Report •
— �' r I
Alain Office sn/e n off ee send Ofyee 0
Carlson Testing Inc. 84305N'Hun_lker 4060 /fud oa Sl AE Rend OB R,7r0 Rd q//
Nord. 4 3 0 S OR 9I? 23 Salem OR 97301 Bend, OR 97702
Phone: (503)6,34-3460 Phone. (503) 589 -1252 Phone: (541)330 -9155
Far: (5031 084-0954 Far: 1503, 509 -1309 08,154/)330 -0/07
Construction Materials Testing & Inspection
Special Inspection
FINAL SUMMARY LETTER
December 14, 2009
T0901252
RECEN
City of Tigard AN 7 2010
13125 SW Hall Blvd
Tigard, OR 97223 -8199 CI -� OF TIGNBD
Attn: Building Department
BUILDING DIVISION
Re: Westgate Baptist Church — Stage Extension
1,0.730_SW 1.30t Avenue — Tigard, OR
Permit No.: BUP2009 -00155
Dear Sir or Madam:
This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special
inspection of the following item(s) per our inspection reports only:
Reinforced Concrete
Installation of Cast in Place Anchors
Structural Welding
All inspections and tests were performed and reported according to the requirements of Project Documents and, to the
best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders
and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's
design changes, approvals and verbal instructions.
Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in
full, without prior authorization from this office. Under all circumstances, the information contained in this report is
provided subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No
party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information
contained in this document.
If there are any further questions regarding this matter, please do not hesitate to contact this office.
Respectfully submitted,
CARLSON TESTING, INC.
Steven W. Leach
C
Project Manager
SWL /rb
cc: vDuttons Remodeling — Brian Dutton 503 524 -4560
City of Tigard Building Division
Bradford Conrad Crow Engineering Co 503 213 -2018
Carlson Testing, Inc.
Incompleted Items List (NCL)
Dec 14, 2009
T0901252.
Project Name: WESTGATE BAPTIST CHURCH - STAGE EXTENSION
Project Address: 10730 SW 130TH AVENUE TIGARD OR
Pertnit No: BUP2009 -00155
P.O. No: Project Manager: STEVEN W . LEACH
Item # Insp. Date Item Description Compliance CTI Sign -Off Date
Corrected
1 BT 10/23/2009 ALL WELDS FAB SHOP PAINTED FOR STAGE ASSEMBLIES ACCEPTABLE PER STEVEN W. LEACH 12/14/2009
TOP AND BOTTOM. ENGINEER'S LETTER DATED
11/17/2009.
2 BT 10/23/2009 NO MATERIAL CERTIFICATIONS AT TIME OF INSPECTION. ACCEPTABLE PER STEVEN W. LEACH 12/14/2009
ENGINEER'S LETTER DATED
11/17/2009.
3 BT 10/23/2009 NO FAB SHOP SPECIAL INSPECTIONS PERFORMED AT ACCEPTABLE PER STEVEN W. LEACH 12/14/2009
SCHUON MANUFACTUERING CO INC (SMCI), COEURD' ENGINEER'S LETTER DATED
ALENE, ID. 11/17/2009.
CC: DUTTONS REMODELING - BRIAN DUTTON
CITY OF TIGARD BUILDING DIVISION
BRADFORD CONRAD CROW ENGINEERING CO
DUTTONS REMODELING - BRIAN DUTTON
Page: 1
O Main Office Salem Office Bend Office
Carlson Testing Inc. 8a30 SN'f /un_i.(er 4000 HO4 S�., AE Ben?, 01)97702
Phone H11
Two, 1p Ap 8430 S. fl 9 ri fl e Salem, OR 97301 Bend, OR V0?
Phone: 003) 634 -3460 Phone (503) 539 -1352 Phone: (541) 330 -9155
Far: (5031604-0950 Far: (5031 509 -1309 Far /54/) 330 -9/63
Construction Materials Testing & Inspection
5) 2- -
Special Inspection 60/5
FINAL SUMMARY LETTER
December 14, 2009
T0901252
City of Tigard
13125 SW Hall Blvd
Tigard, OR 97223 -8199
Attn: Building Department
Re: Westgate Baptist Church — Stage Extension
10730 SW 130` Avenue — Tigard, OR
Permit No.: BUP2009 -00155
Dear Sir or Madam:
This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special
inspection of the following item(s) per our inspection reports only:
Reinforced Concrete
Installation of Cast in Place Anchors
Structural Welding
All inspections and tests were performed and reported according to the requirements of Project Documents and, to the
best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders
and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's
design changes, approvals and verbal instructions.
Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in
full, without prior authorization from this office. Under all circumstances, the information contained in this report is
provided subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No
party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information
contained in this document.
If there are any further questions regarding this matter, please do not hesitate to contact this office.
Respectfully submitted,
CARLSON TESTING, INC.
Steven W. Leach
6
Project Manager
SWL /rb
cc: Duttons Remodeling — Brian Dutton 503 524 -4560
City of Tigard Building Division
Bradford Conrad Crow Engineering Co 503 213 -2018
•
Carlson Testing, Inc.
Incompleted Items List (NCL)
Dec 14, 2009
T0901252.
Project Name: WESTGATE BAPTIST CHURCH - STAGE EXTENSION
Project Address: 10730 SW 130TH AVENUE TIGARD OR
Permit No: BUP2009 -00155
P.O. No: Project Manager: STEVEN W . LEACH
Item # Insp. Date Item Description Compliance CTI Sign -Off Date
Corrected
1 BT 10/23/2009 ALL WELDS FAB SHOP PAINTED FOR STAGE ASSEMBLIES ACCEPTABLE PER STEVEN W. LEACH 12/14/2009
TOP AND BOTTOM. ENGINEER'S LETTER DATED
11/17/2009.
