remarks and Summary
•
Project - Location: Pac Sun @ Washington Square - Tigard, Oregon
1) See specific remarks on forms within.
Accurate Balancing Agency, Inc. Page 5 of 9 Supervisor: Edward M. May Jr.
FAN POWERED TERMINAL TEST REPORT
Project Pac Sun @ Washington Square - Tigard, Oregon Date 3/2612010
Submittal Test Data
FPB Terminal Terminal Type FPB Size DDC Address Cal. Factor Fan Speed
VAV -1 Parallel 12 "R N/A N/A Potentiometer
VAV -2 Parallel 12 "R N/A N/A Potentiometer
VAV -3 Parallel 12 "R N/A N/A Potentiometer
I Remarks I
Accurate Balancing Agency, Inc. Page 6 of 9 Supervisor: Edward M. May Jr.
AB A Air Outlet Test Report
Project - Location: Pac Sun @ Washington Square - Tigard, Oregon
Technician: Jonathan Rehm Test Date: 3/26/2010
System / Unit Design Preliminary Final Test
Area Served # Size Type I AK VEL I CFM y_Eld CFM VEL CFM
VAV -1 Maximum
West Side Retail 1 6 "R SG 1.00 50 50 125 125 50 50 100%
West Side Retail 2 6 "R SG 1.00 50 50 80 80 50 50 100%
West Side Retail 3 6 "R SG 1.00 50 50 120 120 50 50 100%
West Side Retail 4 10"R SG 1.00 350 350 310 310 360 360 103%
West Side Retail 5 10"R SG 1.00 350 350 370 370 360 360 103%
West Side Retail 6 10'R SG 1.00 350 350 390 390 375 375 107%
West Side Retail 7 10"R SG 1.00 400 400 270 270 375 375 94%
Total 1600 1665 1620 101%
VAV -1 1 Total - -- 1.00 470 470 455 455 455 455 97%
Minimum Total 470 455 455 97%
VAV -1 1 Total -- 1.00 1100 1100 1030 1030 1030 1030 94%
Fan Total 1100 1030 1030 ` 94%
Remarks: I
Accurate Balancing Agency, Inc. Page 7 of 9 Supervisor: Edward M. May Jr.
ABA Air Outlet Test Report
Project - Location: Pac Sun @ Washington Square - Tigard, Oregon
Technician: Jonathan Rehm Test Date: 3/26/2010
System / Unit Design Preliminary Final Test
Area Served # Size Type AK VEL CFM VEL CFM VEL CFM
VAV -2 Maximum
East Side Retail 1 6 "R SG 1.00 50 50 85 85 50 50 100%
East Side Retail 2 6 "R SG 1.00 50 50 125 125 50 50 100%
East Side Retail 3 6 "R SG 1.00 50 50 75 75 50 50 100%
East Side Retail 4 10 "R SG 1.00 350 350 380 380 325 325 93%
East Side Retail 5 10 "R SG 1.00 350 350 400 400 330 330 94%
East Side Retail 6 10 "R SG 1.00 350 350 365 365 315 315 90%
East Side Retail 7 10 "R SG 1.00 400 400 415 415 365 365 91%
Total 1600 1845 1485 93%
VAV -2 1 Total - -- 1.00 470 470 500 500 500 500 106%
Minimum Total 470 500 500 106%
VAV -2 1 Total - -- 1.00 1100 1100 1142 1142 1142 1142 104%
Fan Total 1100 '1142 1142 104%
Remarks: I
Accurate Balancing Agency, Inc. Page 8 of 9 Supervisor: Edward M. May Jr.
A :6I A Air Outlet Test Report
Project - Location: Pac Sun @ Washington Square - Tigard, Oregon
Technician: Jonathan Rehm Test Date: 3/26/2010
System / Unit Design Preliminary Final Test
Area Served # Size Type AK VEL CFM VEL CFM VEL CFM %
VAV -3 Maximum
Hallway 1 6 "R SG 1.00 100 100 110 110 110 110 110%
Back Room 2 12x6 SG 0.31 645 200 701 217 669 207 104%
Back Room 3 12x6 SG 0.31 645 200 600 186 711 220 110%
Back Room 4 12x6 SG 0.31 484 150 233 72 524 162 108%
Back Room 5 12x6 SG 0.31 645 200 701 217 612 190 95%
Back Room 6 12x6 SG 0.31 484 150 114 35 465 144 96%
Back Room 7 12x6 SG 0.31 645 200 472 146 631 196 98%
Back Room 8 12x6 SG 0.31 645 200 643 199 646 200 100%
Back Room 9 12x6 SG 0.31 645 200 548 170 669 207 104%
Total 1600 1354 1637 102%
VAV -3 1 Total -- 1.00 470 470 505 505 505 505 107%
Minimum Total 470 505 505 107%
VAV -3 1 Total — 1.00 1100 1100 1156 1156 1156 1156 105%
Fan Total 1100 1156 1156 105%
Remarks: 1
Accurate Balancing Agency, Inc. Page 9 of 9 Supervisor: Edward M. May Jr.