2 BT 10/23/2009 NO MATERIAL CERTIFICATIONS AT TIME OF INSPECTION. ACCEPTABLE PER STEVEN W. LEACH 12/14/2009
ENGINEER'S LETTER DATED
11/17/2009.
3 BT 10/23/2009 NO FAB SHOP SPECIAL INSPECTIONS PERFORMED AT ACCEPTABLE PER STEVEN W. LEACH 12/14/2.009
SCHUON MANUFACI'UERING CO INC (SMCI), COEURD' ENGINEER'S LETTER DATED
ALENE, ID. 11/17/2009.
CC: DUTTONS REMODELING - BRIAN DUTTON
CITY OF TIGARD BUILDING DIVISION
BRADFORD CONRAD CROW ENGINEERING CO
DUTTONS REMODELING - BRIAN DUTTON
Page: 1
DEC -15 -2009 TUE 10:33 AM CARLSON TESTING INC, FAX NO 5036840954 P. 02/03
®n ti + Afrin . Offla V SYrkxr Office Mid OM, i.
S4411511' llo_IACr 41 /gerla�nn )c. NI? Ado -'s OR no Rd 41 Tipxril, OH P722 Strhm. Pl( U7 r17! &O. OR U77Ir?
()J11.I JIM11.
plmru; WV) P4-3460 Phone. (M.1).10.12.12 (M.1).10.12.12 (M.1).10.12.12 /'hnrrr':
Construction Materials Testing & Inspection fn: l.f2i1 -OUS4 fn,; (30.11.1119 -130V Rd 11J/l.i.ill -U/AJ
a 2&,0 7
Special Inspection
FINAL SUMMARY LETTER
December 14, 2009
T0901252
City of Tigard
13125 SW Hall Blvd
Tigard, OR 97223 -8199
Attn: Building Department
Re: Westgate Baptist Church — Stage Extension
10730 SW 130 Avenue — Tigard, OR
Permit No.: BUP2009 -00155
Dear Sir or Madam:
This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special
inspection of the following item(s) per our inspection reports only:
Reinforced Concrete
Installation of Cast in Place Anchors
Structural Welding
All inspections and tests were performed and reported according to the requirements of Project Documents and, to the
best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders
and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's
design changes, approvals and verbal instructions.
Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in
full, without prior authorization from this office. Under all circumstances, the information contained in this report is
provided subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No
party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information
contained in this document.
If there are any further questions regarding this matter, please do not hesitate to contact this office.
Respectfully submitted,
CARLSON TESTING, INC.
Leven W. Leach
Project Manager
S W L /rb
cc: Duttons Remodeling -- Brian Dutton 503 524 - 4560
City of Tigard Building Division
Bradford Conrad Crow Engineering Co 503 213 - 2018
Carlson Testing, Inc.
Incompleted Items List (NCL)
Dec14,2009 c)
T0901252. csi
RD
Project Name: WESTGATE BAPTIST CHURCH - STAGE EXTENSION CD CD
Project Address: 10730 SW 130TH AVEhuE TIGARD OR
00
Permit No: BTUP2009 -00155 r C
P,O. No: Project Manager: STEVEN to . LEACH _
CD
Date co
Item # Insp. Date Item Description Compliance CTI Sign -Off
Corrected m>
1 BT 10/23/2009 ALL WELDS FAB S OP PAINTED FOR STAGS ASSEMBLIES ACCEPTABLE PER STEVEN i4. LEACH 12/14/2009
TOP AND BOTTOM. ENGINEER'S LETTER DATED n
11/17/2009. L-
CD
O
2 BT 10/23/2009 NO MATERIAL C9RTIFICATIONS AT TIME OF INSPECTION. ACCEPTABLE PBR STEVEN W. LEACH 12/14/2009
ENGINEER' S LETTER DATA m UD
11/17/2009.
:
3 II_ 10/23/2009 NO FAB SHOP SPECIAL INSPECTIONS PERFORMED AT ACCEPTABLE PER S3'NVRN W. rLE&D4 12/14/2009
SCHUON MANU CO INC (SMCJ) , COEURD ' ENGINEER'S LETTER DATED cD
ALENE, ID. 11/17/2009.
CM
CD
CO
CD
CO
0
CO
01
.rte
CC:DUTTONS REMODELING - BRIAN DUTTON
CITY OF ! IGARD BUILDING DIVISION -p
BRADFORD CONRAD CROW ENGINEERING CO
CD
DDTTONS REMODELING - BRIAN DUTTON
CD
Page: 1 w
DEC -15 -2009 TUE 10:33 AM CARLSON TESTING INC, FAX NO. 5036840954 P. 01/03
CARLSON TESTING, INC.
Phone: 503 - 684- 3460/Fax 503 -684 -0954
PO Box 23814 - Tigard, OR 97223
FAX TRANSMITTAL
To: City of Tigard
Attn: Building Department
Fax; 503- 624 -3681
From: Carlson Testing, Inc. — Rachel Barnett
Date: December 15, 2009
Re: FINAL SUMMARY LETTER Total Pages: 3
This is the Final Summary Letter for:
Project: Westgate Baptist Church — Stage Extension
Permit # BUP2009 -00155
Please call if you have any questions. 503- 684 -3460,
Thank You,
Rachel Barnett
Office Assistant